2017 Nevada Revised Statutes
Chapter 533 - Adjudication of Vested Water Rights; Appropriation of Public Waters
NRS 533.095 - Notice of entry of order and pendency of proceedings: Preparation; contents; publication.

Universal Citation: NV Rev Stat § 533.095 (2017)

1. As soon as practicable after the State Engineer shall make and enter the order granting the petition or selecting the streams upon which the determination of rights is to begin, the State Engineer shall prepare a notice setting forth the fact of the entry of the order and of the pendency of the proceedings.

2. The notice shall:

(a) Name a date when the State Engineer or the State Engineer’s assistants shall begin the examination.

(b) Set forth that all claimants to rights in the waters of the stream system are required, as provided in this chapter, to make proof of their claims.

3. The notice shall be published for a period of 4 consecutive weeks in one or more newspapers of general circulation within the boundaries of the stream system.

[19:140:1913; 1919 RL p. 3228; NCL § 7906]

Disclaimer: These codes may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.