2017 Nebraska Revised Statutes
Chapter 39 - HIGHWAYS AND BRIDGES
39-2802 Terms, defined.

Universal Citation: NE Code § 39-2802 (2017)

39-2802. Terms, defined.

For purposes of the Transportation Innovation Act:

(1) Alternative technical concept means changes suggested by a qualified, eligible, short-listed design-builder to the department’s basic configurations, project scope, design, or construction criteria;

(2) Best value-based selection process means a process of selecting a design-builder using price, schedule, and qualifications for evaluation factors;

(3) Construction manager means the legal entity which proposes to enter into a construction manager-general contractor contract pursuant to the act;

(4) Construction manager-general contractor contract means a contract which is subject to a qualification-based selection process between the department and a construction manager to furnish preconstruction services during the design development phase of the project and, if an agreement can be reached which is satisfactory to the department, construction services for the construction phase of the project;

(5) Construction services means activities associated with building the project;

(6) Department means the Department of Transportation;

(7) Design-build contract means a contract between the department and a design-builder which is subject to a best value-based selection process to furnish (a) architectural, engineering, and related design services and (b) labor, materials, supplies, equipment, and construction services;

(8) Design-builder means the legal entity which proposes to enter into a design-build contract;

(9) Multimodal transportation network means the interconnected system of highways, roads, streets, rail lines, river ports, and transit systems which facilitates the movement of people and freight to enhance Nebraska's economy;

(10) Preconstruction services means all nonconstruction-related services that a construction manager performs in relation to the design of the project before execution of a contract for construction services. Preconstruction services includes, but is not limited to, cost estimating, value engineering studies, constructability reviews, delivery schedule assessments, and life-cycle analysis;

(11) Project performance criteria means the performance requirements of the project suitable to allow the design-builder to make a proposal. Performance requirements shall include, but are not limited to, the following, if required by the project: Capacity, durability, standards, ingress and egress requirements, description of the site, surveys, soil and environmental information concerning the site, material quality standards, design and milestone dates, site development requirements, compliance with applicable law, and other criteria for the intended use of the project;

(12) Proposal means an offer in response to a request for proposals (a) by a design-builder to enter into a design-build contract or (b) by a construction manager to enter into a construction manager-general contractor contract;

(13) Qualification-based selection process means a process of selecting a construction manager based on qualifications;

(14) Request for proposals means the documentation by which the department solicits proposals; and

(15) Request for qualifications means the documentation or publication by which the department solicits qualifications.

Source

  • Laws 2016, LB960, § 2;
  • Laws 2017, LB339, § 173.
  • Operative Date: July 1, 2017

Disclaimer: These codes may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.