2015 Nebraska Revised Statutes
Chapter 39 - HIGHWAYS AND BRIDGES
39-1818 Water impoundment structure; approval; criteria considered.

NE Code § 39-1818 (2015) What's This?

39-1818. Water impoundment structure; approval; criteria considered.

A water impoundment structure which will result in temporary storage and flowage of water upon, across, or adjacent to a road upstream from such structure may be approved only if such road would not be inundated because of the storage in such structure of waters from a ten-year, twenty-four-hour or lesser frequency storm. A water impoundment structure which will also serve as a roadbed may be approved and constructed only if the structure would contain the runoff from a twenty-five-year, twenty-four-hour frequency storm without water overtopping such structure or being discharged through its emergency spillway, except that if the road which is subject to such inundation is classified as a local road or remote residential road with current average daily traffic of fifty vehicles or less, the containment of a ten-year, twenty-four-hour frequency storm shall be sufficient. In making the storm frequency determinations required by this section, any recognized method may be used.

Source

  • Laws 1979, LB 265, § 2;
  • Laws 1988, LB 903, § 2;
  • Laws 2008, LB1068, § 3.

Disclaimer: These codes may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.