2005 Minnesota Statutes - 116C.577 — Emergency permit.


116C.577 Emergency permit.
(a) Any utility whose electric power system requires the immediate construction of a large electric power generating plant or high-voltage transmission line due to a major unforeseen event may apply to the commission for an emergency permit. The application shall provide notice in writing of the major unforeseen event and the need for immediate construction. The permit must be issued in a timely manner, no later than 195 days after the commission's acceptance of the application and upon a finding by the commission that (1) a demonstrable emergency exists, (2) the emergency requires immediate construction, and (3) adherence to the procedures and time schedules specified in section 116C.57 would jeopardize the utility's electric power system or would jeopardize the utility's ability to meet the electric needs of its customers in an orderly and timely manner.
(b) A public hearing to determine if an emergency exists must be held within 90 days of the application. The commission, after notice and hearing, shall adopt rules specifying the criteria for emergency certification.
HIST: 2001 c 212 art 7 s 16; 2005 c 97 art 3 s 8

Disclaimer: These codes may not be the most recent version. Minnesota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.