2005 Minnesota Statutes - 103E.271 — Detailed survey.


103E.271 Detailed survey.
Subdivision 1. Survey and examination. When an order for a detailed survey is filed, the engineer shall proceed to survey the lines of the proposed drainage project in the preliminary hearing order, and survey and examine affected property.
Subd. 2. Survey requirements. All drainage lines must be surveyed in 100-foot stations and elevations must be based on standard sea level datum, if practical. Bench marks must be established on permanent objects along the drainage line, not more than one mile apart. Field notes made by the engineer must be entered in bound field books and preserved by the engineer until they are filed with the auditor.
HIST: 1990 c 391 art 5 s 42

Disclaimer: These codes may not be the most recent version. Minnesota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.