2019 Maryland Code
Environment
Title 5 - Water Resources
Subtitle 5 - Appropriation or Use of Waters, Reservoirs, and Dams
§ 5-506. Processing applications; hearings.

Universal Citation: MD Env Code § 5-506 (2019)

    (a)    Upon application for a permit under this subtitle, and except as otherwise provided in this section, the procedures in § 5–204 of this title shall apply.

    (b)    Under the following conditions, the Department may waive the notice requirements and the holding of a public informational hearing on a permit application:

        (1)    If there is an emergency or a request to make minor repairs, the Department, upon written or oral application, may grant an application to repair any reservoir, dam, or waterway obstruction without notice or hearing. Repair necessary to save life or property may be made without an application, but notice shall be given promptly to the Department;

        (2)    If plans of other projects which conform to water resources development plans accepted and adopted by the Department were subject to public hearing, and the Department’s review finds no changed conditions in them since the last public review and comment to justify another hearing;

        (3)    If temporary structures constructed to provide access across streams during construction operations or to trap sediment or achieve another similar purpose meet minimum design standards the Department establishes, and are removed completely, in a manner acceptable to the Department, within 6 months after need for the structure is terminated;

        (4)    If the requested waterway construction permit is for temporary excavation, filling, or grading for the installation of utilities which meet minimum design standards acceptable to the Department and preconstruction contours which are to be reestablished upon installation of the utility;

        (5)    If the requested waterway construction permit is for clearing and grading activities disturbing less than 5,000 square feet of land area and disturbing less than 100 cubic yards of earth; or

        (6)    If the requested waterway construction permit is for livestock crossing of a stream.

    (c)    If contiguous property owners and interested persons who receive periodic reports are notified under § 5–204 of this title, the Department may waive the notice requirements of this section and the holding of a public informational hearing on a permit application for roads, bridges, or culverts if they meet minimum design standards acceptable to the Department and construction does not adversely affect known water resources projects.

    (d)    The Department shall waive notice requirements and the holding of a public hearing if the requested appropriation or use of waters of the State is for an agricultural use in effect prior to July 1, 1993.

    (e)    Notwithstanding any other requirement of this section:

        (1)    The Department may waive the notice and hearing requirements of this section if the appropriation requested is for:

            (i)    An average annual water use of 10,000 gallons per day or less; or

            (ii)    A construction dewatering project; and

        (2)    The Department may waive the holding of a public informational hearing if the requested appropriation or use of waters of the State is greater than an average annual water use of 10,000 gallons per day but less than an average annual water use of 50,000 gallons per day.

Disclaimer: These codes may not be the most recent version. Maryland may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.