Maryland Real Property Section 13-307
§ 13-307.
  (a)   The warrant shall recite:
    (1)   The name and address of the applicant;
    (2)   The date when the application was docketed;
    (3)   The nature of the request made in the application; and
    (4)   A description of the land to be surveyed, as described in the application.
  (b)   The warrant shall direct the surveyor to:
    (1)   Within 30 days of receipt of the warrant, acknowledge its receipt in writing to the Commissioner;
    (2)   Specify in the acknowledgement a date, time, and place for making the survey, which date may be no earlier than 10 days and no later than six months after the last publication of notice required by § 13-308 of this subtitle;
    (3)   Lay out and survey the land as specified in the acknowledgement;
    (4)   Prepare an accurate plat and metes-and-bounds description of the land to be surveyed;
    (5)   In a resurvey that discloses an error in any previous survey, correct the error;
    (6)   Compute the area of any land included within the description and plat; and
    (7)   Within six months from the date the notice of warrant was last published, return his certificate of survey on these matters, together with all duplicates required by § 13-310(a)(1) of this subtitle, to the Commissioner.
  (c)   The Commissioner shall sign the warrant and affix the seal for land patent proceedings to it.