.212 Filing of plans for electrical interconnection with merchant electric generating facility -- Costs of upgrading existing grid.

Universal Citation: KY Rev Stat § 278.212 (2018)

Download as PDF
278.212 Filing of plans for electrical interconnection with merchant electric generating facility -- Costs of upgrading existing grid. (1) (2) No utility shall begin the construction or installation of any property, equipment, or facility to establish an electrical interconnection with a merchant electric generating facility in excess of ten megawatts (10MW) until the plans and specifications for the electrical interconnection have been filed with the commission. Notwithstanding any other provision of law, any costs or expenses associated with upgrading the existing electricity transmission grid, as a result of the additional load caused by a merchant electric generating facility, shall be borne solely by the person constructing the merchant electric generating facility and shall in no way be borne by the retail electric customers of the Commonwealth. Effective: April 24, 2002 History: Created 2002 Ky. Acts ch. 365, sec. 11, effective April 24, 2002.
Disclaimer: These codes may not be the most recent version. Kentucky may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.