2025 Indiana Code
Title 8. Utilities and Transportation
Article 1. Utilities Generally
Chapter 42. Default Standards for Commercial Solar Energy Systems
- 8-1-42-1. Applicability; "Solar Energy Ready Community"
- 8-1-42-2. "Commercial Solar Energy System"
- 8-1-42-3. "Commercial Solar Regulation"
- 8-1-42-4. "Dwelling"
- 8-1-42-5. "Nonparticipating Property"
- 8-1-42-6. "Permit Authority"
- 8-1-42-7. "Project Owner"
- 8-1-42-8. "Unit"
- 8-1-42-9. Permit Authority Responsible for Enforcing Compliance With Standards; Authority to Adopt Less Restrictive Standards or to Waive or Make Less Restrictive Existing Standards; Unit's Planning and Zoning Powers Not Affected
- 8-1-42-10. Setback Requirements; Highways, Collector Roads, and Local Roads; Nonparticipating Properties; Landscape Buffer; Height Restriction; Waiver of Setback and Buffer Requirements With Consent of Nonparticipating Property Owner
- 8-1-42-11. Ground Cover; Vegetation Plan
- 8-1-42-12. Fencing
- 8-1-42-13. Underground Cables; Aboveground Infrastructure; Depth of Buried Cables; Cables and Lines Outside of Project Site
- 8-1-42-14. Glare Minimization; Adjacent Properties and Roadways; Vehicular Traffic
- 8-1-42-15. Signal Interference
- 8-1-42-16. Sound Level Limitations; Waiver of Requirement With Consent of Owners of Adjacent Nonparticipating Properties
- 8-1-42-17. Damage to Drainage Infrastructure; Repair; Installation of New Infrastructure
- 8-1-42-18. Decommissioning and Site Restoration Plan; Posting of Surety Bond or Equivalent Security; Required Posting Increments; Adjustment of Bond or Security After Periodic Reevaluation of Decommissioning Costs; Costs to Be Net of Estimated Salvage Value; Project Owner's Notice of Intent to Decommission Cse System; Ground Restoration; Project Owner's Failure to Remove Project Assets; Assets Allowed to Remain in Place With Landowner's Consent
- 8-1-42-19. Cse System's Failure to Generate Electricity; Presumed Abandonment; Required Removal of Project Assets; Project Owner's Failure to Remove Assets; Removal of Assets by Permit Authority; Recovery of Costs
- 8-1-42-20. "Force Majeure Event"; Cessation of Electricity Generation; Project Owner's Notice to Permit Authority; Failure to Resume Operations; Presumed Abandonment; Project Owner's Failure to Remove Assets; Removal of Assets by Permit Authority; Recovery of Costs
Disclaimer: These codes may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.