36-1-12.5-6. Report Before Installation or Remodeling

Universal Citation:
IN Code § 36-1-12.5-6 (2024)
Learn more This media-neutral citation is based on the American Association of Law Libraries Universal Citation Guide and is not necessarily the official citation.

Sec. 6. (a) Before the public utility or the qualified provider may install equipment in, make modifications to, or remodel a building or complex of buildings under a utility efficiency program or a guaranteed savings contract, the public utility or the qualified provider (whichever applies) must issue a report that includes estimates for the following:

(1) All costs attributable to the work stipulated in the agreement or the contract, including the costs of design, engineering, installation, maintenance, repairs, or debt service.

(2) The amounts by which:

(A) energy or water consumption;

(B) wastewater costs; or

(C) operating costs;

will be reduced.

(3) The amounts by which billable revenues will be increased.

(b) The report must also contain a listing of contractors and subcontractors to be used by the public utility or the qualified provider with respect to the conservation measures.

As added by P.L.24-1993, SEC.6. Amended by P.L.168-2006, SEC.14.

Disclaimer: These codes may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.