2006 Indiana Code - CHAPTER 18. GENERAL COAL MINE PERMITS
IC 13-18-18Chapter 18. General Coal Mine Permits
IC 13-18-18-1
Rules
Sec. 1. The board with jurisdiction over National Pollutant
Discharge Elimination System permits for coal mines shall adopt
rules under IC 4-22-2 to establish a general coal mine permit that
may be obtained for a facility instead of obtaining another more
specialized National Pollutant Discharge Elimination System coal
mine permit.
As added by P.L.1-1996, SEC.8.
IC 13-18-18-2
Criteria for consideration
Sec. 2. The board shall determine the criteria that must be met to
qualify for the general permit.
As added by P.L.1-1996, SEC.8.
IC 13-18-18-3
Notice of intent
Sec. 3. The rules adopted under this chapter must allow a coal
mine operator the option of submitting a notice of intent to be
governed by the general permit requirements before the requirements
apply to the coal mine operator.
As added by P.L.1-1996, SEC.8.
Disclaimer: These codes may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.