2021 Hawaii Revised Statutes
Title 12. Conservation and Resources
174C. State Water Code
174C-85 Well completion report.

Universal Citation: HI Rev Stat § 174C-85 (2021)

§174C-85 Well completion report. Within thirty days after the completion of the well, the well driller and pump installation contractor shall file with the commission a written report containing such information prescribed by the commission, including, as appropriate: the depth, thickness, and character of the different strata penetrated and the location of water-bearing strata; the date of completion of the well; the length, size, and weight of the casing and a description of the placement of the casing; the size of the drilled hole; where the well is sealed off; the type of seal; the number of cubic feet per second or gallons per minute of flow from the well; the pressure in pounds per square inch, if a flowing well, and the static water level and water temperature, if a nonflowing well; and a chemical analysis of a water sample drawn from the well. [L 1987, c 45, pt of §2]

Disclaimer: These codes may not be the most recent version. Hawaii may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.