2018 Georgia Code
Title 25 - Fire Protection and Safety
Chapter 9 - Blasting or Excavating Near Utility Facilities
§ 25-9-4. Design locate request and response

Universal Citation: GA Code § 25-9-4 (2018)
  • (a) Any person may submit a design locate request to the UPC. Such design locate request shall:

    • (1) Describe the tract or parcel of land for which the design locate request has been submitted with sufficient particularity, as defined by policies developed and promulgated by the UPC, to enable the facility owner or operator to ascertain the precise tract or parcel of land involved; and

    • (2) State the name, address, and telephone number of the person who has submitted the design locate request, as well as the name, address, and telephone number of any other person authorized to review any records subject to inspection as provided in paragraph (3) of subsection (b) of this Code section.

  • (b) Within ten working days after a design locate request has been submitted to the UPC for a proposed project, the facility owner or operator shall respond by the method requested by the person calling in the design locate request:

    • (1) Designate or cause to be designated by a locator in accordance with Code Sections 25-9-7 and 25-9-9 the location of all utility facilities and sewer laterals within the area of the proposed excavation;

    • (2) Provide to the person submitting the design locate request the best available description of all utility facilities and sewer laterals in the area of proposed excavation, which might include drawings of utility facilities and sewer laterals already built in the area, or other facility records that are maintained by the facility owner or operator; or

    • (3) Allow the person submitting the design locate request or any other authorized person to inspect or copy the drawings or other records for all utility facilities and sewer laterals within the proposed area of excavation.

  • (c) Upon responding using any of the methods provided in subsection (b) of this Code section, the facility owner or operator shall provide the response to the UPC in accordance with UPC procedures.

  • (d) A design locate request shall not be used for excavation purposes.

Disclaimer: These codes may not be the most recent version. Georgia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.