2010 Georgia Code
TITLE 12 - CONSERVATION AND NATURAL RESOURCES
CHAPTER 5 - WATER RESOURCES
ARTICLE 2 - CONTROL OF WATER POLLUTION AND SURFACE-WATER USE
§ 12-5-31.1 - Applications, permits, and variances for public water supply reservoirs

O.C.G.A. 12-5-31.1 (2010)
12-5-31.1. Applications, permits, and variances for public water supply reservoirs


(a) Upon request of any local government entity that desires to construct a new public water supply reservoir for which permits and certifications under Code Section 12-5-31 and Sections 401 and 404 of the federal Clean Water Act, 33 U.S.C. Sections 1341 and 1344, are required, the division shall make available in a single collection copies of all forms necessary for the purposes of making applications for such permits.

(b) The period for granting or denying a permit application provided by subparagraph (c)(1)(A) of Code Section 12-2-2 shall likewise apply to decisions to issue certifications for purposes of Section 401 of the federal Clean Water Act, 33 U.S.C. Section 1341, justifications of need, and minimum instream flow certifications for construction of a new public water supply reservoir by a local government entity; and such shall be issued simultaneously to a local government entity that is a qualified applicant.

(c) The division shall issue an affirmative variance from the requirements of Chapter 7 of this title, consistent with the exemption granted by paragraph (11) of Code Section 12-7-17, to a permittee within seven days after granting the permit and issuing the certifications and documents specified under subsection (b) of this Code section.

Disclaimer: These codes may not be the most recent version. Georgia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.