2012 Florida Statutes
TITLE XXIX — PUBLIC HEALTH
Chapter 403 — ENVIRONMENTAL CONTROL
PART I — POLLUTION CONTROL
403.0881 — Wastewater or reuse or disposal systems or water treatment works; construction permits.


FL Stat § 403.0881 (2012 through 2nd Reg Sess) What's This?

403.0881 Wastewater or reuse or disposal systems or water treatment works; construction permits.—The department may issue construction permits under s. 403.087 for wastewater systems, treatment works, or reuse or disposal systems based upon review of a preliminary design report, application forms, and other required information, all of which shall be formulated by department rule. Detailed construction plans and specifications shall not be required prior to issuance of a permit or a modification to a permit required under s. 403.087 or an operation permit required under s. 403.0885 unless such plans and specifications are required to secure federal funding and the project is expected to receive federal funding. Upon a demonstration that a system constructed in accordance with a construction permit issued pursuant to s. 403.087 operates as designed, the department shall issue a permit for operation of the system. However, an operation permit may be issued prior to the initiation of discharge, provided the department has reasonable assurance, based on the system design, that the provisions of s. 403.088 will be met.

History.—s. 3, ch. 87-125; s. 75, ch. 93-213.

Disclaimer: These codes may not be the most recent version. Florida may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.