2012 Connecticut General Statutes
Title 4b - State Real Property
Chapter 59 - State Real Property
Section 4b-16 - Outdoor luminaires on the grounds of state buildings or facilities.


CT Gen Stat § 4b-16 (2012) What's This?

(a) As used in this section:

(1) “Fixture” means the assembly that holds a lamp and may include an assembly housing, a mounting bracket or pole socket, a lamp holder, a ballast, a reflector or mirror and a refractor or lens;

(2) “Restricted uplight luminaire” means a luminaire that allows no direct light emissions above a horizontal plane through the luminaire’s lowest light-emitting part other than a 0.5 per cent maximum incidental uplight from reflection off mounting hardware;

(3) “Glare” means direct light emitting from a luminaire that causes reduced vision or momentary blindness;

(4) “Illuminance” means the level of light measured at a surface;

(5) “Lamp” means the component of a luminaire that produces the light;

(6) “Light trespass” means light emitted by a luminaire that shines beyond the boundaries of the property on which the luminaire is located;

(7) “Lumen” means a unit of measurement of luminous flux;

(8) “Luminaire” means the complete lighting unit, including the lamp and the fixture;

(9) “Permanent outdoor luminaire” means any luminaire or system of luminaires that is outdoors and intended to be used for seven days or longer; and

(10) “State funds” means any bond revenues or any money appropriated or allocated by the General Assembly.

(b) Except as provided in subsection (c) of this section, no state funds shall be used to install or replace a permanent outdoor luminaire for lighting on the grounds of any state building or facility unless (1) the luminaire is designed to maximize energy conservation and to minimize light pollution, glare and light trespass, (2) the luminaire’s illuminance is equal to the minimum illuminance adequate for the intended purpose of the lighting, and (3) for a luminaire with a rated output of more than one thousand eight hundred lumens, such luminaire is a restricted uplight luminaire.

(c) The provisions of subdivision (3) of subsection (b) of this section shall not apply to luminaires located on the grounds of any correctional institution or facility administered by the Commissioner of Correction, required by federal regulations, required for storm operation activities performed by the Department of Transportation, required to illuminate either the state flag or the flag of the United States or in a lighting plan for a Department of Transportation facility where less than twenty-five per cent of the luminaires are to be replaced. The Commissioner of Construction Services, or the commissioner’s designee, may waive the provisions of subdivision (3) of subsection (b) of this section with respect to luminaires on the grounds of any other state building or facility when, after a request for such a waiver has been made and reviewed, the commissioner or the commissioner’s designee determines that such a waiver is necessary for the lighting application. Requests for such a waiver shall be made to the commissioner or the commissioner’s designee in such form as the commissioner shall prescribe and shall include, without limitation, a description of the lighting plan, a description of the efforts that have been made to comply with the provisions of subdivision (3) of subsection (b) of this section and the reasons such a waiver is necessary. In reviewing a request for such a waiver, the commissioner or the commissioner’s designee shall consider design safety, costs and other factors deemed appropriate by the commissioner or the commissioner’s designee.

(d) The provisions of this section shall not apply to the installation or replacement of luminaires for which the Secretary of the Office of Policy and Management (1) conducts a life-cycle cost analysis of one or more luminaires that meet the requirements set forth in subsection (b) of this section and one or more luminaires that do not meet such requirements, and (2) certifies that a luminaire which meets such requirements is not cost effective and is not the most appropriate alternative based on the life-cycle cost analysis.

(P.A. 06-86, S. 1; P.A. 11-51, S. 90.)

History: P.A. 06-86 effective July 1, 2006; pursuant to P.A. 11-51, “Commissioner of Public Works” was changed editorially by the Revisors to “Commissioner of Construction Services” in Subsec. (c), effective July 1, 2011.

Disclaimer: These codes may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.