      Sec. 42a-3-113. Date of instrument. (a) An instrument may be antedated or postdated. The date stated determines the time of payment if the instrument is payable at a fixed period after date. Except as provided in section 42a-4-401(c), an instrument payable on demand is not payable before the date of the instrument.

      (b) If an instrument is undated, its date is the date of its issue or, in the case of an unissued instrument, the date it first comes into possession of a holder.

      (1959, P.A. 133, S. 3-113; P.A. 91-304, S. 13.)

      History: P.A. 91-304 entirely replaced former provisions re instrument under seal with provisions re date of instrument, a restatement in part of Sec. 42a-3-114, revised to 1991.

Disclaimer: These codes may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.