2011 Connecticut Code
Title 22a Environmental Protection
Chapter 446 Nuclear Energy
Sec. 22a-136. Moratorium on construction of nuclear power facilities.

      Sec. 22a-136. Moratorium on construction of nuclear power facilities. No construction shall commence on a fifth nuclear power facility until the Commissioner of Environmental Protection finds that the United States Government, through its authorized agency, has identified and approved a demonstrable technology or means for the disposal of high level nuclear waste. As used in this section, "high level nuclear waste" means those aqueous wastes resulting from the operation of the first cycle of the solvent extraction system or equivalent and the concentrated wastes of the subsequent extraction cycles or equivalent in a facility for reprocessing irradiated reactor fuel and shall include spent fuel assemblies prior to fuel reprocessing.

      (P.A. 79-487.)

Disclaimer: These codes may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.