Sec. 7-222a. Rate for interconnection of generation facilities.
Sec. 7-222a. Rate for interconnection of generation facilities. Not later than October 1, 2004, each municipal electric utility, including any participating municipal
electric utility, as defined in section 16-1, shall, in consultation with the municipal electric energy cooperative established under chapter 101a, set, pursuant to section 7-222,
a rate for the interconnection of generation facilities into its transmission and distribution
system, which generation facilities are located in the service territory of the municipal
electric utility and began operations after June 26, 2003.(P.A. 03-135, S. 16.)
History: P.A. 03-135 effective June 26, 2003.
Disclaimer: These codes may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.