2021 California Code
Public Utilities Code - PUC
DIVISION 2 - REGULATION OF RELATED BUSINESSES BY THE PUBLIC UTILITIES COMMISSION
CHAPTER 4.1 - Enforcement of Federal Pipeline Safety Standards for Propane Operators
Section 4455.

4455.  

Except as specified in Section 4456, after each inspection, the commission shall furnish the operator, or a representative designated in writing by the operator, with a written copy of the inspection report within 30 days of the inspection. The report shall indicate any violations of applicable federal or state pipeline safety regulations. The operator shall then file, within 30 days, a written response with the commission that acknowledges receipt of the report and specifies a compliance plan for correcting the safety violations, including, if appropriate, a timetable for completing necessary repairs or improvements to the distribution system.

(Added by Stats. 1994, Ch. 388, Sec. 1. Effective January 1, 1995.)

Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.