2017 California Code
Water Code - WAT
DIVISION 26.7 - Water Quality, Supply, and Infrastructure Improvement Act of 2014
CHAPTER 8 - Statewide Water System Operational Improvement and Drought Preparedness
Section 79757.

Universal Citation: CA Water Code § 79757 (2017)
79757.  

(a) A project is not eligible for funding under this chapter unless, by January 1, 2022, all of the following conditions are met:

(1) All feasibility studies are complete and draft environmental documentation is available for public review.

(2) The commission makes a finding that the project is feasible, and will advance the long-term objectives of restoring ecological health and improving water management for beneficial uses of the Delta.

(3) The director receives commitments for not less than 75 percent of the nonpublic benefit cost share of the project.

(b) If compliance with subdivision (a) is delayed by litigation or failure to promulgate regulations, the date in subdivision (a) shall be extended by the commission for a time period that is equal to the time period of the delay, and funding under this chapter that has been dedicated to the project shall be encumbered until the time at which the litigation is completed or the regulations have been promulgated.

(Added by Stats. 2014, Ch. 188, Sec. 8. (AB 1471) Approved in Proposition 1 at the November 4, 2014, election.)

Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.