2011 California Code
Streets and Highways Code
DIVISION 3. APPORTIONMENT AND EXPENDITURE OF HIGHWAY FUNDS [2004.5 - 2704.75]
CHAPTER 10. Grade Separation Projects
Section 2457


CA St & Hwy Code § 2457 (through 2012 Leg Sess) What's This?

Preconstruction costs (engineering, right-of-way, preparation of environmental impact reports, and utility relocation) expended by a local agency prior to any allocation shall be included in the total cost of the project even though expended prior to an allocation. Allocations shall be made for preconstruction costs to a local agency that submits evidence satisfactory to the department that the local agency will be able to meet the requirements for an allocation for construction costs, and that preconstruction costs will exceed the local share of the cost of the project. A local agency may also proceed with the advertising for bids and the construction of a project without prejudice to its right to receive an allocation if an allocation is, in fact, made for such project within the same fiscal year that the construction contract was awarded.

(Added by renumbering Section 2407 by Stats. 1974, Ch. 545.)

Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.