2011 California Code
Government Code
TITLE 1. GENERAL [100 - 7914]
ARTICLE 2. Regional Notification Center System
Section 4216.3


CA Govt Code § 4216.3 (through 2012 Leg Sess) What's This?

(a) (1) Any operator of a subsurface installation who receives timely notification of any proposed excavation work in accordance with Section 4216.2 shall, within two working days of that notification, excluding weekends and holidays, or before the start of the excavation work, whichever is later, or at a later time mutually agreeable to the operator and the excavator, locate and field mark the approximate location and, if known, the number of subsurface installations that may be affected by the excavation to the extent and degree of accuracy that the information is available either in the records of the operator or as determined through the use of standard locating techniques other than excavating, otherwise advise the person who contacted the center of the location of the operator s subsurface installations that may be affected by the excavation, or advise the person that the operator does not operate any subsurface installations that would be affected by the proposed excavation.

(2) Only a qualified person shall perform subsurface installation locating activities.

(3) A qualified person performing subsurface installation locating activities on behalf of a subsurface installation operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.

(4) Operators of high priority subsurface installations shall maintain and preserve all plans and records for its subsurface installations.

(b) Every operator of a subsurface installation who field marks the location of a subsurface installation shall make a reasonable effort to make field markings in conformance with the uniform color code of the American Public Works Association.

(c) If, at any time during an excavation for which there is a valid inquiry identification number, an operator s field markings are no longer reasonably visible, the excavator shall contact the appropriate regional notification center. The regional notification center shall contact any member, if known, who has a subsurface installation in the area of the excavation. Upon receiving timely notification or renotification pursuant to this subdivision, the operator shall re-locate and re-mark, within two working days, those subsurface installations that may be affected by the excavation to the extent necessary, in conformance with this section.

(d) The excavator shall notify the appropriate regional notification center of the failure of an operator to comply with this section. The notification shall include the inquiry identification number issued by the regional notification center. A record of all notifications received pursuant to this subdivision shall be maintained by the regional notification center for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (d) of Section 4216.2.

(Amended by Stats. 2006, Ch. 651, Sec. 3. Effective January 1, 2007.)

Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.