2821. (a) The commission shall approve and establish equitable charges to be paid by an electrical corporation which purchases electricity or electrical generating capacity, or both, from any private energy producer employing other than a conventional power source for the generation of electricity. (b) The commission, on its own motion or on application of an electrical corporation or a private energy producer, may also specify the prices, terms, and conditions for the purchase or sale of electricity or electrical generating capacity, or both, between an electrical corporation and a private energy producer, and these prices, terms, and conditions, so specified, shall be considered reasonable and prudent for all purposes. The commission may act to specify these prices, terms, and conditions on its own motion or on application of an electrical corporation or a private energy producer. (c) Every private energy producer employing hydroelectric facilities, who executes a contract with an electrical corporation on or after January 1, 1988, or prior to that date, for the purchase of electricity or electrical generating capacity, or both, shall obtain and provide proof of compliance by the private energy producer with all state laws relating to the control, appropriation, use, and distribution of water, including, but not limited to, the obtaining of applicable licenses and permits. The private energy producer shall also provide proof of compliance with the federal Clean Water Act. (d) (1) For the purpose of providing proof of compliance with all state laws relating to the control, appropriation, use, and distribution of water, the electrical corporation shall require the private energy producer to provide either of the following: (A) Certification from the State Water Resources Control Board that a water right permit has been issued for the operation of the hydroelectric facility. (B) Certification from the State Water Resources Control Board that, in the opinion of the board, the private energy producer possesses riparian rights or other water rights which authorize the operation of the hydroelectric facility. (2) The requirements of paragraph (1) shall apply only to contracts involving hydroelectric projects which have not been accepted by the electrical corporation for commercial operation prior to May 18, 1987. (3) Every contract executed by a private energy producer who is in violation of paragraph (1) is void and unenforceable on and after whichever of the following dates applies: (A) February 29, 1988, for contracts involving hydroelectric projects which have been accepted by the electrical corporation for commercial operation on or after May 18, 1987, and prior to January 1, 1988. (B) The 60th day after a project has been accepted by the electrical corporation for commercial operation, for contracts involving hydroelectric projects which are accepted by the electrical corporation for commercial operation on or after January 1, 1988. (4) The commission shall disallow, for purposes of establishing rates for an electrical corporation, all amounts expended for the purchase of electricity pursuant to a contract that is void and unenforceable under this subdivision. (e) (1) For the purposes of providing proof of compliance with the federal Clean Water Act, the electrical corporation shall require the private energy producer to provide a statement from the State Water Resources Control Board that certification pursuant to Section 401 of the federal Clean Water Act has either been granted or waived by the board for operation of the hydroelectric facility. The board shall not waive certification unless the board finds that there is reasonable assurance that the project shall comply with all applicable requirements of the federal Clean Water Act and state water quality laws. If the board cannot make this finding within the period provided for certification, the board shall either certify upon conditions that provide reasonable assurance of compliance or deny certification. (2) The requirements of paragraph (1) shall apply only to contracts involving hydroelectric projects which have not been accepted by the electrical corporation for commercial operation prior to January 1, 1992. (3) Every contract executed by a private energy producer who is in violation of paragraph (1) is void and unenforceable on and after whichever of the following dates applies: (A) March 1, 1993, for contracts involving hydroelectric projects which are accepted by the electrical corporation for commercial operation between January 1, 1992, and December 31, 1992. (B) The 60th day after having been accepted by the electrical corporation for commercial operation, for contracts involving hydroelectric projects which are accepted by the electrical corporation for commercial operation on or after January 1, 1993. (4) The commission shall disallow, for purposes of establishing rates for an electrical corporation, all amounts expended for the purchase of electricity pursuant to a contract that is void and unenforceable under this subdivision. (f) Subdivision (d) does not apply to any private energy producer if all of the following conditions are met: (1) The electrical corporation did not make timely written demand for the proof of compliance required by paragraph (1) of subdivision (d). (2) On or before the date the project was accepted by the electrical corporation for commercial operation, the private energy producer was in fact in compliance with all applicable state laws relating to the control, appropriation, use, and distribution of water, including, but not limited to, those laws that require the obtaining of all applicable entitlements. (3) Prior to October 14, 1991, the private energy producer has provided proof of the applicable certification from the State Water Resources Control Board pursuant to subparagraph (A) of paragraph (1) of subdivision (d), which proof contains further certification from the State Water Resources Control Board of the existence of the condition identified in paragraph (2) of subdivision (f). (g) For purposes of meeting the requirements of subdivision (d) or (e), or of providing certification required under Section 26013 of the Public Resources Code, the private energy producer shall furnish information as is reasonably required by the State Water Resources Control Board to document a claim of right, a certification, or a waiver. Every private energy producer requesting certification and a statement from the board pursuant to subdivisions (d) and (e), or to Section 26013 of the Public Resources Code, shall pay to the board at the time of filing the request, a fee of two hundred fifty dollars (0) to cover the reasonable cost of the board in evaluating and processing the certification request. (h) As used in this section, "Federal Clean Water Act" means the federal Water Pollution Control Act (Sections 1251 et seq. of Volume 33 of the United States Code) and acts amendatory thereof or supplementary thereto. 2821.5. The Legislature finds and declares all of the following: (a) Small power producers provide important alternative sources of electrical energy. (b) The commission is required to approve and establish equitable charges to be paid by electrical corporations which purchase electricity or electrical generating capacity, or both, from qualifying small power producers. (c) The commission recognized the importance of developing standard offer contracts based on long-run avoided costs in order to encourage the development of qualifying small power producers. On September 7, 1983, in Decision 83-09-054, the commission approved interim standard offer No. 4, which established a long-term power purchase contract. (d) Many pioneer small power producers operating prior to September 7, 1983, did so under power purchase contracts based on short-term energy prices and long-term capacity prices. When interim standard offer No. 4 was approved, the commission allowed its provisions to be offered to qualified facility projects which had not yet obtained construction financing or otherwise entered a contract and started construction. Pioneer small power producers with existing contracts were not allowed to switch to the new interim standard offer No. 4 until their existing contracts were no longer in effect. (e) On April 17, 1985, pursuant to Decision 85-04-075, the commission suspended all payment options offered under interim standard offer No. 4 due to the contrasting of excessive energy capacity, and the conclusion that prices were too high. (f) Many qualifying small power producers who were operating under contracts made prior to September 7, 1983, were thus precluded by the commission from adopting interim standard offer No. 4, and may be required to accept new prices and terms which provide less compensation than the suspended interim standard offer No. 4. (g) These financially stressed qualifying small power producers assert they were unfairly denied the opportunity to adopt interim standard offer No. 4 by the commission. They also assert that much of the capacity contracted for under the suspended interim standard offer No. 4 will never be constructed. They further allege that they are being forced to close small powerplants which are currently in operation while producers with interim standard offer No. 4 contracts are constructing new plants. 2822. The commission shall approve and establish standby charges for electrical corporations. The commission may act in this regard on its own motion or on application of an electrical corporation or a private energy producer. 2823. The commission shall approve and establish charges for transmission service. The commission may act in this regard on its own motion or on application of an electrical corporation or a private energy producer. 2824. (a) The commission shall conduct a review of the charges paid by electrical corporations for electricity generated from other than conventional power sources and furnished to such corporations. Following such review, the commission shall consider adjustments in such charges to encourage the generation of electricity from other than conventional power sources. (b) The commission shall conduct a review of standby charges charged by electrical corporations. Following such review, the commission shall consider adjustments in such charges to encourage the utilization of electricity generated from other than conventional power sources and to enable electrical corporations to review the costs of providing standby service. (c) The commission shall conduct a review of charges for transmission service made by electrical corporations for the transmission of electricity generated from other than conventional power sources. Following such review, the commission shall consider adjustments in such charges to encourage the generation of electricity from other than conventional power sources. 2826. (a) The commission shall establish requirements for the administration of power purchase contracts between electrical corporations and private energy producers. For any project which has not received all regulatory permits at the time of the commission' s review of a proposed project deferral agreement, the commission shall, at a minimum, apply both of the following requirements: (1) Prohibit payments by an electrical corporation to a private energy producer to defer the construction of a private energy project unless the private energy producer agrees to repay all deferral payments charged to ratepayers in the event the project is not constructed and operating by the time the deferral period expires. (2) Require the private energy producer to provide adequate security to ensure repayment of those ratepayer charges. (b) Subdivision (a) does not apply to a power purchase contract between an electrical corporation and a private energy producer which is a major customer of the electrical corporation, if the contract is negotiated pursuant to procedures prescribed by the commission and for the purpose of retaining that customer. 2826.5. (a) As used in this section, the following terms have the following meanings: (1) "Benefiting account" means an electricity account, or more than one account, mutually agreed upon by Pacific Gas and Electric Company and the City of Davis. (2) "Bill credit" means credits calculated based upon the electricity generation component of the rate schedule applicable to a benefiting account, as applied to the net metered quantities of electricity. (3) "PVUSA" means the photovoltaic electricity generation facility selected by the City of Davis, located at 24662 County Road, Davis, California, with a rated peak electricity generation capacity of 600 kilowatts, and as it may be expanded, not to exceed one megawatt of peak generation capacity. (4) "Net metered" means the electricity output from the PVUSA. (5) "Environmental attributes" associated with the PVUSA include, but are not limited to, the credits, benefits, emissions reductions, environmental air quality credits, and emissions reduction credits, offsets, and allowances, however entitled resulting from the avoidance of the emission of any gas, chemical, or other substance attributable to the PVUSA. (b) The City of Davis may elect to designate a benefiting account, or more than one account, to receive bill credit for the electricity generated by the PVUSA, if all of the following conditions are met: (1) A benefiting account receives service under a time-of-use rate schedule. (2) The electricity output of the PVUSA is metered for time of use to allow allocation of each bill credit to correspond to the time-of-use period of a benefiting account. (3) All costs associated with the metering requirements of paragraphs (1) and (2) are the responsibility of the City of Davis. (4) All electricity delivered to the electrical grid by the PVUSA is the property of Pacific Gas and Electric Company. (5) PVUSA does not sell electricity delivered to the electrical grid to a third party. (6) The right, title, and interest in the environmental attributes associated with the electricity delivered to the electrical grid by the PVUSA are the property of Nuon Renewable Ventures USA, LLC. (c) A benefiting account shall be billed on a monthly basis, as follows: (1) For all electricity usage, the rate schedule applicable to the benefiting account, including any surcharge, exit fee, or other cost recovery mechanism, as determined by the commission, to reimburse the Department of Water Resources for purchases of electricity, pursuant to Division 27 (commencing with Section 80000) of the Water Code. (2) The rate schedule for the benefiting account shall also provide credit for the generation component of the time-of-use rates for the electricity generated by the PVUSA that is delivered to the electrical grid. The generation component credited to the benefiting account may not include the surcharge, exit fee, or other cost recovery mechanism, as determined by the commission, to reimburse the Department of Water Resources for purchases of electricity, pursuant to Division 27 (commencing with Section 80000) of the Water Code. (3) If in any billing cycle, the charge pursuant to paragraph (1) for electricity usage exceeds the billing credit pursuant to paragraph (2), the City of Davis shall be charged for the difference. (4) If in any billing cycle, the billing credit pursuant to paragraph (2), exceeds the charge for electricity usage pursuant to paragraph (1), the difference shall be carried forward as a credit to the next billing cycle. (5) After the electricity usage charge pursuant to paragraph (1) and the credit pursuant to paragraph (2) are determined for the last billing cycle of a calendar year, any remaining credit resulting from the application of this section shall be reset to zero. (d) Not more frequently that once per year, and upon providing Pacific Gas and Electric Company with a minimum of 60 days notice, the City of Davis may elect to change a benefiting account. Any credit resulting from the application of this section earned prior to the change in a benefiting account that has not been used as of the date of the change in the benefit account, shall be applied, and may only be applied, to a benefiting account as changed. (e) Pacific Gas and Electric Company shall file an advice letter with the Public Utilities Commission, that complies with this section, not later than 10 days after the effective date of this section, proposing a rate tariff for a benefiting account. The commission, within 30 days of the date of filing, shall approve the proposed tariff, or specify conforming changes to be made by Pacific Gas and Electric Company to be filed in a new advice letter. (f) The City of Davis may terminate its election pursuant to subdivision (b), upon providing Pacific Gas and Electric Company with a minimum of 60 days notice. Should the City of Davis sell its interest in the PVUSA, or sell the electricity generated by the PVUSA, in a manner other than required by this section, upon the date of either event, and the earliest date if both events occur, no further bill credit pursuant to paragraph (2) of subdivision (b) may be earned. Only credit earned prior to that date shall be made to a benefiting account. (g) The Legislature finds and declares that credit for a benefiting account for the electricity output from the PVUSA are in the public interest in order to value the production of this unique, wholly renewable resource electricity generation facility located in, and owned in part by, the City of Davis. Because of the unique circumstances applicable only to the PVUSA a statute of general applicability cannot be enacted within the meaning of subdivision (b) of Section 16 of Article IV of the California Constitution. Therefore, this special statute is necessary. 2827. (a) The Legislature finds and declares that a program to provide net energy metering for eligible customer-generators is one way to encourage substantial private investment in renewable energy resources, stimulate in-state economic growth, reduce demand for electricity during peak consumption periods, help stabilize California's energy supply infrastructure, enhance the continued diversification of California's energy resource mix, and reduce interconnection and administrative costs for electricity suppliers. (b) As used in this section, the following definitions apply: (1) "Electric service provider" means an electrical corporation, as defined in Section 218, a local publicly owned electric utility, as defined in Section 9604, or an electrical cooperative, as defined in Section 2776, or any other entity that offers electrical service. This section shall not apply to a local publicly owned electric utility, as defined in Section 9604 of the Public Utilities Code, that serves more than 750,000 customers and that also conveys water to its customers. (2) "Eligible customer-generator" means a residential, small commercial customer as defined in subdivision (h) of Section 331, commercial, industrial, or agricultural customer of an electric service provider, who uses a solar or a wind turbine electrical generating facility, or a hybrid system of both, with a capacity of not more than one megawatt that is located on the customer's owned, leased, or rented premises, is interconnected and operates in parallel with the electric grid, and is intended primarily to offset part or all of the customer's own electrical requirements. (3) "Net energy metering" means measuring the difference between the electricity supplied through the electric grid and the electricity generated by an eligible customer-generator and fed back to the electric grid over a 12-month period as described in subdivision (h). Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the customer-generator, at the expense of the electric service provider, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the customer-generator pursuant to subdivision (h), or to collect solar or wind electric generating system performance information for research purposes. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator who already owns an existing solar or wind turbine electrical generating facility, or a hybrid system of both, is eligible to receive net energy metering service in accordance with this section. (4) "Wind energy co-metering" means any wind energy project greater than 50 kilowatts, but not exceeding one megawatt, where the difference between the electricity supplied through the electric grid and the electricity generated by an eligible customer-generator and fed back to the electric grid over a 12-month period is as described in subdivision (h). Wind energy co-metering shall be accomplished pursuant to Section 2827.8. (5) "Co-energy metering" means a program that is the same in all other respects as a net energy metering program, except that the local publicly owned electric utility, as defined in Section 9604, has elected to apply a generation-to-generation energy and time-of-use credit formula as provided in subdivision (i). (6) "Ratemaking authority" means, for an electrical corporation as defined in Section 218, or an electrical cooperative as defined in Section 2776, the commission, and for a local publicly owned electric utility as defined in Section 9604, the local elected body responsible for regulating the rates of the local publicly owned utility. (c) (1) Every electric service provider shall develop a standard contract or tariff providing for net energy metering, and shall make this contract available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 2.5 percent of the electric service provider's aggregate customer peak demand. (2) On an annual basis, beginning in 2003, every electric service provider shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the provider's service area. For those electric service providers who are operating pursuant to Section 394, they shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electric corporation, local publicly owned electric utility, or electrical cooperative, in which the customer has net energy metering. The ratemaking authority shall develop a process for making the information required by this paragraph available to energy service providers, and for using that information to determine when, pursuant to paragraph (3), a service provider is not obligated to provide net energy metering to additional customer-generators in its service area. (3) Notwithstanding paragraph (1), an electric service provider is not obligated to provide net energy metering to additional customer-generators in its service area when the combined total peak demand of all customer-generators served by all the electric service providers in that service area furnishing net energy metering to eligible customer-generators exceeds 2.5 percent of the aggregate customer peak demand of those electric service providers. (4) By January 1, 2010, the commission, in consultation with the State Energy Resources Conservation and Development Commission, shall submit a report to the Governor and the Legislature on the costs and benefits of net energy metering, wind energy co-metering, and co-energy metering to participating customers and nonparticipating customers and with options to replace the economic costs and benefits of net energy metering, wind energy co-metering, and co-energy metering with a mechanism that more equitably balances the interests of participating and nonparticipating customers, and that incorporates the findings of the report on economic and environmental costs and benefits of net metering required by subdivision (n). (d) Electric service providers shall make all necessary forms and contracts for net metering service available for download from the Internet. (e) (1) Every electric service provider shall ensure that requests for establishment of net energy metering are processed in a time period not exceeding that for similarly situated customers requesting new electric service, but not to exceed 30 working days from the date the electric service provider receives a completed application form for net metering service, including a signed interconnection agreement from an eligible customer-generator and the electric inspection clearance from the governmental authority having jurisdiction. If an electric service provider is unable to process the request within the allowable timeframe, the electric service provider shall notify both the customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date. (2) Electric service providers shall ensure that requests for an interconnection agreement from an eligible customer-generator are processed in a time period not to exceed 30 working days from the date the electric service provider receives a completed application form from the eligible customer-generator for an interconnection agreement. If an electric service provider is unable to process the request within the allowable timeframe, the electric service provider shall notify the customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date. (f) (1) If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 with an electric supplier that does not provide distribution service for the direct transactions, the service provider that provides distribution service for an eligible customer-generator is not obligated to provide net energy metering to the customer. (2) If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 with an electric supplier, and the customer is an eligible customer-generator, the service provider that provides distribution service for the direct transactions may recover from the customer's electric service provider the incremental costs of metering and billing service related to net energy metering in an amount set by the ratemaking authority. (g) Except for the time-variant kilowatthour pricing portion of any tariff adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 2851, each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use an eligible solar or wind electrical generating facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of an eligible solar or wind electrical generating facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generator's net kilowatthour consumption over a 12-month period, without regard to the customer-generator's choice of electric service provider. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generator's costs beyond those of other customers who are not customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate an eligible solar or wind electrical generating facility are contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs. (h) For eligible residential and small commercial customer-generators, the net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electric grid over a 12-month period. The following rules shall apply to the annualized net metering calculation: (1) The eligible residential or small commercial customer-generator shall, at the end of each 12-month period following the date of final interconnection of the eligible customer-generator's system with an electric service provider, and at each anniversary date thereafter, be billed for electricity used during that period. The electric service provider shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net producer of electricity during that period. (2) At the end of each 12-month period, where the electricity supplied during the period by the electric service provider exceeds the electricity generated by the eligible residential or small commercial customer-generator during that same period, the eligible residential or small commercial customer-generator is a net electricity consumer and the electric service provider shall be owed compensation for the eligible customer-generator's net kilowatthour consumption over that same period. The compensation owed for the eligible residential or small commercial customer-generator's consumption shall be calculated as follows: (A) For all eligible customer-generators taking service under tariffs employing "baseline" and "over baseline" rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to or be eligible for if the customer was not an eligible customer-generator. If those same customer-generators are net generators over a billing period, the net kilowatthours generated shall be valued at the same price per kilowatthour as the electric service provider would charge for the baseline quantity of electricity during that billing period, and if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric service provider would charge for electricity over the baseline quantity during that billing period. (B) For all eligible customer-generators taking service under tariffs employing "time of use" rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to or be eligible for if the customer was not an eligible customer-generator. When those same customer-generators are net generators during any discrete time of use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electric service provider would charge for retail kilowatthour sales during that same time of use period. If the eligible customer-generator's time of use electrical meter is unable to measure the flow of electricity in two directions, paragraph (3) of subdivision (b) shall apply. (C) For all residential and small commercial customer-generators and for each billing period, the net balance of moneys owed to the electric service provider for net consumption of electricity or credits owed to the customer-generator for net generation of electricity shall be carried forward as a monetary value until the end of each 12-month period. For all commercial, industrial, and agricultural customer-generators the net balance of moneys owed shall be paid in accordance with the electric service provider's normal billing cycle, except that if the commercial, industrial, or agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the customer-generator's account, until the end of the annual period when paragraph (3) shall apply. (3) At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric service provider during that same period, the eligible customer-generator is a net electricity producer and the electric service provider shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator shall not be owed any compensation for those excess kilowatthours unless the electric service provider enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. (4) The electric service provider shall provide every eligible residential or small commercial customer-generator with net electricity consumption information with each regular bill. That information shall include the current monetary balance owed the electric service provider for net electricity consumed since the last 12-month period ended. Notwithstanding this subdivision, an electric service provider shall permit that customer to pay monthly for net energy consumed. (5) If an eligible residential or small commercial customer-generator terminates the customer relationship with the electric service provider, the electric service provider shall reconcile the eligible customer-generator's consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill. (6) If an electric service provider providing net metering to a residential or small commercial customer-generator ceases providing that electrical service to that customer during any 12-month period, and the customer-generator enters into a new net metering contract or tariff with a new electric service provider, the 12-month period, with respect to that new electric service provider, shall commence on the date on which the new electric service provider first supplies electric service to the customer-generator. (i) Notwithstanding any other provisions of this section, the following provisions shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electrical service from a local publicly owned electric utility, as defined in Section 9604, that has elected to utilize a co-energy metering program unless the electric service provider chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h): (1) The eligible customer-generator shall be required to utilize a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide "time-of-use" measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of energy in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize any economic incentives provided by a government agency or the electric service provider to reduce its costs for purchasing and installing a time-of-use meter. (2) The consumption of electricity from the electric service provider shall result in a cost to the eligible customer-generator to be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use an eligible solar or wind electrical generating facility. The generation of electricity provided to the electric service provider shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use an eligible solar or wind electrical generating facility. (3) All costs and credits shall be shown on the eligible customer-generator's bill for each billing period. In any months in which the eligible customer-generator has been a net consumer of electricity calculated on the basis of value determined pursuant to paragraph (2), the customer-generator shall owe to the electric service provider the balance of electricity costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the electric service provider shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that an electric service provider may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the electric service provider may reduce any net credit due to the eligible customer-generator to zero. (j) A solar or wind turbine electrical generating system, or a hybrid system of both, used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. A customer-generator whose solar or wind turbine electrical generating system, or a hybrid system of both, meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance. (k) If the commission determines that there are cost or revenue obligations for an electric corporation, as defined in Section 218, that may not be recovered from customer-generators acting pursuant to this section, those obligations shall remain within the customer class from which any shortfall occurred and may not be shifted to any other customer class. Net-metering and co-metering customers shall not be exempt from the public benefits charge. In its report to the Legislature, the commission shall examine different methods to ensure that the public benefits charge remains a nonbypassable charge. (l) A net metering customer shall reimburse the Department of Water Resources for all charges that would otherwise be imposed on the customer by the commission to recover bond-related costs pursuant to an agreement between the commission and the Department of Water Resources pursuant to Section 80110 of the Water Code, as well as the costs of the department equal to the share of the department's estimated net unavoidable power purchase contract costs attributable to the customer. The commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net metering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002. (m) In implementing the requirements of subdivisions (k) and (l), a customer-generator shall not be required to replace its existing meter except as set forth in paragraph (3) of subdivision (b), nor shall the electric service provider require additional measurement of usage beyond that which is necessary for customers in the same rate class as the eligible customer-generator. (n) On or before January 1, 2005, the commission shall submit a report to the Governor and the Legislature that assesses the economic and environmental costs and benefits of net metering to customer-generators, ratepayers, and utilities, including any beneficial and adverse effects on public benefit programs and special purpose surcharges. The report shall be prepared by an independent party under contract with the commission. (o) It is the intent of the Legislature that the Treasurer incorporate net energy metering and co-energy metering projects undertaken pursuant to this section as sustainable building methods or distributive energy technologies for purposes of evaluating low-income housing projects. 2827.5. The Legislature finds and declares that the repeal of the provisions of the net metering program for large customers merely reflects a legislative desire to revisit and more closely evaluate the cumulative value and effect of the state's policy regarding renewable energy sources on the economics of investment in solar and wind sources for large net metering customers and to ensure further legislative discussion regarding this issue. 2827.7. Generation eligible for net energy metering that has all local and state permits required to commence construction on or before December 31, 2002, and has completed construction on or before September 30, 2003, shall be entitled, regardless of any change in customer or ownership of the energy system, for the life of the installation, to the net energy metering terms in effect on the date the local and state permits were acquired. 2827.8. Notwithstanding any other provisions of this article, the following provisions apply to an eligible customer-generator utilizing wind energy co-metering with a capacity of more than 50 kilowatts, but not exceeding one megawatt, unless approved by the electric service provider. (a) The eligible customer-generator shall be required to utilize a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide "time-of-use" measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of energy in both directions, the eligible customer-generator is responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize any economic incentives provided by a government agency or the electric service provider to reduce its costs for purchasing and installing a time-of-use meter. (b) The consumption of electricity from the electric service provider for wind energy co-metering by an eligible customer-generator shall be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use an eligible wind electrical generating facility. The generation of electricity provided to the electric service provider shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, excluding surcharges to cover the purchase of power by the Department of Water Resources, established under the applicable structure to which the customer would be assigned if the customer did not use an eligible wind electrical generating facility. 2827.9. (a) (1) The Legislature finds and declares that a pilot program to provide net energy metering for eligible biogas digester customer-generators would enhance the continued diversification of California's energy resource mix and would encourage the installation of livestock air emission controls that the State Air Resources Board believes may produce multiple environmental benefits. (2) The Legislature further finds and declares that the net energy metering pilot program authorized pursuant to this section for eligible biogas digester customer-generators, which nets out generation charges against generation charges on a time-of-use basis, furthers the intent of Chapter 7 of the Statutes of 2001, First Extraordinary Session, by facilitating the implementation of energy efficiency programs in order to reduce consumption of energy, reduce the costs associated with energy demand, and achieve a reduction in peak electricity demand. (b) As used in this section, the following definitions apply: (1) "Electrical corporation" means an electrical corporation, as defined in Section 218. (2) (A) "Eligible biogas digester customer-generator" means a customer of an electrical corporation that meets both of the following criteria: (i) Uses a biogas digester electrical generating facility with a capacity of not more than one megawatt that is located on or adjacent to the customer's owned, leased, or rented premises, is interconnected and operates in parallel with the electric grid, and is sized to offset part or all of the eligible biogas digester customer-generator's own electrical requirements. (ii) Is the recipient of local, state, or federal funds, or who self-finances pilot projects designed to encourage the development of eligible biogas digester electrical generating facilities. (B) Notwithstanding subparagraph (A), up to three large biogas digester electrical generating facilities with a generating capacity of more than one megawatt and not more than 10 megawatts, otherwise meeting the criteria of this section, shall be eligible for participation in the pilot program. (3) "Eligible biogas digester electrical generating facility" means a generating facility used to produce electricity by either a manure methane production project or as a byproduct of the anaerobic digestion of biosolids and animal waste. (4) "Net energy metering" means measuring the difference between the electricity supplied through the electric grid and the difference between the electricity generated by an eligible biogas digester customer-generator and fed back to the electric grid over a 12-month period as described in subdivision (e). Net energy metering shall be accomplished using a time-of-use meter capable of registering the flow of electricity in two directions. If the existing electrical meter of an eligible biogas digester customer-generator is not capable of measuring the flow of electricity in two directions, the eligible biogas digester customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a time-of-use meter. (c) Every electrical corporation shall file with the commission a standard tariff providing for net energy metering for eligible biogas digester customer-generators, consistent with this section. Every electrical corporation shall make this tariff available to eligible biogas digester customer-generators upon request, on a first-come-first-served basis, until the combined statewide cumulative rated generating capacity used by the eligible biogas digester customer-generators in the service territories of the three largest electrical corporations in the state reaches 50 megawatts. An eligible biogas digester customer-generator shall be eligible for the tariff for the life of the eligible biogas digester electrical generating facility. (d) Each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer was not an eligible biogas digester customer-generator, except as set forth in subdivision (e). Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or other charge that would increase an eligible biogas digester customer-generator's costs beyond those of other customers in the rate class to which the eligible biogas digester customer-generator would otherwise be assigned are contrary to the intent of this legislation, and shall not form a part of net energy metering tariffs. (e) The net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electric grid over a 12-month period. The following rules shall apply to the annualized metering calculation: (1) The eligible biogas digester customer-generator shall, at the end of each 12-month period following the date of final interconnection of the eligible biogas digester customer-generator's system with an electrical corporation, and at each anniversary date thereafter, be billed for electricity used during that period. The electrical corporation shall determine if the eligible biogas digester customer-generator was a net consumer or a net producer of electricity during that period. For purposes of determining if the biogas digester customer-generator was a net consumer or a net producer of electricity during that period, the electrical corporation shall aggregate the electrical load of a dairy operation under the same ownership, including, but not limited to, the electrical load attributable to milking operations, milk refrigeration, and water pumping located on property adjacent or contiguous to the dairy. Each aggregated account shall be billed and measured according to a time-of-use rate schedule. (2) At the end of each 12-month period, where the electricity supplied during the period by the electrical corporation exceeds the electricity generated by the eligible biogas digester customer-generator during that same period, the eligible biogas digester customer-generator is a net electricity consumer and the electrical corporation shall be owed compensation for the eligible biogas digester customer-generator's net kilowatthour consumption over that same period. The compensation owed for the eligible biogas digester customer-generator's consumption shall be calculated as follows: (A) The generation charges for any net monthly consumption of electricity shall be calculated according to the terms of the tariff to which the same customer would be assigned to or be eligible for if the customer was not an eligible biogas digester customer-generator. When those eligible biogas digester customer-generators are net generators during any discrete time-of-use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electrical corporation would charge for retail kilowatthour sales for generation, exclusive of any surcharges, during that same time-of-use period. If the eligible biogas digester customer-generator's time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (4) of subdivision (b) shall apply. All other charges, other than generation charges, shall be calculated in accordance with the eligible biogas digester customer-generator's applicable tariff and based on the total killowatthours delivered by the electrical corporation to the eligible biogas digester customer-generator. To the extent that charges for transmission and distribution services are recovered through demand charges in any particular month, no standby reservation charges shall apply in that monthly billing cycle. (B) The net balance of moneys owed shall be paid in accordance with the electrical corporation's normal billing cycle. (3) At the end of each 12-month period, where the electricity generated by the eligible biogas digester customer-generator during the 12-month period exceeds the electricity supplied by the electrical corporation during that same period, the eligible biogas digester customer-generator is a net electricity producer and the electrical corporation shall retain any excess kilowatthours generated during the prior 12-month period. The eligible biogas digester customer-generator shall not be owed any compensation for those excess kilowatthours. (4) If an eligible biogas digester customer-generator terminates service with the electrical corporation, the electrical corporation shall reconcile the eligible biogas digester customer-generator's consumption and production of electricity during any 12-month period. (f) No biogas digester electrical generating facility shall be eligible for participation in the tariff established pursuant to this section, that has not commenced operation by December 31, 2009. A biogas digester customer-generator shall be eligible for the tariff established pursuant to this section, only for the operating life of the eligible biogas digester electrical generating facility. (g) No biogas digester electrical generating facility that is subject to the best available control technology (BACT) requirements shall be eligible for participation in the tariff pursuant to this section unless the biogas digester electrical generating facility has installed the best available control technology as required by the regional air pollution control district at the time of installation to ensure the maximum feasible reductions in toxic and criteria pollutants. (h) On or before December 31, 2008, the commission, in collaboration with the State Air Resources Board, shall report to the Legislature all of the following information: (1) The impact of the pilot program on emissions of air pollutants. (2) The impact of the pilot program on the reliability of the transmission and distribution grid. (3) The impact of the pilot program on ratepayers. 2827.10. (a) As used in this section, the following terms have the following meanings: (1) "Electrical corporation" means an electrical corporation, as defined in Section 218. (2) "Eligible fuel cell electrical generating facility" means a facility that includes the following: (A) Integrated powerplant systems containing a stack, tubular array, or other functionally similar configuration used to electrochemically convert fuel to electric energy. (B) An inverter and fuel processing system where necessary. (C) Other plant equipment, including heat recovery equipment, necessary to support the plant's operation or its energy conversion. (3) "Eligible fuel cell customer-generator" means a customer of an electrical corporation that meets all the following criteria: (A) Uses a fuel cell electrical generating facility with a capacity of not more than one megawatt that is located on or adjacent to the customer's owned, leased, or rented premises, is interconnected and operates in parallel with the electric grid while the grid is operational or in a grid independent mode when the grid is nonoperational, and is sized to offset part or all of the eligible fuel cell customer-generator's own electrical requirements. (B) Is the recipient of local, state, or federal funds, or who self-finances projects designed to encourage the development of eligible fuel cell electrical generating facilities. (C) Uses technology that meets the definition of an "ultra-clean and low-emission distributed generation" in subdivision (a) of Section 353.2. (4) "Net energy metering" has the same meaning as that term is defined in Section 2827.9. (b) Every electrical corporation shall, not later than March 1, 2004, file with the commission a standard tariff providing for net energy metering for eligible fuel cell customer-generators, consistent with this section. Every electrical corporation shall make this tariff available to eligible fuel cell customer-generators upon request, on a first-come-first-served basis, until the total cumulative rated generating capacity used by the eligible fuel cell customer-generators equals 45 megawatts within the service territory of the electrical corporation for an electrical corporation with a peak demand above 10,000 megawatts, or equals 22.5 megawatts within the service territory of the electrical corporation for an electrical corporation with a peak demand of 10,000 megawatts or below. The combined statewide cumulative rated generating capacity used by the eligible fuel cell customer-generators in the service territories of all electrical corporations in the state may not exceed 112.5 megawatts. (c) In determining the eligibility for the cumulative rated generating capacity within an electrical service area, preference shall be given to facilities which, at the time of installation, are located in a community with significant exposure to air contaminants or localized air contaminants, or both, including, but not limited to, communities of minority populations or low-income populations, or both, based on the ambient air quality standards established pursuant to Section 39607 of the Health and Safety Code. (d) Each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the customer would be assigned if the customer was not an eligible fuel cell customer-generator. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or other charge that would increase an eligible fuel cell customer-generator's costs beyond those of other customers in the rate class to which the eligible fuel cell customer-generator would otherwise be assigned are contrary to the intent of the Legislature in enacting the act adding this section, and may not form a part of net energy metering tariffs. (e) The net metering calculation shall be carried out in accordance with Section 2827.9. (f) A fuel cell electrical generating facility shall not be eligible for participation in the tariff established pursuant to this section unless it commenced operation before January 1, 2010. A fuel cell customer-generator shall be eligible for the tariff established pursuant to this section only for the operating life of the eligible fuel cell electrical generating facility. 2828. (a) As used in this section, the following terms have the following meanings: (1) "Appropriate TOU tariff" means the Time-of-Use tariff that would be applicable to the City and County of San Francisco account at the photovoltaic electricity generation facility site if the facility at the site were a Pacific Gas and Electric Company bundled customer, as determined by Pacific Gas and Electric Company. (2) "Environmental attributes" associated with the Hetch Hetchy Water and Power (HHWP) at-site solar generation and HHWP remote solar generation include, but are not limited to, the credits, benefits, emissions reductions, environmental air quality credits, and emissions reduction credits, offsets, and allowances, however entitled, resulting from the avoidance of the emissions of any gas, chemical, or other substance attributable to the Hetch Hetchy Water and Power photovoltaic electricity generation facility owned by the City and County of San Francisco. (3) "HHWP at-site solar generation" means the electricity generated by Hetch Hetchy Water and Power photovoltaic electricity generation facilities owned by the City and County of San Francisco, designated by the City and County of San Francisco pursuant to subdivision (b). (4) "HHWP remote solar generation" means the electricity generated by Hetch Hetchy Water and Power photovoltaic electricity generation facilities owned by the City and County of San Francisco, designated by the City and County of San Francisco pursuant to subdivision (h), to provide electricity to qualifying remote load. (5) "Interconnection Agreement" means the 1987 agreement between Pacific Gas and Electric Company and the City and County of San Francisco, as filed with and accepted by the Federal Energy Regulatory Commission (FERC), and as amended from time to time with FERC approval, which provides for rates for transmission, distribution, and sales of supplemental electricity to the City and County of San Francisco. Nothing in this section shall waive or modify the rights of parties under the Interconnection Agreement or the jurisdiction of the FERC over rates set forth in the Interconnection Agreement. (6) "Qualifying remote load" means the electricity demand of the City and County of San Francisco for load served under the Interconnection Agreement, at sites that are separate from, and not adjacent to, the sites where the photovoltaic electricity generation facility is located, and serviced through a meter or multiple meters other than those serving the sites where the photovoltaic electricity generation facility is located. The separate or remote sites may be designated by the City and County of San Francisco, both inside and outside of the City and County of San Francisco. Where the separate or remote sites are outside of the City and County of San Francisco, they shall be located within 20 miles of the City and County of San Francisco or within 20 miles of a HHWP remote solar generation facility. There is no wattage limit on qualifying remote load. (b) The City and County of San Francisco may elect to designate specific photovoltaic electricity generation facilities as HHWP at-site solar generation, if all of the following conditions are met: (1) Total peak generating capacity does not exceed 15 megawatts. (2) The photovoltaic electricity generation facility utilizes a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide "time-of-use" measurement information. If the existing meter at the site of the facility is not capable of providing time-of-use information or is not capable of separately measuring total flow of energy in both directions, the City and County of San Francisco is responsible for all expenses involved in purchasing and installing a meter or meters that are both capable of providing time-of-use information and able to separately measure total electricity flow in both directions. (3) The amount of all electricity delivered to the electric grid by the designated HHWP at-site solar generation is the property of Pacific Gas and Electric Company. (4) The City and County of San Francisco does not sell electricity delivered to the electric grid from the designated HHWP at-site solar generation to a third party. (c) For each site of a photovoltaic electricity generation facility that comprises the HHWP at-site solar generation, Pacific Gas and Electric Company shall identify the appropriate TOU tariff for that site. Any electricity exported to the Pacific Gas and Electric Company grid at that site that is not generated from HHWP remote solar generation pursuant to subdivision (h) shall, for each time-of-use period, result in a monetary credit to be applied monthly as a credit or offset against the invoice created pursuant to the Interconnection Agreement and shall be valued at the generation component of the appropriate TOU tariff. The commission shall determine if it is appropriate to increase the credit to reflect any additional value derived from the location or the environmental attributes of, the designated HHWP at-site solar generation. (d) Monthly charges and credit amounts for HHWP at-site solar generation are interim and subject to an accounting true-up, consistent with commission policies and practices. The true-up shall be performed annually or upon the termination, for any reason, of the Interconnection Agreement. The true-up shall accomplish the following: (1) If the total electricity delivered to the site by Pacific Gas and Electric Company since the previous true-up equals or exceeds the total electricity exported to the grid by the HHWP at-site solar generation facility at the site, the City and County of San Francisco is a net electricity consumer at that site. For any HHWP at-site solar generation site where the City and County of San Francisco is a net electricity consumer, a credit or offset shall be applied to reduce the obligations of the City and County of San Francisco to an invoice prepared pursuant to the Interconnection Agreement. If there is no invoiced obligation to be reduced, there is no applicable credit. (2) If the total electricity delivered to the site by Pacific Gas and Electric Company since the previous true-up is less than the total electricity exported to the grid by the HHWP at-site solar generation facility at the site, the City and County of San Francisco is a net electricity producer at that site. For any HHWP at-site solar generation site where the City and County of San Francisco is a net electricity producer, the City and County of San Francisco shall receive no credit or offset for the electricity exported to the grid in excess of the electricity delivered to the site from the grid. For any site where the City and County of San Francisco is a net electricity producer, the City and County of San Francisco shall receive a credit or offset up to the amount of electricity delivered to the site from the grid. The credit or offset shall be applied to reduce the obligations of the City and County of San Francisco to an invoice prepared pursuant to the Interconnection Agreement. If there is no invoiced obligation to be reduced, there is no applicable credit or offset. Pacific Gas and Electric Company shall use the last-in, first-out method to determine what electricity delivered to the grid from the site will not earn a credit or offset. (e) Pursuant to this section, the offset to charges under the Interconnection Agreement is the medium to convey credits earned under this section. Nothing in this section shall be construed to affect in any way the rights and obligations of the City and County of San Francisco and Pacific Gas and Electric Company under the Interconnection Agreement. If the Interconnection Agreement terminates, the City and County of San Francisco and Pacific Gas and Electric Company shall develop an alternative mechanism to convey credits earned under this section, in a manner that accomplishes the same result as that accomplished pursuant to the Interconnection Agreement. (f) (1) Pacific Gas and Electric Company shall file an advice letter with the commission, that complies with this section, not later than 10 days after the City and County of San Francisco first designates the specific photovoltaic electricity generation facilities that will comprise HHWP at-site solar generation. (2) The commission, within 30 days of the date of filing of the advice letter, shall approve the advice letter or specify conforming changes to be made by Pacific Gas and Electric Company to be filed in an amended advice letter within 30 days. (g) The City and County of San Francisco may terminate its election pursuant to subdivisions (b), (c), (d), and (h), upon providing Pacific Gas and Electric Company with a minimum of 60 days' written notice. (h) (1) The City and County of San Francisco may elect to designate specific photovoltaic electricity generation facilities as HHWP remote solar generation and may use HHWP remote solar generation to supply electricity to specific facilities designated as qualifying remote load up to the amount of electricity being used by the qualifying remote load. (2) The City and County of San Francisco shall receive no credit or offset for the electricity exported to the grid from HHWP remote solar generation, in excess of the electricity delivered from the grid to qualifying remote load. (3) Pacific Gas and Electric Company shall accept any electricity exported to the grid by HHWP remote solar generation, up to the amount of electricity contemporaneously being used by the qualifying remote load, and treat the electricity accepted as behind the meter generation that offsets the electrical usage of qualifying remote load. Additional rates may apply pursuant to paragraph (6). (4) The City and County of San Francisco shall be responsible for scheduling the electricity exported to the grid from HHWP remote solar generation. (5) Both HHWP remote solar generation sites and qualifying remote load sites shall have meters capable of measuring exports and usage of electricity that will support determination of credits or offsets pursuant to paragraph (2). The City and County of San Francisco shall be responsible for the costs of the meters required pursuant to this section. (6) To compensate Pacific Gas and Electric Company for the use of its facilities, the City and County of San Francisco shall pay applicable distribution rates, transmission rates, or distribution and transmission rates, at rate levels determined by the Interconnection Agreement, for all energy delivered to qualifying remote load that comes from HHWP remote solar generation. When HHWP remote solar generation and the qualifying remote load it serves are located within the City and County of San Francisco and are interconnected at distribution voltage, the applicable rate for delivery of energy from HHWP remote solar generation shall be reduced as negotiated pursuant to the Interconnection Agreement. (7) The appropriate regulatory agency shall ensure that the delivery of electricity by HHWP remote solar generation to qualifying remote load, and the granting of offsets to the City and County of San Francisco pursuant to this subdivision, do not result in a shifting of costs to bundled service customers, either immediately or over time. (i) Hetch Hetchy Water and Power shall reimburse Pacific Gas and Electric Company for its reasonable study costs associated with HHWP remote solar generation to address interconnection, consistent with applicable regulatory rules, and impacts upon the electric system resulting from the HHWP remote solar generation. If the studies identify improvements necessary for the protection of the Pacific Gas and Electric Company electric system, for the protection of its employees, or to ensure reliable delivery of the electricity generated by the HHWP remote solar generation facility to qualifying remote load, Hetch Hetchy Water and Power shall pay the reasonable costs of the improvements if it elects to designate the HHWP remote solar generation facility to provide electricity for qualifying remote load. (j) Ownership and use of the environmental attributes associated with the electricity delivered to the electric grid by HHWP at-site solar generation and HHWP remote solar generation shall be determined by the commission in accordance with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1. 2829. (a) For purposes of this section, the following terms have the following meanings: (1) "EBMUD" means the East Bay Municipal Utility District organized and operating pursuant to Division 6 (commencing with Section 10001). (2) "Environmental attributes" associated with the generation of electricity include, the credits, benefits, emissions reductions, environmental air quality credits, and emissions reduction credits, offsets, and allowances, however entitled, resulting from the avoidance of the emissions of any gas, chemical, or other substance attributable to an electricity generation facility. (b) To ensure that no electrical corporation operates its monopoly transmission and distribution system in a manner that impedes the ability of the EBMUD to reduce its electricity costs through the delivery of electricity generated by EBMUD, an electrical corporation shall meet the requirements of this section. (c) Every electrical corporation that owns and operates transmission and distribution facilities that deliver electricity at one or more locations to the EBMUD's system shall, upon request by EBMUD, and without discrimination or delay, use the same facilities to deliver electricity generated by EBMUD. EBMUD may elect to designate specific hydroelectric generation facilities owned by EBMUD for the generation of electricity to be delivered to EBMUD, if the following conditions are met: (1) The amount of all electricity delivered to the electric grid by the designated EBMUD hydroelectric generation is the property of EBMUD. (2) Ownership and use of the environmental attributes associated with the electricity delivered to the electric grid by EBMUD designated hydroelectric generation is retained by EBMUD. (d) (1) No rule, order, or tariff of the commission implementing direct transactions is applicable to electricity generated by EBMUD, that is delivered to EBMUD for its own use that is transported over the transmission and distribution system of an electrical corporation, pursuant to an election made by EBMUD pursuant to subdivision (c). (2) Sections 365 and 366 are not applicable to electricity generated by EBMUD, that is delivered to EBMUD for its own use that is transported over the transmission and distribution system of an electrical corporation, pursuant to an election made by EBMUD pursuant to subdivision (c). (e) To compensate an electrical corporation for the use of its facilities, EBMUD shall pay applicable rates approved by the commission for distribution, or distribution and transmission, or any transmission rates as required under federal law. (f) On or before January 1, 2009, each electrical corporation that owns and operates transmission and distribution facilities that deliver electricity at one or more locations to the EBMUD system, shall file an advice letter with the commission that complies with this section. The commission, within 150 days of the date of filing of the advice letter, shall approve the advice letter or specify conforming changes to be made by the electrical corporation, to be filed in an amended advice letter within 60 days. (g) The commission shall ensure that the delivery of electricity from EBMUD designated hydroelectric generation to the EBMUD service territory pursuant to this section does not result in a shifting of costs to the bundled service customers of an electrical corporation, either immediately or over time.
Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.