Section 6-5-701 - Reliance upon specifications.


AL Code § 6-5-701 (2013) What's This?
Section 6-5-701Reliance upon specifications.

A contractor is justified ordinarily in relying upon the specifications that are contained in the contract with an awarding authority. No contractor shall be held civilly liable for work performed on a highway, road, bridge, or street including repairs, construction, or maintenance on behalf of the awarding authority unless it is shown by a preponderance of the evidence that physical injury, property damage, or death is proximately caused by any of the following:

(1) A failure by the contractor to follow the plans and specifications resulting in a dangerous condition.

(2) The contractor’s performance of the contract in compliance with the plans and specifications creates a condition that should have appeared, to a reasonably prudent contractor, to be a dangerous condition.

(3) A latent defect which creates a dangerous condition that is the result of the work of the contractor.

(Act 2012-225, p. 414, §2.)

Disclaimer: These codes may not be the most recent version. Alabama may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.