Ashland Inc. v. GAR Electroforming et al, No. 1:2008cv00227 - Document 128 (D.R.I. 2010)

Court Description: OPINION AND ORDER denying 67 Motion for Summary Judgment; denying 70 Motion for Summary Judgment; denying 74 Motion for Summary Judgment; denying 77 Motion for Summary Judgment. So Ordered by Chief Judge Mary M. Lisi on 7/22/2010. (Duhamel, John)

Download PDF
Ashland Inc. v. GAR Electroforming et al Doc. 128 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF RHODE ISLAND ASHLAND INC., Plaintiff, v. C.A. No. 08-227ML GAR ELECTROFORMING, THE BLACK AND DECKER CORPORATION, EMHART INDUSTRIES, MORTON INTERNATIONAL, INC., ROHM & HAAS COMPANY, ACCO-BRISTOL DIVISION OF BABCOCK INDUSTRIES, BRISTOL, INC., LIFE TECHNOLOGIES CORPORATION 1 , and UNITED TECHNOLOGIES CORPORATION, Defendants. OPINION AND ORDER Mary M. Lisi, Chief United States District Court Judge. I. Introduction It has been two decades since the United States first commenced an action under the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA"), 42 U.S.C. § 9601 et seq., to recover response costs associated with remediating a ten acre waste disposal site in Smithfield, Rhode Island, commonly 1 Formerly named defendant Applera Corporation is now known as Life Technologies Corporation ("LTC") and is the successor in interest or by merger to the whole or a part of Perkin-Elmer Corporation, the original defendant in the underlying litigation. See Order dated April 10, 2009, C.A. No. 08-227ML, Docket No. 117. 1 Dockets.Justia.com known as the "Davis Site." After several years of litigation to establish liability for the environmental contamination at the Davis Site, the case was resolved, in part by settlement memorialized in consent decrees, and in part by two separate trials against and among the responsible parties. Almost a decade ago, the First Circuit Court of Appeals affirmed the trial decision with respect to liability determinations judge's and the allocations of future response costs among various parties that were deemed to have contributed to the contamination at the Davis Site. One of these parties, Ashland Inc. ("Ashland"), now seeks recovery from several of the other parties for costs Ashland claims to have incurred "voluntarily" remediation at the Davis Site. in connection with groundwater All but one of the defendants 2 have filed motions for summary judgment regarding (1) the effect of a settlement agreement Technology Corp. between ( "UTC" ), the United States and United one of the parties deemed liable for cleaning up the Davis Site; and (2) the applicability of response cost allocations made in the litigation UTC brought against various For the reasons stated in this other parties for contribution. Memorandum and Order, the defendants' motions for summary judgment are DENIED. 2 Bristol Inc. and Acco-Bristol Division of Babcock Industries ("Bristol") submitted only a memorandum addressing the two issues. 2 II. Factual Background The substantive facts and procedural history of the Davis Site litigation have been set forth repeatedly and in great detail in the decision by the First Circuit Court of Appeals and several opinions by this Court, see e.g. United States v. Davis, 261 F.3d 1 (1st Cir. 2001); United States v. Davis, 11 F.Supp.2d 183 (D.R.I. 1998); United States v. United States v. Davis, Davis, 31 20 F.Supp.2d 326 F.Supp.2d 45 (D.R.I. (D.R.I. 1998). 1998); The following is a brief summary designed to put the current litigation into perspective. The Davis Site is a ten acre chemical waste disposal site located in Smithfield, Rhode Island, that was operated by the Davis family in the 1970s. During 1976 and most of 1977, William M. Davis and his wife Eleanor accepted for disposal more than eight hundred thousand gallons of hazardous waste materials from various generators. In 1982, the site was placed on the EPA's National Priorities List of hazardous waste sites. In 1987, the EPA issued a Record of Decision ("ROD") requiring the Government to perform the following clean-up measures to mitigate the damage caused to the environment by hazardous waste disposal: line to supply drinking water to contaminated or threatened water wells; (I) complete a water residential areas with (2) clean up contaminated groundwater; and (3) excavate and clean up contaminated soils that continued to contaminate the groundwater. 3 The Government began constructing residential water lines but took no other remedial actions. In 1990, the United States brought an action for recovery of past and future response costs at the Davis Site against (1) William Davis as owner-operator and Eleanor Davis as an owner under § 107 of CERCLA, 42 U.S.C. § 9607; (2) United Sanitation Inc. and A. Capuano Brothers Inc. as transporters and arrangers; and (3) Ciba-Geigy Corp., Clairol Inc., Pfizer Inc., The Providence Journal Company, and UTC as arrangers. Initially, the trial against these parties was trifurcated into three separate phases: Phase I to determine liability of the defendants; Phase II to establish the amount for response costs incurred by the United States; and Phase III to address all remaining claims including contribution, indemnification, and allocation. In 1991, UTC sued some of its co-defendants and 88 other companies under 42 U.S.C. § 9613(f), which permits a potentially responsible party ("PRP") in a CERCLA action to sue other PRPs for contribution. Those PRPs impleaded additional defendants, bringing a total of 138 defendants to the litigation. The United States did not bring suit against any of those additional parties directly. In 1994, Clairol, Ciba-Geigy, Pfizer, and the Providence Journal Company entered into a partial consent decree with the United States, pursuant to which they agreed to pay $5.625 million towards the cleanup of the Davis 4 Site. UTC, which did not participate in the consent decree, proceeded to trial instead, and was found jointly and severally liable for all past and future clean-up costs. Phase II of the trial became unnecessary when UTC, while reserving its right to appeal the liability determination, stipulated that the United States' response cost incurred by the EPA and enforcement costs incurred by the Department of Justice totaled $9.1 million (prior to certain cut-off dates determined by the Court). The $5.625 million plus interest previously paid by the settling defendants was to be deducted from that amount. In 1996, the Government asserted total response costs for site study and water line construction of $19 million and enforcement costs of $6 million. Future costs were estimated at $3 million to complete waterlines; $14 million for soil remediation; million for ground water remediation, million. and $13 for a total amount of $55 A number of defendants then joined one of five partial consent decrees, the most extensive of which was entered into by the Government, UTC, and 49 other defendants (1996 Partial Consent Decree, the "PCD"). Those 50 parties agreed to pay $13.5 million plus $440,000 in oversight costs. UTC's share of the costs was $2.8 million and UTC also agreed to perform the entire soil cleanup at the Davis Site, estimated at a cost of $14 million (reduced by $5.464 million paid through other consent decrees). UTC thus assumed the risk that the cost of remediation would exceed such an amount and it was agreed that UTC and the Government were each to 5 receive half of any future contribution recoveries. UTC's recovery, however, was to be capped at $5.364 million. Several defendants, Thiokol a/k/a Morton, participate contribution. in the including Acco Bristol, Black & Decker, consent decrees Ashland, and Perkin-Elmer, and UTC sued Gar, did not them for Because UTC had not yet begun the remediation, the trial on UTC's claims was focused on UTC's future costs of soil remediation. After a 26-day bench trial, the Court (Torres, J.) dismissed UTC's claims against some of the defendants, including a claim against the State of New Jersey on immunity grounds. On December 15, 1998, the Court issued a declaratory judgment, holding Ashland, Acco, Gar, Morton, and Perkin-Elmer liable for their part in contaminating the Davis site and allocated to them a share of responsibility for UTC's future clean-up costs. In determining the equitable allocation of CERCLA response costs among the liable parties, the Court considered ucritical" factors grouped into four categories: several (1) the extent to which cleanup costs are attributable for wastes for which a party is responsiblei (2) the party's level of culpabilitYi (3) the degree to which the party benefitted from disposal of the wastei and (4) the party's ability to pay its share of the cost. United States v. Davis, 31 F. Supp.2d at 63. With respect to waste attributable to each party, the Court acknowledged that the waste deposited at the Davis Site had been 6 "commingled into an essentially homogeneous 'witches' brew'" and that the "fairest, and most practical, measure of responsibility is the quantity or volume of hazardous waste attributable to each party." Id. at 64. To determine the individual level of culpability, the Court took into consideration each "party's responsibility for proper disposition of the waste, its awareness of the potential harm, the degree of care it exercised in order to avert the harm and its willingness to accept responsibility for remediating the harm." Id. at 65. The Court also decided that "all of the parties benefitted from disposition of the hazardous waste." Id. Regarding ability to pay, the Court noted that a defendant's share of liability was not simply based on a defendant's net worth. Instead, "the principal reason for considering ability to pay is to ensure that the party seeking contribution will not bear sole responsibility for any portion of the joint liability otherwise attributable to defendants from whom recovery is unlikely." 66. Because the evidence regarding the various Id. at defendants' financial condition was sparse, the Court concluded that "the most that can be inferred is that UTC and the generator defendants have a much greater ability to pay response costs than do the other defendants." Taking Id. those calculated the four factors allocation of into consideration, equitable 7 shares of the Court liability by basing it on the upercentage of the total volume of hazardous waste deposited produced. at the Id. fI Davis at 67. Site that [a] particular generator The liabilities were thus allocated as follows 3 : Generators Equitable Share of Liability ACCO-Bristol 0.16% Ashland 1. 03% Gar (Black & Decker) 0.03% Perkin-Elmer 0.57% UTC 1. 54% Transporters Chemical Waste Removal, Inc. 2.08% Chemical Control Corp. 18.3% A. Capuano Bros., Inc. 13.46% Operators/Owners William Davis 61. 87% Eleanor Davis 0.97% 100% TOTAL The Court included the following cautionary statement: [T] he Court retains jurisdiction for the purpose of revising this allocation if and when additional facts are discovered that were not reasonably available to the parties at the time of trial and that clearly demonstrate a change in circumstances so significant that the allocation would be rendered manifestly inequitable. In retaining jurisdiction for this purpose, the Court strongly discourages the parties from seeking to reopen U 3 No percentage of response costs was allocated to Morton because the volume of its deposited waste could not be calculated. 8 this matter without a compelling reason. A clear showing of a material change in circumstances rendering the allocation palpably inequitable will be required." Davis, 31 F.Supp. 2d at 69-70. Following this decision, Ashland appealed the Court's entry of partial consent decrees and Ashland, Acco-Bristol, Black & Decker a/k/a Gar, Morton, and Perkin-Elmer appealed various aspects of the declaratory judgment. Ashland was particularly concerned that non- settlors like Ashland itself would incur disproportionate liability related to performance of the groundwater remedy since Ashland was not protected under a consent decree and was barred from seeking contributions from parties that had settled earlier. Several of the defendants argued on appeal that UTC had failed to prove that their respective wastes evidentiary issues. defendants, UTC, including were hazardous or took issue with in turn, appealed dismissal of several New declaratory jUdgment action. Jersey, in connection with the UTC also took issue with being held solely responsible for $6 million in enforcement costs. with the exception of that last issue, which it remanded for clarification, the First Circuit affirmed all determinations and decisions by the district court. United States v. Davis, 261 F.3d 1 (1st Cir. 2001) . Regarding disproportionate Ashland's costs for concern the about groundwater having to bear remedy, the First Circuit acknowledged that CERCLA could impose harsh results on non- 9 settling PRPs. Id. at 28 bearing disproportionate remediation is encourages the ("The result of non-settlors possibly liability for the open-ended cost . consistent with [CERCLA's] finality of early settlement."). of paradigm, which The Court of Appeals also pointed out that "Ashland's preoccupation with the potential of disproportionate liability 'ignores that fact that UTC, which was allocated responsibility for 1.54 percent of the liabili ty by the trial court, will perform the source control remedy, which will amount to over one-fourth of the total costs of remediating the site.'" Id. at 27-28 (quoting from UTC's appellate brief) . III. Procedural History On June 6, 2008, Ashland filed a four-count complaint against the defendants 4 pursuant to Section 107 (a) Rhode Island state law: (Count I) against all defendants, pursuant to Section 107 of CERCLA, response costs, of CERCLA and under 42 U.S.C. contribution, § 9607(a), and equitable for recovery of indemnification in connection with groundwater modeling and remediation at the Davis (Count Site; II) against all defendants except UTC,5 for 4 The defendants in this action are limited to those generators who were found to have contributed to the contamination of the Davis Site but who did not participate in any of the consent decrees and who were previously sued by UTC for contribution. 5 Ashland apparently excluded UTC because UTC is protected against a contribution claim for the costs of groundwater cleanup by a second consent decree it entered with the State of Rhode 10 contributions under Rhode Island's Tortfeasor Act, RI. Gen. Laws § Uniform Contribution Among 10-6-1, et seq. for future costs of responding to the groundwater contamination at the Davis Site; (Count III) against all defendants, for equitable indemnification under state law on the ground that Ashland's incurred expenditures exceed its proportionate share of liability; and (Count IV) for a determination of liability for future costs. ~~ Complaint 48-54, 55-60, 61-64[ 65-68. Ashland represents that it has "voluntarily" incurred slightly less than $2 Million in response costs related to groundwater remediation at the Davis Site and that it will continue to incur such costs. Complaint cleanup the by ~ 2. settling According to Ashland, defendants has not the surface been completely effective, making the effective cleanup effort of the groundwater impossible. Id. ~~ 41,42. Ashland suggests that the November 1996 PCD requires the settling parties to perform soil cleanup at the Davis site, but that it specifically excludes groundwater cleanup referred to in the EPA's final Record of Decision ("ROD"), which sets forth the overall planned remedial action at the site. Id. ~ 38. ,Because Island in 2000 (the "AETC Decree"). According to UTC, it and "other parties agreed to reimburse the State of Rhode Island for past and future response costs, enforcement costs, oversight costs, and State natural resources damages associated with the Davis Site and agreed to perform certain additional remedial work and limited groundwater monitoring at the Davis Site." UTC Answer, CMECF Page 13 of 19. 11 the PCD excludes groundwater cleanup, Ashland proposes that UTC, as the only defendant in this case who signed the PCD, protected thereunder from Ashland's claim for recovery. Ashland acknowledges, from the ~AETC however, Decree", is Id. ~ not 39. that UTC derives some protection which is more comprehensive in its protection against state law claims related to cleanup of the Davis Site. Id. ~ 40. Ashland maintains that the cost it has incurred is related to ~the type of work specifically excluded from the scope of work defined in the PCD signed by UTC" and that Ashland has undertaken such work ~voluntarily,. even though [it] was not subject to any Government action directly." its expended response cost ~ 44. In addition to recovery of (less its own share of Ashland seeks to have the defendants declared as pursuant to Section 107 (a) of CERCLA and, liability), ~former as such, future response costs incurred by Ashland, plus arrangers" liable for ~interest of suit, including reasonable attorneys' fees." and costs Complaint at 14- 15. In response to Ashland's complaint, UTC asserts, inter alia, that Ashland's claims are barred by Section 113 of CERCLA. claims that approximately it $20 has incurred million in unreimbursed connection container removal and soil remediation at Answer Page 11 of 19. response UTe costs of drum and the Davis Site. UTC with tire, According to UTC, it submitted a Remedial 12 Action Report to the EPA in 2002, in which UTC reported that UTC and the performing parties spent approximately $23,950,500 to implement the remedial activities required by the PCD and the AETC Decree. UTC Answer Page 14 of 19. UTC notes that the EPA issued a certificate of completion in 2002 "notifying UTC that it had satisfied its obligations under the [PTC]." rd. UTC also raises counterclaims against Ashland for (1) past response costs incurred by UTC, pursuant to Sections 107 and 113; (2) in the event Ashland is found entitled to response cost recovery, equitable allocation of response costs as determined by Davis, 31 F. Supp.2d 45 (D.R.I. 1998); and (3) set-off, under the equi table doctrine of recoupment. Further, UTC asserts cross- claims against the other defendants for (1) their respective share of response costs incurred by UTC; and (2) in the event Ashland is found to be entitled to response cost recovery, the defendants' share of such response costs. On October 15, 2008, then Senior Judge Torres, who presided over the CERCLA action against UTC and also conducted the bench trial over UTC's contribution claims, held a Rule 16 conference with all the parties to this new action. Court issued an order pursuant to On October 30, 2008, the which the defendants were permitted to file summary judgment motions limited to addressing the following questions: (1) Whether the settlement agreement between the United States 13 and United Technologies Corp. ("UTC") in the related case of United States v. Davis, C.A. No. 90-484 bars an action against UTCi or (2) Whether the liability allocations for response costs made by this Court in United States v. Davis, 31 F.Supp. 45 (D.R.I. 1998) apply in this case. Order Limiting Motions for Summary Judgment, CV. No. 08-227ML (Doc. # 61) On November 24, 2008, the United States was granted permission to file an amicus curiae brief in the matter. Subsequently, the case was reassigned to this Court following Senior Judge Torres's retirement. On July 27, 2009, this Court granted RIDEM's motion to file an amicus curiae brief and permitted the parties to file responses to RIDEM's brief, which had already been submitted on November 21, 2008. Only Ashland has filed a memorandum in opposition to RIDEM's brief. IV. Standard of Review Summary judgment is governed by Rule 56 of the Federal Rules of Civil Procedure, which provides that "[t] he judgment sought should be rendered if the pleadings, the discovery and disclosure materials on file, and any affidavits show that there is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law." Fed. R. Civ. P. 56 (c) (2) . "A 'genuine' issue is one that could be resolved in favor of either party, and a 'material fact' is one that has the potential of 14 affecting the outcome of the case." Calero-Cerezo v. United States Dept. of Justice, 355 F.3d 6, 19 (1st Cir. 2004) (quoting Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248-50, 106 S.Ct. 2505, 91 L. Ed. 2d 202 (19 8 6) ) . In considering a motion for summary judgment, the Court reviews all evidence in the light most favorable to the nonmoving party and draws all reasonable inferences in favor of the nonmoving party. Cadle Co. Generally, v. Hayes, 116 F.3d 957, the movant must make a 959 (1st Cir. 1997). preliminary showing that no genuine issue of material fact remains that must be resolved at trial. After such a showing has been made, the burden shifts to the nonmovant to demonstrate, by presenting specific facts, that a trialworthy issue remains. Cadle Co. v. Hayes, 116 F.3d at 960. The nonmoving party "'may not rest upon mere allegation. . but must set forth specific facts showing that there is a genuine issue for trial.'" Braga v. Hodgson, 605 2010) (quoting Anderson v. Liberty Lobby, F. 3d Inc., 58, 60 (1st Cir. 477 U.S 242, 250, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986)). v. The Parties' Positions A review of the parties' briefs reveals that their arguments and contentions vary, based on their respective positions interests in this case. (A) UTC 15 and UTC seeks dismissal of Count I that the prior allocation in (Cost Recovery) on the grounds Davis, together with UTC's performance, as required by the approved Davis settlements, have resulted in significant overpaYment of UTC' s equitable share in the remediation. UTC argues that the prior liability allocations for response costs apply also in this case because they have been thoroughly tried and affirmed on appeal. UTC maintains that it has fully discharged its liability to the United States and the State of Rhode Island. UTe also points out that, according to UTC engineer Philip W. Sheridan, Ashland has made no paYment to UTC for the soil remediation work UTC performed at the Davis Site. 6 UTC also seeks dismissal of Count III (Equitable Indemnification under state law) on the ground that the claim is barred by the PCD and the AETC Decree. UTC suggests that Ashland IS equitable indemnification claim is actually a contribution claim and that, pursuant to claim against UTC should be dismissed. that the PCD provides contribution § disguised CERCLA 9613(f) (2), Ashland's Specifically, UTC maintains protection for all work specified in the ROD (which includes groundwater work) and that the AETC Decree provides contribution protection that expressly covers groundwater remediation. (B) Gar, Black & Decker, Emhart 6 UTC acknowledges that it has collected $3,950,000 in contributions from settling parties under various federal consent decrees. 16 The motion by these defendants (together, "Gar") is limited to the allocation issuei it does not address whether UTC is protected from this litigation by the PTC. Gar argues that the soil remediation response cost allocations in Davis apply to Ashland's current complaint on the basis of collateral estoppel or, in the alternative, that if collateral estoppel does not apply, this Court has the authority and sufficient available facts to apportion the parties' liabilities in order to reach the same result. Gar contends that (1 ) the Davis allocation for soil remediation applies equally to the groundwater remediation at issue nOWi and (2) the Court is required to address the allocation issue because of UTC's asserted counterclaim under Section 113. Specifically, Gar states that there is no distinction between the groundwater and the soil contaminationi that the volume of waste has previously been established and remains unchangedi and that there are no new factual circumstances that would warrant reopening the issue. Gar also points out that Ashland knew the estimated cost of the groundwater remedy prior to the entry of the consent decrees and was aware that several potentially responsible parties were already defunct or impecunious. Gar further suggests that this Court has the authority to apportion liability at the summary judgment stage because (1) there is no specific provision for joint and several liability among multiple defendants under CERCLAi and (2) the harm in this case is 17 divisible and the Court has previously determined that the most reasonable basis for allocating liability is volume of waste attributable to each defendant. (C) International/Rohm and Haas/Morton Unique among these defendants, specific percentage of equitable Morton was not allocated a share of liability based on insufficient evidence that it had disposed any specific volume of waste at the allocation is argues that entirely. Site. 7 Davis Because the issue of liability precluded by the determination in Davis, Ashland's claims against it should be Morton dismissed Morton also states that it will, along with the other defendants in this action, assert counterclaims for Section 113(f) contribution that will necessitate a determination of the liability allocation, and that Ashland is already bound by the allocations under Davis. Alternatively, Morton argues that Ashland's entire claim against Morton is precluded because both Ashland and Morton were parties in Davis, the case resulted in a final judgment, and 7 Morton, as successor to Thiokol Corporation Chemical Division ("Thiokol"), was found liable as an arranger. Because there was no evidence regarding the volume of Thiokol's waste transported to the Davis Site, Morton was not included in the cost share allocation. The First Circuit Court of Appeals noted that Morton's appeal of the liability determination stemmed from Morton's "concern that the Government will use the judgment of liability in this case to pursue a § 9607 action for the cost of the groundwater and well remediation that remains unallocated." Davis, 261 F.3d at 50 n. 45. 18 Ashland could have brought a Section 107(a) claim at the time of that litigation. 8 claims against underlying Finally, Morton argues that Ashland's state law Morton Ashland's should be claim for dismissed equitable because the issues indemnification are identical to the issues already litigated and there is no equitable reason to shift part of Ashland's liability to Morton. (D) LTC contends that its own liability allocation of .57% was fully litigated and that Ashland is now precluded from relitigating the issue, particularly because there has been no material change in factual circumstances which would warrant a modification. The estimated cost of the groundwater remediation was known at that time, as well as the inability of some of the responsible parties to pay part of the remediation costs. declaratory remediation, judgment issued LTC also states that the in Davis was not limited to soil but covered liability for past and future response costs at the Davis Site, which included groundwater remediation. LTC concedes that Ashland may bring a Section 107 claim under Atlantic Research, but predicts that the defendants will promptly file Section 113 counterclaims, leading to the equitable allocation analysis already performed in Section 107 claim, Davis. With respect to Ashland's although CERCLA allows for joint and several 8 This point appears to disregard the fact hat Ashland could not have brought a Section 107 claim prior to incurring costs. It is also outside the two questions Judge Torres posed for a possible motion for summary judgment. 19 liability, LTC points out that courts have recognized that joint and several liability is not appropriate when there is a reasonable basis to apportion liability. (E) Bristol As noted, in lieu of filing a motion for summary judgment, Bristol elected to submit a memorandum in response to the two questions set forth in the November 3, 2008 order. Bristol seeks (1) a finding by this Court that Ashland can maintain a Section 107 claim against UTC under Atlantic Research, and (2) deferment of a decision regarding the allocation "until the universe of defendants is better defined." Bristol Memorandum at 6. (1) Protection from Contribution Bristol agrees with Ashland that, Ashland may file a Section 107 under Atlantic Research, claim against UTC because contribution protection under Section 113 does not bar such a direct action. In fact, Bristol contends that Ashland is limited to bringing a Section 107 claim because it is barred from bringing a Section 113 claim as it has made no payments and cannot request contribution from another PRP. Bristol rejects the Government's argument advanced in its amicus brief that "Ashland's claim against UTe under Section 107 Government's amicus Government's contention is brief in at the 1. nature Bristol "deliberately blurs of contribution." suggests the that the distinction" between a cost recovery action and a contribution claim and that 20 the Government's brief is a "stealth petition for a rehearing of the Atlantic Research decision." Bristol Memorandum at 5, 6. (2) Allocation Issue Bristol premature further until the suggests Court that has the allocation determined the issue pool of is PRPs. According to Bristol, Ashland anticipates adding as many as SO new defendants which might affect any allocation decision reached by the Court. Therefore, the Court should defer a decision regarding the allocation of liability ~until the universe of defendants is better defined." Bristol Mem. at 6. (F) The United States Government's amicus curiae Brief The Government asserts that (1) Ashland's Section 107 claim is "in the nature of [a] contribution" claim and therefore barred by Section 113 (f) (2); and (2) if the Court finds a "gap" in the protection of Section 113 (f) (2), it should apply federal common law to protect settling parties such as UTC. Although it is not expressly stated in Ashland's complaint, Ashland apparently seeks to establish joint and several liability against the defendants. The Government contends that joint and several liability, however, applies only to actions brought by the Government or innocent parties, whereas PRPs are limited to equitable allocation in the nature of contribution. The Government also suggests that Ashland's involvement in the remediation cannot be considered "voluntary." 21 Instead, the EPA approached (liable, non-settlor) Ashland groundwater work at the Davis Site. in 2000 to commence Ashland was required to submit work plans, other submittals and a final report for finished work to the EPA for approval. Generally, the EPA has approved Ashland I s work and Ashland has reimbursed the EPA for response costs the EPA has incurred in overseeing the work. In the event the Court determines that Ashland's claim is not a contribution claim, the Government suggests that the Court rely on federal common law and find that UTC is protected against a Section 107 claim as a party who settled with the EPA. Generally, common law disfavors claims by a PRP against a settling party, and governmental settlements can bar subsequent private claims based on the common-law rule that the sovereign is in privity with individual citizens invoking similar remedies and can extinguish private claims. With respect to the allocation issue, the Government states that it did not participate in the proceedings and is in no position to opine on the matter. (G) RIDEM's amicus curiae Brief RIDEM was a party to a separate case related to the Davis landfill, RIDEM v. Advanced Environmental Technologies. et al 9, 9 Ashland was an Intervenor Defendant in the AET case. Ashland initially opposed entry of the partial consent decree and filed two separate appeals related thereto. However, after the First Circuit Court of Appeals concluded that it lacked appellate jurisdiction, 22 C.A. No. 97-0138T ("AET"), which involved both CERCLA and state law claims. Pursuant to the AETC Decree entered in that case, UTC and other defendants response costs reimbursed RIDEM for more than $2 million in RIDEM incurred in connection with protecting groundwater "beyond the work prescribed in the parallel consent decree" in the instant case. RIDEM asserts that the AETC Decree constitutes a settlement under CERCLA as well as under the Rhode Island Industrial Property Remediation and Reuse Act R.I. Gen. Laws (" IPRRA") , 23-19-14, et seq., which is implemented by RIDEM. § RIDEM states that it filed an amicus curiae brief "in order to set forth settlement its is interpretation of a part," and to be [IPRRA] under assured of which the the AETC finality of settlements it has reached under state law at the Davis Site and other hazardous waste sites in Rhode Island. RIDEM Mot. 2. The AETC Decree specifically provides that the settling defendants are protected from contribution action for "Protected Matters," which included both "soil remediation" and "groundwater treatment work" at the Davis Site. 10 Accordingly, RIDEM argues that UTC may not be held liable for claims for contribution regarding matters addressed Ashland dropped its later appeal. This Court (Torres, J.) entered a consent decree between the participating parties on June 28, 2004. 10 However, such contribution protection is apparently limited to "claims by any other person (except the United States)." [Although RIDEM refers to the AETC Decree as "attached," it has not been provided to the Court.] 23 in the AETC Decree because, under IPRRA,ll UTC's participation in the AETC Decree protects it from Ashland's equitable indemnity claim. (H) Ashland's Opposition In response to the parties' motions for summary judgment, Ashland filed separate memoranda addressing arguments asserted by (1) UTC; (2) Gar, Black& Decker, Emhart and Life Technologies Corporation; and (3) Rohm/Haas and Morton. Ashland also responded to the amicus curiae briefs by the Government and RIDEM. UTC, in turn, filed a response to Bristol's memorandum. In general, Ashland relies on the 2007 Supreme Court decision in United States v. Atlantic Research Corp., S.Ct. 2331, 168 L.Ed. 2d 28 (2007), for 551 U.S. its 128, assertion 127 that, although it may be precluded from filing a Section 113 contribution claim, Ashland can pursue a direct Section 107 recovery claim for joint and several liability. With respect to UTC, Ashland suggests that the PCD and AETC Decree only bar contributions claims, not recovery claims related to the work performed by Ashland. respect to the other defendants, Ashland asserts that the 11 IPRRA, R.I. Gen. Laws § With Davis 23-19.14-12, provides: A party who is exempt from liability under §§ 23-19.14-7, 23-19.14-8 or 23-19.14-10 of this chapter shall not be liable for claims for contribution regarding matters addressed in the letter of compliance or the settlement agreement or the remedied agreement. 24 allocations only apply to parties subject to a Section 113 claim (in this case, Ashland) and any other party joining Ashland in the current cleanup and this litigation. Ashland also suggests that liability for a Section 107 claim is joint and several unless the harm is divisible and points to prior findings made during the Davis litigation that the hazardous waste was "commingled." Regarding Morton's position that its allocated share of liability was "zero percent," Ashland points out that Morton was deemed to be an "arranger," which establishes Morton's liability in connection with Ashland's current complaint. Ashland also states that UTC's soil remediation work may have uncovered additional information that supports equitable apportionment of liability to Morton. Regarding the allocations of remediation cost assessed in Davis, Ashland points out that those allocations were made in the context of UTC's contribution under Section 113 appropriate for a recovery claim based on Section 107. and are not In essence, Ashland seeks to recover from the defendants on a j oint and several liability basis. VI. Discussion A. Ability of Ashland to bring a Section 107(a) claim CERCLA was enacted in 1980 to respond to the "serious environmental and health risks posed by industrial pollution." United States v. Bestfoods, 524 U.S. 51, 55, 118 S.Ct. 1876, 141 25 L.Ed.2d 43 (1998). In addition to "grant [ing] the President broad power to command government agencies and private parties to clean up hazardous "everyone who waste sites," is potentially contamination may be cleanup." Id. at 56 forced id. at 55, CERCLA responsible to contribute for to provides that hazardous-waste the cost of the n. 1. Originally, CERCLA "contained no express provision authorizing a private party that had incurred cleanup costs to seek contribution from other PRP's." Key Tronic Corp. v. United States, 511 U.S. 809, 816, 114 S.Ct. 1960, 1965, 128 L.Ed.2d 797 (1994); United States v. Cannons Eng'g Corp., 899 F.2d 79, 92 (1st Cir. 1990) (CERCLA, as originally enacted, "did not expressly provide for a right of contribution among parties found jointly and severally liable for response costs"). In enacting the Superfund Amendments and 1986 Reauthorization Act of ("SARA"), Congress expressly authorized parties who have been held liable for the cleanup of contaminated properties to seek contribution from other responsible parties. seek Id. Pursuant to Section 113(f) (I), contribution from any other person " [a]ny person may who is liable or potentially liable under section 9607(a) of this title, during or following any civil action under section 9606 12 of this title." U.S.C. § 42 9613 (f) (1) (1987) . 12 Section 106 of CERCLA, 42 U. S. C. § 9606, authorizes the Federal Government to compel responsible parties under CERCLA to perform remediation of contaminated areas. 26 Likewise r in order to encourage settlements and "provide PRPS a measure of finality in return for their willingness to settler" responsible parties who have settled their specifically protected from contribution actions. Cannons Enqrq Corp'r 899 F.2d at 92 liability are United States v. ("Congress specifically provided that contribution actions could not be maintained against settlors"). Section 113(f) (2) states as follows: A person who has resolved its liability to the United States or a State in an administrative or judicially approved settlement shall not be liable for claims for contribution regarding matters addressed in the settlement. Such settlement does not discharge any of the other potentially liable persons unless its terms so provider but it reduces the potential liability of the others by the amount of the settlement. 42 U.S.C. § 113 (f) (2) Settlors are thus protected against contribution "regarding matters addressed in the settlement r rr 113(f) (3) (B) provides them with the express while Section right contribution from any person who is not party to a referred to in paragraph (2)." 42 U.S.C. § actions to "seek settlement 9613(f) (3) (B). In addition r Section 107 has been interpreted "to impliedly authorize . a cause of action for private parties to seek recovery of cleanup costs." U.S. at 816 r 818 r 114 Key Tronic Corp. v. United States r 511 S.Ct. at 1965 r 1966. (CERCLA statute "expressly identifies the Government as a potential plaintiff and only impliedly plaintiffs) . identifies Pursuant to private parties// Section 107(a)r 27 as potential parties deemed responsible under CERCLA "are liable for . . . any other necessary costs of response incurred by any other person consistent with the national contingency plan." words, CERCLA contribution in "expressly § 113 42 U.S.C. authorizes and 9607(a) (4) (B). § a cause of impliedly authorizes somewhat overlapping remedy in § 107." In other action a for similar and Key Tronic at 816, 114 S.Ct. at 1966. The circumstances under which a party may pursue a contribution claim under Section 113(f) (1) were further defined by the Supreme Court in Cooper Indus.,Inc. v. Aviall Serv., Inc., 543 U.S. 157, 125 S.Ct. 577, 160 L.Ed.2d 548 plaintiff, Aviall Services, Inc. (2004). ("Aviall"), In Aviall, the sought contribution for cleaning up contaminated properties it had purchased from the defendant, Cooper Industries, Inc. ("Cooper"). Although Aviall notified the State when it discovered the contamination, neither the State nor the Federal Government had administrative measures to compel cleanup." at 582. taken "judicial or Id. at 164, 125 S.Ct. Aviall initially asserted a claim for cost recovery under Section 107(a) and a separate claim for contribution under Section 113(f) (1), then amended its complaint by combining the two claims into a single, 113(f) (1). joint claim, seeking contribution under Section The district court granted Cooper's motion for summary judgment after determining that contribution was unavailable to Aviall because it had not been subject to enforcement action under 28 Sections 106 and 107. The Fifth Circuit reversed, holding that a PRP could seek contribution even if he had not been sued under those Sections. The Supreme Court granted certiorari. Aviall's appeal was based on the suggestion that a Section 113(f) (1) claim for contribution was permissible, regardless of whether such an action occurred "during or following any civil action" under Sections 106 or 107. The Supreme Court disagreed, concluding that Aviall could not file a Section 113(f) (1) claim for contribution because Aviall had never been subj ect to a action or administrative order under either section. 125 S. Ct. at 584. civil rd. at 168, The Court also rej ected Aviall' s effort to revive its Section 107(a) claim, noting that the issue had not been addressed by the district court or the Fifth Circuit Court of Appeals. rd. at 169, 125 S.Ct. at 585. Therefore, the Court declined to address the question of whether a private party that is itself a PRP is precluded from pursuing a Section 107(2) action against other PRPs for joint and several liability. rd. The question was revisited and definitively resolved in United States v. Atlantic Research Corp., 551 U.S. 128, 127 S.Ct. 2331, 168 L.Ed. 2d 28 (2007), on which Ashland primarily relies. holding in Atlantic Research, with a that Section 107(a) The provides PRPs cause of action to recover necessary costs incurred in cleaning up a contaminated site, made clear that Section 107(a) is 29 no longer reserved for "innocent" parties. See W.R. Grace & Co. - Conn., v. Zotos Intern'l, Inc., 559 F.3d 85, 89 (2d Cir. 2009). The plaintiff in Atlantic Research, Atlantic Research Corporation ("ARC"), leased property at a facility operated by the Department of Defense. 2335. Atlantic Research at 133, 127 S.Ct. at At the site, ARC retrofitted rocket motors for the united States and, as a result of such activities, contaminated by wastewater and burned fuel. the site was ARC cleaned up the site at its own expense and then filed an action against the United States under Sections 107(a) costs. Id. and 113(f) to recover some of its Following the Supreme Court's decision in Aviall, ARC amended its complaint and relied solely on Section 107 (a) federal common law. and The United States filed a motion to dismiss on the ground that PRPs were precluded from seeking cost recovery under Section 107(a). The district court granted the Government's motion and the Eighth Circuit Court of Appeals reversed. Id. at 134, 127 S.Ct. at 2335. The Supreme Court affirmed, holding that Section 107(a) (4) (B) provides "any other person," including PRPs, with a cause of action to recover costs from other PRPs for cleaning up a contaminated site. Id. at 135, 127 S. Ct. at 2336. The Court specifically rejected the Government's position that Section 107(a) (4) (B) only applied to "innocent" private parties, e.g. "landowners whose land has been contaminated by another." 30 The Court noted that, because the broad definition of PRPs "sweep[s] persons likely to incur cleanup costs," in virtually all regardless of their innocence, the Government's interpretation "would reduce the number of potential plaintiffs to almost zero, rendering dead letter." rd. at 136, 127 S.Ct. at 2336. 107(a) (4) (B) a § The Court also recognized that Sections 107(a) and 113(f) provide two "'clearly distinct'" remedies. recovery in Section 107(a) "provides for aright to cost certain circumstances," whereas Section 113(f) "provides separate rights to contribution in other circumstances." rd. at 138, 127 S.Ct. at 2337~38 n.3, With respect to Section 107(a) 125 S.Ct. 577). (quoting Aviall, 543 U.S., at 163, recovery claims, a private party may recover "without any establishment of liability to a third party," but only to the extent the private party has "incurred" costs in cleaning up the site. rd. The Court recognized that Section 107(a) and 113(f) provided "somewhat overlapping remedies," and that, for instance, "a PRP may sustain expenses pursuant to a consent decree following a suit under § 106 or § 107," but it declined to decide "whether these compelled costs of response are recoverable under 107(a), or both." deciding that § § 113 (f), § rd. at 139, n. 6. The Court "assume[d] without 107 imposes joint and several liability. II rd. at 2339, n. 7. The Court also concluded that the settlement bar set forth in Section 113(f) only provides protection 31 against contribution claims, not against direct claims for cost recovery. 127 S.Ct. 2339. Section 113 (f) (2) "prohibits § Id. at 140, 113 (f) contribution claims against \ [a] person who has resolved its liability to the United States or a State in an approved settlement . . . . ' 42 U.S.C. administrative § 9613(f) (2). or jUdicially The settlement bar does not by its terms protect against cost-recovery liability under § 107(a)." Id. The Court recognized that allowing an action under Section 107(a) against a PRP who has settled its liability to the Government might be perceived as weakening the protection against contribution claims provided by Section 113(f) (2). 140, 127 S.Ct. at 2339. Id. The Court pointed out, however, that a PRP could file a Section 113(f) counterclaim (which would necessitate equitable apportionment including the plaintiff) barred. of costs among all liable parties, and that contribution claims were still Id. B. This Case In the course of the Davis litigation, the United States did not bring civil or administrative claims against Ashland directly. Nor did Ashland participate in any settlement agreements or consent decrees resulting from the Davis case. Instead, Ashland was deemed responsible for a portion of the contamination at the Davis Site in the context of a suit for contribution brought by UTC, although it appears that Ashland has yet to make any payment to UTC. Ashland is ineligible to bring 32 its own suit for As such, contribution pursuant to Section 113(f) because it is undisputed that Ashland has not been the subject of proceedings pursuant to Section 106 or 107. See Cooper Indus., Inc. v. Aviall Servs., Inc. / 543 U. S. 157/ 125 S.Ct. 577/ 160 L.Ed.2d 548 (2004) (CERCLA action against private party is a requirement for contribution suit under Section 113) . Ashland now claims/ with some factual support/ that it has incurred response costs related to the groundwater cleanup. Specifically/ Ashland asserts that it "voluntarily has incurred slightly less than Two Million Dollars ($2/000,000.00) in response costs related to ongoing modeling and remediation efforts for the groundwater contamination at the Davis Site. // Complaint ~ 43. According to the Declaration of Neil Handler/ an EPA employee and Remedial Project Manager at the Davis Site from 1989 to 2004/ "on or about July 19/ 2000, the EPA sent a letter and accompanying Administrative Order by Consent for Pre-Remedial Design for the groundwater remedial action at the Site.// Handler Declaration ~ 5 (submitted by the United States as Exhibit 1 to its amicus curiae brief) . After some discussion/ "Ashland sent EPA a letter confirming their agreement to be a Performing Party at the site to finance/ develop/ and submit to EPA a Pre-Design Work Plan for the Site.// Id. at ~ 6. Since then/ Ashland has performed certain work and submitted each phase of work for the EPA/s approval. Ashland has also reimbursed the EPA for overseeing Ashland/s work. 33 Id. at Nothing in the plain language of Section 107(a) requires that ~voluntary" the cleanup performed by the PRP must be to allow the PRP to bring a claim for cost recovery. As held by the Supreme Court 107(a) (4) (B) in Atlantic ~authorizes PRPs." Courts Research, Section expressly cost-recovery actions by any private party, including Atlantic Research, have generally 551 U. S. at 136, described the 127 S. Ct. at 2336. cleanup for typically seek cost recovery under Section 107(a) as which PRPs ~voluntary," see e.g. E.I. DuPont de Nemours and Co., v. United States, 508 F.3d 126, 135 (3d Cir. 2007) cleanup costs to (~Permitting bring suit parties who voluntarily incur under § 107 comports with the fundamental purposes of CERCLA."); Kotrous v. Goss-Jewett Co. of Northern California, 523 F.3d 924, 930 (9th Cir. 2008) (following CERCLA enactment, ~\litigation arose over whether party that had incurred response costs, but . a private that had done so voluntarily and was not itself sUbject to suit, had a cause of action under However, for cost recovery against other PRPs' § 107"). it appears that such characterization merely serves to distinguish those efforts from cleanups mandated by civil actions or administrative remedies brought under Sections 106 or 107. See Kotrous v. Goss-Jewett Co. of Northern California, 523 F.3d at 933 (~Under Atlantic Research, a PRP that incurs voluntarily, without having been subject to an action under or § costs § 106 107, may bring a suit for recovery for its costs under 34 § 107 11 ) . Moreover, the Supreme Court, in Atlantic Research, made clear that any private party, including PRPs who mayor may not be considered "innocent," "expenses associated may pursue with a cost cleaning up recovery action contaminated for sites." Atlantic Research, 551 U.S. at 131, 127 S.Ct. at 2333. In other words, neither the plain language of Section 107 (a) (4) (B), nor the holding of Atlantic Research require that the cleanup was "voluntary" in the sense that it was performed by an innocent party. Atlantic Research noted that a PRP who sustains "expenses pursuant to a consent decree following a suit under or § 107 . Court 106 does,not incur costs voluntarily," but declined to decide whether such "compelled" costs were recoverable. the § determined recoverable only by that way "costs of § incurred Instead, voluntarily 107(a) (4) (B), and costs are of reimbursement to another person pursuant to a legal judgment or settlement are recoverable only under at 2338 n. 6. § 113(f)." Atlantic Research Clearly, the focus of the Supreme Court's analysis was on the type of recovery sought, not on the voluntariness of the cleanup or the "innocence" of the party bringing the action. In other words, "[i]f a party incurs direct costs that it is seeking to recover, it may bring a claim under § 107. If a party incurs indirect costs that it is suing to recover-that is, costs incurred in the context of reimbursing a party who itself directly paid response costs, then it has to bring a contribution action under 35 § 113." Ford Motor Co. v. Michigan Consolo Gas Co., 2009 WL 3190418 *7 (E.D. Mich. Sept. 29, 2009). As established in Aviall, only a PRP subject to enforcement actions under Sections 106 or 107 may bring a suit for contribution under Section 113 (f). Since the Government did not sue Ashland (or any of the other defendants in this case) directly, Ashland faced no liability under Sections 106 or 107 and is, therefore, precluded from bringing a contribution claim under Section 113 (f). If, however, Ashland itself has "incurred" cleanup costs, as opposed to reimbursing costs paid by other parties, it may bring a cost recovery action under Section 107{a). The fact that Ashland may have been prompted by the EPA to commence cleanup work at the Davis Site does not change the analysis. Although the Government asserts that the EPA sent an "Administrative Order by Consent" to Ashland, there is nothing in the record to indicate that the EPA brought civil or administrative enforcement proceedings directly against Ashland. The Second Circuit Court of Appeals, when addressing the question of whether a PRP "who has remediated a contaminated site pursuant to an administrative consent order has a cause of action to pursue necessary associated costs under section 107," concluded that the PRP has such a right. W.R. Grace & Co. - Conn.! v. Zotos Intern'1, Inc., 559 F. 3d 85, 89 (2d Cir. 2009). Grace noted that "[u]nder the 36 plain The Court in W. R. language of [Section 107{a) (4) (B)], the fact that a party enters into a consent order before beginning remediation is of no legal significance with respect to whether or not the party has incurred response costs as W.R. Grace & Co. - Conn., v. Zotos required under section 107(a)." Intern' I, Inc., 559 F.3d at 92. Following the reasoning and statutory interpretation in Atlantic Research, the Court concluded that \\ [i] n solely to the same manner that section 107(a) 'innocent' parties, see id., is not limited section 107(a) does not specify that only parties who 'voluntarily' remediate a site have a cause of action." Id. (citing Atlantic Research at 2339). In the case now before this Court, Ashland seeks to recover costs for remedial work related to groundwater contamination at the Davis Site. Although Ashland's work was performed at the request of the EPA, Ashland was not compelled to perform the cleanup as a result of a direct civil or administrative action under Sections 106 or 107. Nor is Ashland attempting to obtain contribution from other parties for payments it has made under a settlement agreement or a court order. 13 Based on the plain language of Section 107(a) (4) (B) and the Supreme Court's holding in Atlantic Research, this Court concludes that Ashland may bring against the defendants a Section 107 (a) to seek recovery of necessary costs it incurred in performing remedial work at the Davis Site. 13 As noted before, Ashland has yet to pay any reimbursement to UTC for costs UTC has incurred in performing the considerable remedial work it completed pursuant to the PCD and the AETC Decree. 37 The PCD and the AETC decree do not change this conclusion. Section 113(f) (3) provides that "[a] person who has resolved its liability to the United States or a State in an administrative or judicially approved settlement shall not be liable for claims for contribution regarding matters addressed in the settlement." U.S.C. § 113(f) (2) (Emphasis added). 42 Paragraph 95 of the PCD grants to UTC (and other settlors) "protection from contribution action or claims as provided by CERCLA section addressed in this Consent Decree." 113 (f) (2), for UTC' s Memorandum 7 - 8 . matters The AETC Decree provides that UTC is "entitled . to protection from contribution by action 113(f)(2), 42 U.S.C. Paragraph, the term or § claims as provided For purposes 9613(f)(2). "Covered Matters" CERCLA is to be Section of this construed to provided contribution protection against claims by the State or any other person (except the United States)". UTC's Memorandum 10. Neither decree addresses the possibility of direct recovery claims pursuant to Section 107 against UTC or any of the other settlors. Therefore, the settlement agreements UTC has entered with the United States and the State of Rhode Island do not serve to bar Ashland's Section 107(a) recovery claim against UTC. C. Applicability of the Davis Liability Allocations Having determined that Ashland can bring a cost recovery claim pursuant to Section 107 (a), the remaining question before this Court is whether the equitable share allocations made in Davis 38 apply in this case. The common thread of the parties' arguments14 is the general assertion that a reallocation of equitable liability shares is precluded on collateral estoppel grounds, i.e., the issue of allocation has already been addressed in Davis. Memorandum at 11 ("Ashland is is precluded from allocation and bound by See e.g., UTC's this relitigating Court's that prior percentage allocation"); Gar's Memorandum at 4 ("Issue preclusion bars Ashland from relitigating Memorandum at 6 the allocation ("Morton's of Morton's liability") ; CERCLA allocation has already been finally determined and is therefore barred from litigation by issue preclusion"); Life Technologies Corporation's Memorandum at 3 ("The doctrine of issue preclusion precludes Ashland from re-litigating the percentage allocation assigned to Applera in Davis") . "When a party implores a federal court to give preclusive effect to a prior federal court adjudication, federal law governs." Faigin v. Kelly, 184 F.3d 67, 78 (1st Cir. 1999). Issue preclusion "prohibits a party from re-litigating issues that have previously been adjudicated." Enica v. Principi, 544 F.3d 328, 336 (1st Cir. 2008) . The requirements for collateral estoppel preclusion are well established under federal or common law. issue To preclude the litigation of an issue based on a prior adjudication 14 Bristol, which declined filing a motion for summary judgment, suggests that "[t]he Court should defer the allocation issue until it determines the pool of PRPs." 39 between the parties, a party must establish "(1) an identity of issues (that is, that the issue sought to be precluded is the same as that which was involved in the prior proceeding), (2) actuality of litigation (that is, that the point was actually litigated in the earlier proceeding), (that is, final (3) finality of the earlier resolution that the issue was determined by a valid and binding judgment or order), and (4) the centrality of the adjudication (that is, that the determination of the issue in the prior proceeding was essential to the final judgment or order)." Faigin v. issues, Kelly, "[i]t is 184 F.3d at 78. common ground With respect to identity of that the reach of collateral estoppel 'must be confined to situations where the matter raised in the second suit is identical in all respects to that decided in the first proceeding.'" Id. at 78. (Emphasis added). In the case now before the Court, it appears that the argument for collateral estoppel fails to clear the first hurdle because the Davis litigation was a contribution action for reimbursement of future soil remediation costs, whereas now Ashland seeks recovery of costs it expended on groundwater cleanup. in the present case also took part in the Although the parties Davis litigation, and their respective liabilities for depositing hazardous waste at the Davis Site is at the core in both litigations, the mechanics of the liability determination for each case are conceptually different and require a separate analysis. 40 One actions of the brought pursuant to recovery action significant under Section differences Section 113 (f) under 107 (a) relates Section between cost and to 107(a), recovery contribution liability. "CERCLA claims In a imposes cost strict liability for the costs of cleanup on a party found to be an owner or operator, past operator, States v. Davis, transporter, 261 F.3d 1, 28-29 or arranger." (1st Cir. 2001). United It is well established that, generally, Section 107 imposes joint and several liability on PRPs regardless of fault, unless the harm is capable of apportionment. United States v. Davis, 261 F.3d at 29 ("CERCLA allows for full recovery of costs from a party sued successfully under § 9607"); United States v. Chern-Dyne Corp., 572 F.Supp. 802 (S.D. Ohio 1983). The seminal case of Chern-Dyne established that, while Section 107 does not explicitly mandate "joint and several liability," this "was not intended as a rejection of joint and several liability." Chern-Dyne, 572 F. Supp. at 808. Rather, "the scope of liability [is to be] determined under common law principles, where a court performing scenarios a case by associated case with evaluation of the multiple-generator complex waste factual sites will assess the propriety of applying joint and several liability on an individual basis." Id. Chern-Dyne has provided the basis for divisibility of harm analyses in this and other Circuits. ~, O'Neil v. Picillo, 883 F.2d 176 41 (1st Cir. See 1989) ("The rule adopted by the majority of courts, and the one we adopt, is based on the Restatement (Second) of Torts: damages should be apportioned only if the defendant can demonstrate that the harm is divisible.") Burlington Northern and Santa Fe Ry. Co. v. United States, 129 S.Ct. 1870, 1881 (2009) (listing cases) ("The Chern-Dyne approach has been fully embraced by the Courts of Appeals."). The effect First Circuit placing of the noted in Picillo burden on responsible parties rarely escape that " [t] he practical defendants has been that j oint and several liability" because a determination of the amount of environmental harm may be impossible. Picillo, 883 F.2d at 178-79. "Nevertheless, courts have continued to impose joint and several liability on a regular basis, reasoning that where all of the contributing causes cannot fairly be traced, Congress intended for those proven at least partially culpable to bear the cost of the uncertainty." Id. at 179 (citing Chern-Dyne, 572 F.Supp. At 809-810. In sum, in a recovery action under Section 107 (a), courts will typically assign j oint and several liability. "Apportionment is proper only when the evidence supports the divisibili ty of the damages jointly caused by the PRPs." Burlington Northern and Santa Fe Ry. Co. v. United States, 129 S.Ct. 1870, 1882 n.9, 173 L.Ed.2d 812 (2009) Hercules, 107(a) Inc., 247 F.3d 706, 715 (8th Cir. i United States v. 2001) (In a Section action "[l]iability is strict and is typically joint and several") . 42 By ,contrast, a suit for contribution under Section 113(f) expressly allows the court Uto allocate response costs among liable parties using such equitable factors as the court determines are appropriate." 42 U.S.C.§ 9613(f) (1). Acushnet Co. Corp., 191 F.3d 69, 78 (1st Cir. 1999); Coastal States, 450 cases) (U[O]verwhelming F.3d 607, of Mohasco Elementis Chromium L.P. v. 612 majority v. (5th our Cir. sister 2006) (listing circuits have concluded that liability is merely several under § 113(f) ."). See Restatement (Second) of Torts § 433A (1976) (UDamages for harm are to be apportioned among two or more causes where (a) there are distinct harms, or (b) there is a reasonable basis for determining the contribution of each cause to a single harm.") . Further, in a Section 107 recovery case, it is the defendant who bears the burden to show that the harm is divisible and that it would be inequitable to forego an allocation of costs. Burlington Northern and Santa Fe Ry. Co. v. united States, 129 S.Ct. at 1881, 173 L.Ed.2d 812 (UNot all harms are capable of apportionment and CERCLA defendants seeking to avoid joint and several liability bear the burden of proving that a reasonable apportionment exists.") (citing Chern-Dyne Corp., 810 (D.C. Ohio 1983)). See Restatement (Second) basis for 572 F. Supp.802, of Torts § 433B (UWhere the tortious conduct of two or more actors has combined to bring about harm to the plaintiff, and one or more of the actors seeks to limit his liability on the ground that the harm is capable 43 of apportionment among them, the burden apportionment is upon each such actor.") more causes produce a single , of proof However, indivisible as ~[w]hen harm, to the two or 'courts have refused to make an arbitrary apportionment for its own sake, and each of the causes is charged with responsibility for the entire harm.'" Burlington Northern, 129 S.Ct. at 1881 (quoting Restatement (Second) of Torts § 433A, Comment i, p. 440 (1963-1964).) On the other hand, in a contribution action under Section 113, the plaintiff bears the burden of proving (1) that the defendant is a PRP under Section 107(a), United States v. Davis, 261 F.3d at 29, and (2) the defendant's equitable share of costs. Id. at 42-43; Minyard Enter., Inc. v. Southeastern Chern. & Solvent Co., 184 F.3d 373,385 (4th Cir. 1999) (~[u]nder § 113(f) of CERCLA, the Plaintiff bears ... the burden of proving the defendant's equitable share of costs.") . In the original Davis litigation, UTC, which had previously been found jointly and severally liable for all past and future cleanup costs in a direct CERCLA action brought by the United States, asserted Section 113(f) settled the Government's claims. allocate responsibility contribution defendants, for contribution claims after it Davis addressed UTC's request to future soil cleanup costs among including Ashland and the other named defendants in the instant case. After a trial, the trial judge first determined that 44 twenty-six day bench ~[s]ince the hazardous waste deposited at the Davis Site has been commingled into an essentially homogenous "witches' brew", it is impossible to allocate discrete portions of the cleanup costs to any particular type of waste or any particular party." Davis, 31 F.Supp.2d at 64. Because, in a contribution action, a court "enjoys broad discretion to consider and apply such equitable factors as it deems appropriate to achieve a just and fair allocation among liable parties," id. at 62, the trial judge then applied certain equitable factors, including cleanup costs, resulting from disposal, level of culpability, and a PRP's ability to pay. benefit The trial judge then allocated liability among UTC and the other PRPs based on the volume of hazardous waste for which each party could be held responsible. With respect to Morton (Thiokol's successor), the trial jUdge determined that it was "reasonable to infer that some Thiokol waste was included in the waste transported by CCC to the Davis Site . . . [u]nfortunately for UTC, there is no way to determine the amount of Thiokol waste that was transported." Davis, 31 F.Supp.2d at 55. The Court did not assign a percentage of liability to Morton. Nevertheless, Morton was determined to be liable as an arranger for hazardous waste dumped at the Davis Site. Davis, 261 F.3d at 49. An allocation in the context of a contribution claim like Davis is driven primarily by equity considerations, to reduce the burden on a defendant who has been found liable in a direct CERCLA 45 action. United States v. Davis, 261 F.3d at 47 action is intended to afford PRP an (Section 113(f) opportunity to "'seek recoupment of that portion of his expenditures which exceeds his pro rata share of the overall liability - in other words, to seek contribution rather than complete indemnity''') (quoting United Tech. Corp. v. Browning-Ferris Indus., Inc., 33 F.3d 96, 100 (1st Cir. 1994)) . By contrast, liability in a recovery action as asserted by Ashland is generally joint and several. does not come into play unless the Court has now Allocation first made a determination that the pollution caused by the hazardous waste for which the defendants are held responsible is divisible. In addition, the burden on the party seeking recovery under Section 107 or contribution under Section 113 is different. defendant in a direct EPA enforcement action " [W] hile a invoking the divisibility of harm defense bears an 'especially heavy burden,' a defendant in a contribution proceeding seeking to limit his liability has a 'less demanding burden of proof' by virtue of the equitable considerations that immediately come into play." Acushnet Co. v. Mohasco Corp., 191 F.3d at 78. In" sum, it is clear that, under Atlantic Research, Ashland may bring a Section 107(a) action against UTC and the other defendants named herein to connection with seek the recovery groundwater for costs cleanup. it has expended Following in Atlantic Research, UTC's protection under the PCD and the AETC Decree does 46 not extend to avoiding direct recovery claims under Section 107(a). Likewise, Morton's 0% allocation does not preclude a claim for direct recovery for the reasons set forth herein. allocations in Davis, which was a Because the Section 113 (f) contribution action, were based primarily on equitable considerations, they do not automatically apply in this proven, will be j oint and case. Instead, several unless the establish that the hazardous waste is divisible. liability, defendants As if can Atlantic Research indicates, the defendants may seek to offset any recovery claims asserted against them by filing Section 113(f) contribution claims. Davis However, allocations a determination of in future Section the applicability of 113(f) claims would the be premature at this time and is not within the perimeters set by the November 3, 2008 order. Conclusion For the foregoing reasons, the motions for summary judgment by UTC, Gar, Black & Decker, Emhart, Morton, and Life Technologies Corporation are DENIED with respect to the two issues raised in the November 3, 2008 Order Limiting Motions SO ORDERED. Chief United States District Judge July, ~ ,2010 47 for Summary Judgment.

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.