Court Description: OPINION AND ORDER: Granting 16 Motion to Dismiss Complaint as to the United States of America, the Department of Homeland Security, and the Federal Emergency Management Agency. Signed by Judge Gustavo A. Gelpi on 7/1/2021. (MES)

Download PDF
UNITED STATES DISTRICT COURT DISTRICT OF PUERTO RICO 1 2 YASMIN C. REYES DE LEON, 3 4 5 Plaintiff, CIVIL NO. 20-1313 (GAG) v. 8 COCONUT PROP., LLC d/b/a COCONUT PROP., INC; UNITED STATES OF AMERICA; U.S. DEP’T OF HOMELAND SEC., and; FED. EMERGENCY MGMT. AGENCY, 9 Defendants. 6 7 10 OPINION AND ORDER 11 Yasmin C. Reyes de Leon (“Reyes de Leon” or “Plaintiff”) filed the above-captioned 12 complaint against Coconut Properties, LLC, d/b/a Coconut Properties, Inc., the United States of 13 America, the Department of Homeland Security, and the Federal Emergency Management Agency 14 (“FEMA”) alleging breach of contract, unjust enrichment, and fraudulent representation after FEMA 15 supposedly failed to remove Katherine Ortiz (“Ortiz”) from Plaintiff's property at the end of the 16 temporary housing period that was part of FEMA’s emergency response in the aftermath of 17 Hurricanes Irma and Maria. (Docket No. 1). Plaintiff seeks to recover for breach of contract under 28 18 U.S.C. § 1346(a)(2) (“The Tucker Act”) as well as Articles 1054, 1059, 1060 of the Puerto Rico Civil 19 Code, P.R. LAWS ANN. tit. 31, §§ 3018, 3023, and 3024. (Docket No. 1 ¶¶ 37, 40). 20 Presently before the Court is United States of America’s motion to dismiss the instant 21 complaint as to itself, FEMA, and the Department of Homeland Security (collectively, “Defendants”) 22 for lack of subject matter jurisdiction and failure to state a claim upon which relief can be granted 23 pursuant to FED. R. CIV. P. 12(b)(1), (6). (Docket No. 16). Plaintiff opposed. (Docket No. 20). With 24 25 26 Civil No. 20-1313 (GAG) 1 leave of Court, Defendants replied. (Docket No. 40). For the ensuing reasons, the Court GRANTS 2 Defendants’ motion to dismiss at Docket No. 16. 3 I. Factual Background 4 On September 20, 2017, in the aftermath of Hurricane Maria, FEMA issued declaration 5 FEMA-DR-4339-PR declaring the Commonwealth of Puerto Rico the site of a major disaster 6 pursuant to 42 U.S.C. § 5121 et seq. (“the Stafford Act”). (Docket No. 1 ¶¶ 12-13). The declaration 7 was scheduled to end on March 20, 2019, but was later extended through September 20, 2019. Id. 8 ¶ 13. As part of its emergency response, FEMA offered Direct Temporary Housing Assistance 9 (“DTHA”) to eligible applicants under 42 U.S.C. § 5174. Id. ¶ 12. FEMA implemented a Direct 10 Lease Program to provide DTHA, which allowed approved applicants to stay in temporary housing 11 until the Direct Lease Program ended on September 20, 2019. (Docket Nos. 1 ¶ 12; 16 at 7, 9). 12 FEMA contracted out all of its administrative functions regarding property leasing for the Direct 13 Lease Program to property management companies such as Coconut Properties, LLC. (Docket Nos. 14 1 ¶¶ 14-15; 16 at 8; 16-1 (Blanket Purchase Agreement) at 9). FEMA’s sole responsibility was to 15 assess whether applicants met the eligibility requirements of the Direct Lease Program. (Docket 16 Nos. 1 ¶ 12; 16 at 8). 17 On February 12, 2018, Reyes de Leon signed a property management agreement with 18 Coconut Properties, LLC, regarding her three-bedroom real estate property in Ponce, Puerto Rico. 19 (Docket Nos. 1 ¶ 16). This agreement “indicated that the ‘agent’ Coconut Properties, LLC was 20 under contract to [FEMA] to lease on its behalf the property to be utilized to provide housing to 21 eligible individuals[.]” Id. On May 16, 2018, Coconut Properties, LLC, signed a temporary housing 22 agreement with Ortiz, which provided Reyes de Leon’s property to Ortiz as temporary housing 23 assistance. (Docket Nos. 1 ¶ 17; 16-3 (Temporary Housing Agreement)). 24 25 2 26 Civil No. 20-1313 (GAG) 1 Despite receiving FEMA’s written notifications to vacate, Ortiz remained in possession of 2 Reyes de Leon’s property beyond the Direct Lease Program’s expiration date on September 30, 3 2019. (Docket No. 1 ¶¶ 17, 19, 21). Reyes de Leon continues to pay both the utilities and the 4 mortgage of the property after the temporary housing agreement ended. Id. ¶¶ 19, 21. Likewise, 5 Reyes de Leon incurred legal expenses from an eviction process that she initiated in Puerto Rico 6 Local Court. Id. ¶ 19. 7 After the Direct Lease Program ended, a FEMA quality assurance specialist told Reyes de 8 Leon over email that FEMA would continue to pay Ortiz’s rent until she vacated the property. 9 (Docket Nos. 1 ¶ 17; 16 at 9; 16-7 (Email)). 10 11 II. Motion to Dismiss for Lack of Subject-Matter Jurisdiction: 12(b)(1) a. Standard of Review 12 A defendant may move to dismiss an action for lack of subject matter jurisdiction pursuant 13 to FED. R. CIV. P. 12(b)(1). Marrero v. Costco Wholesale Corp., 52 F. Supp. 3d 437, 439 (D.P.R. 14 2014). When considering a 12(b)(1) motion, the Court may consider all pleadings submitted by the 15 parties. Aversa v. U.S., 99 F.3d 1200, 1210 (1st Cir. 1996). The Court “is not restricted to the face 16 of the pleadings but may consider extra-pleading materials, such as affidavits and testimony to 17 resolve factual disputes concerning the existence of jurisdiction.” Fernández Molinary v. Industrias 18 La Famosa, Inc., 203 F. Supp. 2d 111, 114 (D.P.R. 2002) (citing Land v. Dollar, 330 U.S. 731, 735 19 (1947)). The pertinent inquiry is whether the challenged pleadings set forth allegations sufficient to 20 demonstrate that the subject matter jurisdiction of the Court is proper. Marrero, 52 F. Supp. 3d at 21 439; Casey v. Lifespan Corp., 62 F. Supp. 2d 471, 474 (D.R.I. 1999). 22 A Rule 12(b)(1) challenge comes in two forms: (1) defendants can challenge the pleader’s 23 compliance with FED. R. CIV. P. 8(a)(1), or (2) defendants can challenge the Court’s actual subject 24 matter jurisdiction, regardless of the formal sufficiency of the pleadings. Torres Vazquez v. Com. 25 3 26 Civil No. 20-1313 (GAG) 1 Union Ins. Co., 417 F. Supp. 2d 227, 236 (D.P.R. 2006). A pleading alleges that subject matter 2 jurisdiction is defective under FED. R. CIV. P. 8(a)(1) “when the allegations in the complaint are 3 insufficient to show that the federal court has jurisdiction over the subject matter of the case.” Torres 4 Vazquez, 417 F. Supp. 2d at 236-37, n. 7. In other words, the complaint is defective and must be 5 dismissed despite the existence of actual subject matter jurisdiction, unless the deficiency is cured. 6 See id. at 236, n. 7. 7 The burden of proof in a 12(b)(1) motion falls on the party asserting jurisdiction. Thomson 8 v. Gaskill, 315 U.S. 442, 446 (1942). In reviewing the motion, the Court must construe the 9 complaint liberally and the pleadings are to be taken as true, “according the plaintiff the benefit of 10 all reasonable inferences.” Murphy v. U.S., 45 F.3d 520, 522 (1st Cir. 1995). Dismissal would be 11 proper if the facts alleged reveal a jurisdictional defect not otherwise remediable. Sumitano Real 12 Estate Sales (N.Y.), Inc. v. Quantum Dev. Corp., 434 F. Supp. 2d 93, 95 (D.P.R. 2006). Lastly, the 13 Court has broad discretion as to the manner in which preliminary questions of jurisdiction are to be 14 resolved. Torres Vazquez, 417 F. Supp. 2d at 233, n. 3. 15 b. Legal Analysis and Discussion 16 Defendants argue that the Court lacks subject matter jurisdiction because Plaintiff’s 17 claims—founded upon FEMA’s major disaster declaration—are of the exclusive jurisdiction of the 18 United States Court of Federal Claims. (Docket No. 16 at 2, 12-14). Defendants cite 28 U.S.C. § 19 1491(a)(1), which states, in relevant part, that the United States Court of Federal Claims shall have 20 jurisdiction over claims against the United States founded upon any express or implied contract 21 with the United States. (Docket No. 16 at 2, 12). Defendants point to 28 U.S.C § 1346(a)(2), stating 22 that district courts have concurrent jurisdiction with the United States Court of Federal Claims over 23 claims against the United States not exceeding $10,000. (Docket No. 16 at 12). 24 25 4 26 Civil No. 20-1313 (GAG) 1 The Tucker Act, 28 U.S.C. §§ 1346, 1491, functions as a waiver of sovereign immunity and 2 is thus strictly construed by courts. Smith v. Orr, 855 F.2d 1544, 1552-53 (5th. Cir. 1988) (citing 3 Library of Congress v. Shaw, 478 U.S. 310, 317 (1986)). As such, the appropriate measure to 4 determine the amount in controversy is “the total amount of back pay the plaintiff stands ultimately 5 to recover in the suit and is not the amount of back pay accrued at the time the claim is filed.” 6 Smith, 855 F.2d at 1553 (emphasis added). “Any other interpretation would circumvent 7 congressional intent in limiting the Tucker Act jurisdiction of the district courts to claims not 8 exceeding $10,000.” Id. 9 According to her complaint, Plaintiff claims $9,000.00 from the United States pursuant to 10 28 U.S.C. § 1346, stemming from the contract formed when the “United States of America took 11 plaintiff’s property and gave its possession to a third party.” (Docket No. 1 ¶¶ 3-4, 40-41). In 12 addition, Plaintiff claims damages in the amount of $103,510.00 from Coconut Properties, LLC. 13 Id. ¶¶ 3, 42. Plaintiff seeks a combined total compensation of $112,510.00. Id. ¶ 24. However, 14 because Plaintiff states in her complaint that “[d]efendants are jointly and severally liable,” Id. ¶ 15 43, and later states in her opposition that FEMA may be held vicariously liable, (Docket No. 20 at 16 7-8), Plaintiff’s aggregate claim far exceeds the $10,000 limit for monetary claims against the 17 federal government in district courts. 18 Plaintiff correctly notes that plaintiffs with monetary claims against the United States in 19 excess of $10,000 can proceed in district courts if they waive all recovery in excess of that amount. 20 (Docket No. 20 at 7) (citing Zumerling v. Devine, 769 F.2d 745, 748 (Fed. Cir. 1985); Stone v. 21 United States, 683 F.2d 449, 451 (D.C. Cir. 1982)). Nevertheless, Plaintiff fails to indicate that she 22 waives recovery in excess of $10,000. 23 The Court has subject matter jurisdiction over Plaintiff’s claim against the United States for 24 $9,000 because the claim is below the maximum $10,000 claim limit for Tucker Act claims in 25 5 26 Civil No. 20-1313 (GAG) 1 district courts. However, by failing to waive all recovery over $10,000 in conjunction with 2 Plaintiff’s allegations of joint and several liability or, as in later pleadings, vicarious liability, the 3 challenged pleadings have failed to set forth allegations sufficient to demonstrate that the subject 4 matter jurisdiction of the Court is proper pursuant to FED. R. CIV. P. 8(a)(1) and 12(b)(1). As such, 5 Plaintiff’s pleading as to the claims for breach of contract, unjust enrichment, and false 6 representations is defective and must be dismissed. Torres Vazquez, 417 F. Supp. 2d at 236, n. 7. 7 8 III. Motion to Dismiss: 12(b)(6) a. Standard of Review 9 When considering a motion to dismiss for failure to state a claim upon which relief can be 10 granted under FED. R. CIV. P. 12(b)(6), the Court analyzes the complaint in a two-step process using 11 the current context-based “plausibility” standard established by the Supreme Court. See Schatz v. 12 Republican State Leadership Comm’n., 669 F.3d 50, 55 (1st Cir. 2012) (citing Ocasio-Hernández 13 v. Fortuño-Burset, 640 F.3d 1, 12 (1st Cir. 2011), which discusses Ashcroft v. Iqbal, 556 U.S. 662 14 (2009) and Bell Atl. Corp. v. Twombly, 550 U.S. 544 (2007)). First, the Court must “isolate and 15 ignore statements in the complaint that simply offer legal labels and conclusions or merely rehash 16 cause-of-action elements.” Schatz, 669 F.3d at 55. A complaint does not need detailed factual 17 allegations, but “[t]hreadbare recitals of the elements of a cause of action, supported by mere 18 conclusory statements, do not suffice.” Iqbal, 556 U.S. at 678. Second, the Court must then “take 19 the complaint’s well-pled (i.e., non-conclusory, non-speculative) facts as true, drawing all 20 reasonable inferences in the pleader’s favor, and see if they plausibly narrate a claim for relief.” 21 Schatz, 669 F.3d at 55. Plausible means something more than merely possible, and gauging a 22 pleaded situation’s plausibility is a context-specific job that compels the Court to draw on its 23 judicial experience and common sense. Id. (citing Iqbal, 556 U.S. at 679). This “simply calls for 24 25 6 26 Civil No. 20-1313 (GAG) 1 enough facts to raise a reasonable expectation that discovery will reveal evidence of” the necessary 2 element. Twombly, 550 U.S. at 556. 3 “[W]here the well-pleaded facts do not permit the court to infer more than the mere 4 possibility of misconduct, the complaint has alleged—but it has not ‘show[n]’—‘that the pleader is 5 entitled to relief.’” Iqbal, 556 U.S. at 679 (quoting FED. R. CIV. P. 8(a)(2)). If, however, the “factual 6 content, so taken ‘allows the court to draw the reasonable inference that the defendant is liable for 7 the misconduct alleged,’ the claim has facial plausibility.” Ocasio-Hernández, 640 F.3d at 12 8 (quoting Iqbal, 556 U.S. at 678). 9 Moreover, at the motion to dismiss stage, “the Court may consider: [1] ‘implications from 10 documents’ attached to or fairly ‘incorporated into the complaint,’ [2] ‘facts’ susceptible to ‘judicial 11 notice,’ and [3] ‘concessions’ in a plaintiff’s ‘response to the motion to dismiss.’” Nieto-Vicenty v. 12 Valledor, 984 F. Supp. 2d 17, 20 (D.P.R. 2013) (quoting Schatz, 669 F.3d at 55-56). At the Court’s 13 discretion, if it chooses to consider materials outside of the pleadings, a motion to dismiss should 14 be converted to a motion for summary judgement under FED. R. CIV. P. 56. See Trans-Spec Truck 15 Serv., Inc. v. Caterpillar Inc., 524 F.3d 315, 321 (1st Cir. 2008). 16 Under certain “narrow exceptions,” some extrinsic documents may be considered without 17 converting a motion to dismiss into a motion for summary judgement. Freeman v. Town of Hudson, 18 714 F.3d 29, 36 (1st Cir. 2013) (citing Watterson v. Page, 987 F.2d 1, 3 (1st Cir. 1993)). These 19 exceptions include “documents, the authenticity of which are not disputed by the parties; official 20 public records; documents central to plaintiffs’ claim; [and] documents sufficiently referred to in 21 the complaint.” Freeman, 714 F.3d at 36 (quoting Watterson, 987 F.2d at 3). “[I]t is well-established 22 that in reviewing the complaint, we ‘may properly consider the relevant entirety of a document 23 integral to or explicitly relied upon in the complaint, even though not attached to the complaint, 24 without converting the motion into one for summary judgment.’” Clorox Co. P.R. v. Proctor & 25 7 26 Civil No. 20-1313 (GAG) 1 Gamble Com. Co., 228 F.3d 24, 32 (1st Cir. 2000) (citing Watterson, 987 F.2d at 3-4); see also 2 Schatz, 669 F.3d 55-56, n. 3. 3 b. Discussion 4 Defendants maintain that Plaintiff does not have standing under FED. R. CIV. P. 12(b)(6) to 5 state a plausible breach of contract claim upon which relief can be granted because “any alleged 6 injury she suffered is not traceable to Defendants.” (Docket No. 16 at 2, 14-15). Specifically, 7 Defendants argue that Plaintiff’s breach of contract claims fail “for the reasons stated in Plaintiff’s 8 complaint—she did not have a contract with FEMA.” (Docket No. 16 at 14 (citing Docket No. 1 ¶¶ 9 16, 20)). Instead, Defendants point out that Plaintiff solely entered into a property lease with 10 Coconut Properties, LLC, who “had the contractual obligation to the property owner[, Reyes de 11 Leon,] to properly inform and adhere to the program requirements and obligations as directed in its 12 [agreement with FEMA,]” (Docket No. 16-1 (Blanket Purchase Agreement) at 9), “and Statement 13 of Work,” (Docket No. 16-2 at 3), “including the landlord-tenant lease requirement,” (Docket No. 14 16-5 (Occupant Lease Agreement) at 4), “that informed the landlord[, Reyes de Leon,] to effect 15 evictions” against her tenant, Ortiz. (Docket No. 16 at 14-15). 16 Defendants further support the contention that Reyes de Leon never signed a contract 17 directly with FEMA by citing to the Lease Addendum, which states: “The Owner[, Reyes de Leon,] 18 agrees to pursue eviction based on FEMA’s determination of ineligibility or end of the period of 19 assistance.” (Docket Nos. 16-4 (Lease Addendum) ¶ 16(b); 40 at 2). The Lease Addendum likewise 20 contains a controlling provision stating that “in the case of any conflict between the provisions of 21 this Addendum and other sections of the Lease between the Owner[, Reyes de Leon,] and Applicant, 22 [Ortiz,] the provisions of this Addendum shall apply.” (Docket No. 16-4 (Lease Addendum) ¶ 1). 23 As a condition of occupancy, Ortiz was “required to execute [the temporary housing agreement 24 with Coconut Properties, LLC,] and a landlord-tenant Lease[] with the Owner[, Reyes de Leon,] 25 8 26 Civil No. 20-1313 (GAG) 1 along with the required FEMA Lease addendum.” (Docket No. 16-3 (Temporary Housing 2 Agreement) at 1-2). 3 Defendants conclude that “FEMA neither entered into a property lease with [Ortiz] nor a 4 property lease with the Plaintiff” because Reyes de Leon solely had a contract with Coconut 5 Properties, LLC, since FEMA contracted out all of its functions regarding property leasing to 6 Coconut Properties, LLC. (Docket Nos. 16 at 7-8; 40 at 4; 16-1 (Blanket Purchase Agreement) at 7 9). 8 “[S]tanding is an essential and unchanging part of the case-or-controversy requirement of 9 Article III.” Lujan v. Defenders of Wildlife, 504 U.S. 555, 561 (1992). To meet its burden of 10 establishing standing, a plaintiff must show: (1) an injury in fact; (2) fairly traceable to the 11 defendant’s challenged conduct; (3) likely to be redressed by a favorable decision. Friends of the 12 Earth, Inc. v. Laidlaw Env’t. Servs., 528 U.S. 167, 180-81 (2000). 13 To satisfy the traceability element of standing, Plaintiff argues that “between the plaintiff 14 and defendants there was the formation of a written contract,” under the terms of which Plaintiff 15 has fully performed. (Docket No. 1 ¶¶ 26, 40). As the Court understands it, Plaintiff cites to the 16 “Direct Lease Contract” for support that FEMA entered into a lease agreement with Plaintiff. Id. ¶ 17 14. Plaintiff interprets this document to say that FEMA became Plaintiff’s tenant. Id. Plaintiff finds 18 further support for this contention in Defendants’ Motion to Dismiss, in which Defendants cite to 19 42 U.S.C § 5174(c)(1)(B)(ii)(I)(aa) to explain that “FEMA can enter into property lease agreements 20 with property owners . . .” (Docket No. 20 at 7 (citing Docket No. 16 at 6)). When quoting this 21 passage from Defendants’ motion to dismiss, Plaintiff omitted the final limiting clause prohibiting 22 property lease agreements with survivor-tenants as well as the next sentence explaining, “[i]n this 23 case, FEMA contracted Coconut Properties[, LLC] to administer the Direct Lease Program and 24 engage in and enter into lease agreements with the property owners.” (Docket No. 16 at 6). 25 9 26 Civil No. 20-1313 (GAG) 1 The conclusory statements in Plaintiff’s complaint alleging, without proof, a lease between 2 FEMA and Reyes de Leon, whereby FEMA would have a duty to evict Ortiz, are in direct conflict 3 with statements in the evidence of record, which clearly states both that Plaintiff did not have a 4 lease with FEMA and that FEMA was not responsible for evicting Ortiz. The Court may properly 5 consider these exhibits without converting the FED. R. CIV. P. 12(b)(6) motion into a Rule 56 6 summary judgement motion because the exhibits are documents central to Plaintiff’s breach of 7 contract claim and are sufficiently referred to in the complaint. Watterson, 987 F.2d at 3-4. 8 Plaintiff misconstrues FEMA’s role in this Direct Lease Program. Accepting all of 9 Plaintiff’s non-legal conclusory statements of fact, Plaintiff fails to show a contract between herself 10 and FEMA. FEMA does not have statutory authority to enter into a leasing agreement with Plaintiff 11 under 42 U.S.C. § 5174(c)(1)(B)(ii)(I)(aa).1 Moreover, the Lease Addendum clearly states that it is 12 Reyes de Leon’s duty as the owner to evict the tenant. (Docket No. 16-4 ¶ 16(b)). Coconut 13 Properties, LLC, was responsible for all leasing components of the Direct Lease Program, not 14 FEMA. (Docket No. 16-2 (Statement of Work) at 1). FEMA was solely responsible for screening 15 applicant-tenants during this process. (Docket No. 16-1 at 9 (Blanket Purchase Agreement)). Thus, 16 FEMA cannot be held liable for failing to evict Ortiz because FEMA neither signed a contract with 17 Plaintiff nor had a duty to evict. Plaintiff’s breach of contract claim is more properly aimed at 18 Coconut Properties, LLC, rather than FEMA. 19 Plaintiff’s fraudulent representation claim also fails to state a claim upon which relief can 20 be granted pursuant to FED. R. CIV. P. 12(b)(6). Accepting as true Plaintiff’s statement that a FEMA 21 representative told her that FEMA would pay rent for the tenant’s holdover period (Docket No. 16- 22 7 (Email) at 1), Plaintiff cannot collect damages because payments from the United States Treasury 23 24 1 42 U.S.C § 5174(c)(1)(B)(ii)(I)(aa) authorizes FEMA to enter into lease agreements only with owners of multifamily rental properties. 25 10 26 Civil No. 20-1313 (GAG) 1 are limited to those authorized by statute, and a government employee’s erroneous advice to a 2 benefits claimant “does not create a basis for providing benefits not otherwise permitted by law.” 3 Yancey v. District of Columbia, 991 F. Supp. 2d 171, 178 (D.D.C. 2013) (citing Off. Of Pers. 4 Mgmt. v. Richmond, 496 U.S. 414, 415-16, 423-24, 429 (1990)). 5 Lastly, Plaintiff’s unjust enrichment claim against Defendants likewise fails to state a claim 6 under FED. R. CIV. P. 12(b)(6). Once the Direct Lease Program ended, Defendants no longer had an 7 obligation to provide housing for Ortiz. Plaintiff has thus failed to demonstrate how Defendants 8 benefited from Ortiz’s holdover period. 9 IV. Conclusion 10 Plaintiff’s claims against the United States of America, the Department of Homeland 11 Security, and FEMA, a/k/a Defendants, must be dismissed under FED. R. CIV. P. 12(b)(1) because 12 Plaintiff’s allegations of the Court’s subject matter jurisdiction are defective under FED. R. CIV. P. 13 8(a)(1). In addition, Plaintiff lacks standing to assert her breach of contract claims against the 14 Defendants and shall be dismissed pursuant to FED. R. CIV. P. 12(b)(6) because Plaintiff cannot 15 demonstrate the existence of a contract between FEMA and herself that imposed upon FEMA 16 contractual duties to evict Ortiz at the end of the Direct Lease Program. Moreover, Plaintiff’s 17 fraudulent representation claim fails to state a claim upon which relief can be granted according to 18 Rule 12(b)(6) because Defendants are not statutorily permitted to pay for Ortiz’s stay beyond the 19 end of the Direct Lease Program. Lastly, Plaintiff fails to state an unjust enrichment claim under 20 Rule 12(b)(6) because Plaintiff cannot prove that Defendants themselves benefited from Ortiz’s 21 rent-free stay beyond the end of the Direct Lease Program. 22 23 24 25 11 26 Civil No. 20-1313 (GAG) For the foregoing reasons, the Court GRANTS Defendants’ motion to dismiss at Docket 1 2 No. 16. 3 SO ORDERED. 4 In San Juan, Puerto Rico, this 1st day of July 2021. s/ Gustavo A. Gelpí GUSTAVO A. GELPI United States District Judge 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 12 26

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.