KINGSLY COMPRESSION, INC. v. MOUNTAIN V OIL & GAS, INC., No. 2:2009cv00316 - Document 60 (W.D. Pa. 2010)

Court Description: MEMORANDUM and ORDER granting 57 Motion for Judgment; JUDGMENT is entered in favor of plaintiff, Kingsly Compression, Inc., and against defendant, Mountain V Oil & Gas, Inc., in the amount of $1,696,063.48; Judgment is for monetary damages only; Nothing in this order construes plaintiff retaining possession of the natural gas compressor that is subject of this action. Signed by Chief Judge Gary L. Lancaster on 11/30/10. (map)

Download PDF
KINGSLY COMPRESSION, INC. v. MOUNTAIN V OIL & GAS, INC. Doc. 60 IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF PENNSYLVANIA KINGSLY COMPRESSION, INC., Plaintiff, v. Civil Action No. 09-0316 MOUNTAIN V OIL & GAS, INC. Defendant. MEMORANDUM Gary L. Lancaster, Chief Judge. Novemberjf, 2010 This action arises out of a compressor. judgment On September 28, in ( "Kingsly" ), favor of 2010, plaintiff, holding that defendant, lease for a natural gas this court granted summary Kingsly Compression, Mountain V Oil & Gas, Inc. Inc. ("Mountain V"), breached the parties' agreement ("Equipment lease") by, inter alia, refusing to accept the natural gas compressor ("the Unit") when Kingsly made it available [Doc. No. 56]. Additionally, this court held that the parties did not appropriately brief the damages issues in their summary judgment briefs. This court directed the parties to submit additional briefing which was to include proposed damages calculations. Based upon the parties' submissions, we determine that Kingsly seeks to recover the payments that Mountain V owes under the Dockets.Justia.com Equipment lease, plus costs for insuring the Unit, and interest. Specifically, Kingsly alleges that the Equipment lease contains an acceleration clause, making the amount due immediately payable upon defaul t . Kingsly further contends that the total lease payments due and owing equal the monthly lease payments ($28,900.00) multiplied by the term of the lease (60 months) which equals $1,734,000.00. the alternative, Kingsly contends that Mountain v In owes $1,734,000.00, less the $231,200.00 that Mountain V paid to date, for a total of $1,502,800, plus interest in the amount of $188,844.48 and costs of insurance in the amount of $4,419.00 as of October 31, 2010. Mountain V disagrees and states that the Equipment lease does not contain an acceleration clause. Mountain V also contends that even if the lease did have an acceleration clause, Kingsly impliedly waived the right to receive accelerated lease payments by agreeing to take partial payments upon default and not immediately demanding accelerated payments. Mountain V further contends that applying the purported acceleration clause while Kingsly was still in possession of the property would result in a "double recovery" counter to Pennsylvania law. Pending before this court is Kingsly's summary judgment motion on the issue of damages [Doc. No. reasons, Kingsly's motion will be granted. 2 57] For the following I . BACKGROUND The factual and procedural background of this matter was extensively set forth in Memorandum and Order granting Kingsly's Motion for Summary Judgment [Doc. No. 56]. We have construed this current motion as a motion for summary judgment on the issues of damages. Accordingly, the following facts are not in dispute. On April 17, 2007, Kingsly and Mountain V entered into a lease agreement whereby Kingsly compressor to Mountain V. agreed The part to lease a natural gas agreed that the compressor was to be used at Mountain V' s facility at Hackett field in Washington County, Pennsylvania. The Equipment lease term was for 5 years. Section 3 of the Equipment lease states that "the term of this Lease is [s]ixty (60) months commencing when Lessee takes possession of the Equipment . . . " [Doc. No. 57, Ex. A]. In addition, Section 9 of the Equipment lease included the following provision as a remedy for default: Subject to the provision of Section 8, upon the occurrence of any default by LESSEE, LESSOR may terminate this Lease, demand that LESSEE return the Equipment to such location as LESSOR may designate; and/or enter upon the premises where the Equipment is located and take immediate possession of same and remove same. LESSEE shall be liable to LESSOR for rentals due and to become due for the term of this Lease, together with all of the costs of transportation, repairs and reletting of Equipment. [Id. ] On April 17, 2008, after approximately 56 weeks of negotiations between the parties regarding the Unit, Kingsly sent 3 an email to Mountain V stating that it was preparing and making plans to deliver the Unit. In response, Mountain V indicated that it was not ready for the Unit at that time. In that communication, Mountain V did not indicate that it would never take possession of the Unit, nor did it indicate that it was terminating the lease. Mountain V also did not address whether it would take possession of the Unit if Kingsly was unable to find another lessee or buyer for it. Ultimately, Mountain V never took possession of the Unit. Kingsly informed Mountain V it had more than $900,000.00 invested in the Unit. Kingsly further advised Mountain V of s position that Mountain V should make lease payments from the time the Unit would be made available until Kingsly could find an alternate lessee or purchaser. Mountain V did not agree. Kingsly sent Mountain V a letter dated April 30 f 2008, and asked Mountain V to agree in writing that Kingsly could lease or sell the Unit to another company. Mountain V refused. On June 2, 2008, Jeffery Sable, Kingsly's president, emailed Mike Shaver, Mountain V's president, indicating that he had potential buyers for the Unit. He wanted to make sure, however, that Mountain V still did not want the Unit, and if that was the case, he wanted Mountain V to sign a Mountain V refused to sign the formal release to that effect. release. 4 During the summer of 2008, Kingsly and Mountain V engaged in numerous discussions in an attempt to resolve this dispute. In August, 2008, Mountain V started making payments to KingslYi however, Mountain V refused to formally agree to make payments until Kingsly was able to find an alternate purchaser or lessee for the Unit. The parties never reached a settlement agreement and despite its best forts, Kingsly was unsuccessful in reletting the property. Between August, 2008 to December, 2008, Mountain V paid Kingsly a total of $231,200.00. On December 2, 2008, Mountain V sent a "notice of termination of the lease" to Kingsly and demanded that Kingsly return Mountain V's $231,200.00. Mountain V's outside Kingsly refused. legal counsel sent On January 15, 2009, a letter to Kingsly terminating the lease because the Unit had been delivered too late. On March 13, 2009, Kingsly filed the instant lawsuit. On February 23, 2010, plaintiffs and defendants filed cross motions for summary judgment. On September 28, 2010, the court entered judgment as a matter of law in favor of Kingsly on the issue of liability, finding that Mount V had breached the lease by surrendering the property and defaulting on the rental payments. The court concluded, however, that because Mountain V did not provide al ternative damages calculations, we could not reward damages based solely on Kingsly's calculations. The court declined to determine damages 5 that opinion and stated it would submissions [Doc. Nos. 57, 58 & determine damages upon further 59] . Kingsly now seeks damages through October 31, 2010. In its present motion, Kingsly calculated that the total lease payments due and owing are equal to the monthly lease payments ($28,900.00) multiplied by the term of the lease (60 months) which is $1,734,000.00, or $1,734,000.00, Mountain V paid to date, seeks to add interest l insurance, which less the $231,200.00 a total of $1,502,800.00. , equals which equals $188,844.48 2 $ 4,419.00, , that Kingslyalso and costs of through October 31, 2010. Conversely, Mountain V did not provide calculations for damages in Prejudgment interest is governed by state law, while post judgment interest is governed by federal law. SBA Network Services, Inc. v. Telecom Procurement Services, Inc., 250 Fed. Appx. 487, 492 (3d Cir. 2007) (citations omitted) ("We have held that a court sitting in diversity awards prejudgment interest pursuant to the law of the forum.") . While Kingsly did not request interest in their Equipment lease, the appellate courts in the Commonweal th of Pennsylvania have reasoned that interest is automatically awardable in such contract actions regardless "of when it is demanded, [citation omitted], or whether it is demanded. Fernandez v. Levin, 548 A. 2d 1191, 1193 (Pa. 1988) . 2 Prejudgment interest is correctly awarded as a component of a damages award when the amount of damages is "ascertainable with mathematical precision. Donau Furnier, GmbH v. M & T Veneer Corp. , 715 F.Supp.2d 604 (M.D. Pa. 2010) (citations omitted), which is the case in the present action. Under Pennsylvania law, where no express rate of interest is stated in a contract, plaintiff's interest is calculated at the rate of 6% annum. 41 Pa.Stat.Ann. § 202 (Purdon Supp.Pamph.1989). See also Jarvis v. Johnson, 668 F.2d 740, 745 n. 6 (3d Cir. 1981). 1 II II 6 its response to Kingsly's motion and simply contends that money damages are not due to plaintiff. 7 II. LEGAL STANDARD Fed. R. Civ. P. 56(c) provides that summary judgment may be granted if, drawing all inferences in favor of the non-moving party, "the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any materi fact and that the moving party is entitled to a judgment as a matter of law." ,477 U.S. 242, 247 (1986) Anderson v. (internal quotation marks omitted) . The mere existence of some factual dispute between the part will not defeat an otherwise properly supported motion for summary judgment. might Id. at 247-48. A dispute over those facts that fect the outcome of the suit under the governing substantive law, i.e., the material facts, however, will preclude the entry of summary judgment. Id. at 248. Similarly, summary judgment is improper so long as the dispute over the material facts is genuine. In determining whether the dispute is genuine, the court's function is not to weigh the evidence or to determine the truth of the matter, but only to determine whether the evidence of record is such that a reasonable jury could return a verdict for the nonmoving party. Childers v. 842 F.2d 689, 693-94 (3d Cir.1988). 8 It is on this standard Kingsly seeks to recover the payments that Mountain V owes under the the Unit, , plus costs for insuring and interest through October 31, Kingsly alleges that the Equipment 2010. Specifically, contains an acceleration clause, making Mountain V immediately liable upon defaul t. Mountain V contends that the acceleration clause is invalid and ambiguous on its . It further contends that the ambiguous acceleration clause must be construed against Kingsly as to not allow for a double recovery. The court has reviewed plaintiff's motion for summary judgment on the issue of damages and defendant IS response thereto. Based on the pleadings and evidence of record, the arguments of counsel, and the briefs filed in support and opposition thereto, the court concludes, as a matter of law that no genuine dispute over materi facts remains which precludes summary judgment in this matter. III. DISCUSSION A. Ambiguity of the Purported Acceleration Clause Mountain V contends that the acceleration c is invalid and ambiguous on its face. In construing a contract, the court is to determine the intent of the contracting parties. Homart Dev . 662 A.2d 1092,1097 (Pa. Super. 1995) (citing Marcinak 9 v. Se. Greene School Dist., 544 A.2d 1025, 1027 (Pa. Super. 1988)). In a contract that is unambiguous on its face, we look first to the words contained in the contract to determine the intent. See Int'l Org. Master, Mates and Pilots of America, Local No.2 v. Int'l Org. Masters, Mates and Pilots of America, 439 A.2d 621, 624 (Pa. 1981) (quoting Foulke v. Miller, 112 A.2d 124, 127 (Pa. 1955)). In doing so, "[t] he court will adopt an interpretation that is most reasonable and probable bearing in mind the objects which the parties intended to accomplish through the agreement. II Homart Dev. Co., 662 A.2d at 1098 (citation omitted) . A contract is ambiguous, however, when its terms are reasonably capable of being understood in more than one sense. Missett v. Hub Intern. Pa., LLC, 2010 WL 3704984, at *9 (Pa. Super. 2010) . A contract is not rendered ambiguous merely because the ies do not agree upon the proper construction, nor may a court rely upon an unreasonable interpretation to create ambiguity. Bohler-Uddeholm America, Inc. v. Ellwood Group, Inc., 247 F.3d 79, 93 (3d Cir. 2001) (citing Duquesne Light Co. v. Westinghouse Elec. 66 F.3d 604, 614 (3d Cir. 1995). That is, any agreement, s of how plainly stated, can appear to be ambiguous if it is given an unreasonable interpretation. of a contract interpretations is ambiguous [must and reasonably the contract] 10 Only "where the meaning be susceptible construed most of two strongly against the party who drew it." Lawson v. Insurance Co. of North America, 70 Pa. D. & C.2d 646, 647 (Pa. Com. Pl. 1975) i see Donau Furnier, GmbH v. M & T Veneer Corp., 715 F.Supp.2d 604, 608 (M.D.Pa. 2010) . It is well established that rent acceleration clauses are enforceable under Pennsylvania law and a lessor! s remedy. valid expansion of American Mul ti -Cinema, Inc. v. Posel Enters., No. 91-3782, 1992 WL 328891, at *9 (E.D. Pa. October 27, 1992) Pierce v. Hoffstot, 236 A.2d 828 (Pa. Super. clauses are intended to be in the nature of penalt Moreover, American Multi-Cinema, Inc., (citing 1967)} i Restatement (Second) of Property Landlord & Tenant § 12.1 cmt. k (1977). the lessor. a These in favor of 1992 WL 328891, at *9. "[t]hey are viewed as a guarantee to the that he will receive immediately all the monies to which he is ent led under the lease without having to harness a reluctant tenant as periodical payments become due." In Id. Pennsylvania, lease agreements require and unequivocal language indicating that, upon defaul t, the lessor shall receive acceleration of damages. See Gittlin v. Slovinac, 1928 WL 4411, *1 (Pa. Super. 1928). However, no specific word or phrase is required to render a provision an acceleration clause. of liability must be clear on its face. 11 The language Section 9 of the Equipment lease provides that, upon default in the payment of any installment of rental, "the lessee is liable to lessor for rentals due and to become due for the term of this Lease, together with all of the costs of transportation, repairs and reletting of Equipment." [Doc. 57, Ex. A]. This is a valid acceleration clause because it is clear and unequivocal and is not reasonably susceptible American Seating Co. 1933) (citations to v. an alternative Murdock, omitted). The 169 A. terms of interpretation. 250, this 254 (Pa. See Super. provision are not reasonably capable of being understood in any other terms than upon default, Mountain V must pay accelerated lease payments. Accordingly, the Equipment Lease has a valid acceleration clause. B. Enforceability of the Acceleration Clause Kingsly contends that Mountain V surrendered the Unit. However, Kingsly did not accept surrender and it has not repossessed the Unit from Mountain V, entitling it to enforce the acceleration clause. In pursuing compensatory damages for breach of a lease under Pennsylvania law, a lessor must elect either (a) repossession and actual damagesi or (b) acceleration of the balance due. 1600 Penn Corp. v. Computer Sciences Corporation, No. 06-5329, 2008 WL 4443016, at *14 (E.D. Pa. Sept. 30, 2008)i seeOnalv. BPAmocoCorp., 275 F.Supp.2d 650,668 (E.D. Pa. Aug. 6, 2003) (citing Finkle v. Golf 12 W. Mfg. Co., 744 F.2d 1015, 1021 (3d Cir. 1984)). In the instant case, Kingsly has chosen eration of the balance due. Once a lessee is found liable for future lease payments, however, the lessee may be relieved of liability if he surrenders possession and the landlord accepts the surrender. 2008 WL 4443016, at *14. 1600 Penn Corp. , The burden is on the lessee to show the lessor accepted surrender by clear and convincing evidence. Id. i see Onal, 275 F.Supp.2d at 669. To prove evidence that the surrender, the lessee cannot merely produce resumed possession of the leased goods. 1600 Penn Corp., 2008 WL 4443016, at *14. Rather, "the [lessor's] actions must be "adverse to a reoccupation of [the property] by [the lessee] and [to] a renewal of the relations created by the lease." Onal, 275 F.Supp.2d at 669 (citing Stonehedge Square Ltd. P'ship v. Movie Merchs Inc., 685 A.2d 1019, 1023 (Pa. Super. 1996)). If the lessor does not accept the surrender of the goods and the lease contains an acceleration clause, the lessor is entitled to receive as a lump sum all rents that will fall due during the unexpired term of the lease. 1600 Penn Corp., 2008 WL 4443016, at *14. In the instant case, because the lease contains a valid acceleration clause and Kingsly has not accepted the surrender of the Unit, Kingsly is entitled to receive as a lump sum all rents that 13 will fall due during the unexpired term of the lease for the following reasons. First l by re ing to take possession of the agreed upon Unitl Mountain V surrendered the Unit to Kingsly. did not accept surrender of the Unit. or listing the Unit rental, KingslYI however I Accepting partial payments particularly without actually re-Ietting it, does not constitute acceptance of surrender. actions have in no way erfered wi th Mountain V I S Such possessory rights and access to the property. The Unit continually remains available in Texas where it was originally delivered and reconditioned so that Mountain V could take possession. Moreover, the breach occurred when Mountain V refused to take possession of the Unit and refused to pay rental payments. A lessee simply leaving the property in the lessor1s custody is not clear and convincing proof of acceptance of surrender. Kingsly attempted, on several occasions l to get Mountain V to either pay the rental payments and take possession of the Unit or allow Kingsly to re-Iet the Unit. AccordinglYI Mountain V refused both options. c. Implied Waiver of Acceleration clause Mountain V contends that Kingsly I s acceptance of the $231,200.00 in payments between August, 2008 and December, 2008, if applied to the principal and interest arrearage, would constitute a waiver of the right to invoke the acceleration clause in the lease. 14 A "waiver is the intentional relinquishment of a known right. Consolo Rail Corp. v. II F.Supp. 26, 29 (E.D. Pa. 1983) 401 (Pa. 1962). i Delaware and Hudson Ry. Co., 569 Brown v. Pittsburgh, 186 A.2d 399, "To consti tute a waiver of a legal right, there must be a clear, unequivocal and decisive act of the party with knowledge of such right and an evidence purpose to surrender it." Brown, 86 A.2d at 401. However, the waiver can be express or implied. Mountain v contends that Kingsly's actions constitute an implied waiver.3 However, enforce its "proof of (contractual) (a party's) failure to rigorously rights does not sustain the burden of establishing an implied waiver" under Pennsylvania law. Consolo Rail Corp., 569 F.Supp. at 29 (citing Sellersville Sav. and Loan Assoc. v. Kelly, 29 B.R. 1016 (E.D.Pa.1983) i Nahas v. Nahas, 103 A.2d 473, 475 (Pa. Super. 1954) 298 (Pa. 1947)). Continental Arms i Steinman v. La Charty Hotels Co., 50 A.2d 297, See, U.S. Sav. Bank of Newark, N.J. Inc., 338 A.2d 579 1 583 (Del. Super. 1975). v. The doctrine of implied waiver "applies only to situations involving circumstances equivalent to an estoppel, and the person claiming the waiver to prevail thereby. II must show that he was misled and prejudiced Consolo Rail Corp., 569 F.Supp. at 29 -30 (citing Brown, 186 A.2d at 401) . 3 Kingsly does not claim express waiver nor is there an express waiver present. 15 In the instant case, Kingsly did not waive s right to enforce the acceleration clause quoted above by accepting the rental payments for the Unit. Between August, 2008 to December, 2008, Mountain V made payments to Kingsly in the amount of $231,200.00. Mountain V has not presented any evidence to show or to suggest that it was prejudiced by Kingsly1s acceptance of the partial payments. Mountain V's monthly obligations under the lease is approximately $28,900.00. The deficiency existing as of October 31, is 2010, $722,500.00, and is clearly in excess of the $231,200 payments given. Mountain V is still in default and Kingsly has yet to receive payment in full. Though Mountain V contends that Kingsly waived its right to accelerate lease payments by its failure to invoke the acceleration clause immediately, Pennsylvania law does not require such rigorous action to maintain contractual unequivocally and properly elected to enforce provision by instituting this action. rights. Kingsly the acceleration Thus, Kingsly has not waived its contractual rights to accelerate future rental payments. D. "Double recovery" and Possession of the Unit Kingsly contends that awarding accelerated payments while they are still in possession of the Uni t would not resul t in a "double recovery. It While Kingsly possesses the Unit due to Mountain V's surrender, they are not requesting possession as their damages. 16 Mountain V contends, however, that not only does the acceleration clause allow Kingsly to recover the amount of rent due under the terms of the lease, but it also allows Kingsly to retain possession of the Unit for its own use or re-Iet any rents collected. Kingsly is, therefore, position than if the lease had been performed. Uni t and retain placed in abetter Mountain V claims this "double recovery" not only violates the general principles of law against double recovery, but also violates the terms the lease, which specifically states that actual rents collected are to be offset against the amount of the claim. Thus, Mountain V contends that the acceleration clause is an unenforceable penalty. A plaintiff may not obtain a double recovery for a single wrong. Homart Dev. Co., 662 A.2d at 1100. Under Pennsylvania law "'upon breach of a material condition in a commercial lease a landlord must elect repossession and actual damages or acceleration of the balance due.' " anal, 275 F.Supp.2d at 668 (citing Finkle v. Golf W. Mfg. Co., 744 F.2d 1015, 1021 (3d Cir.1984)). This rule prevents t from a lessor from reaping the double recovery "that would a rule allowing a landlord to possess the property I and possibly reap a profit from renting or selling it I at the same time that he collects rent from a breaching [lessee]." at *14. 1600 Penn Corp., 2008 WL 4443016, However, where the lessor is not asking the court to award both possession and, therefore, accelerated rent, the 17 sk double recovery is not present and not relevant. Hirsh v. Carbon Lehigh Intermediate Unit #21, 65 Pa. D. &C.4th 390, 418 (Pa. Com. PI. 2003). Kingsly's right to money damages does not constitute a double recovery for the reasons set forth below. First, Mountain V has voluntarily relinquished possession of the property to Kingsly. If Mountain V would have taken possession of the Unit on or about September 29, 2008, when it was made available, then it would still have possession under the terms of the five year lease, and would be making monthly lease payments to Kingsly as of the date of this opinion. Kingsly has not sought judicial intervention to exclude Mountain V from possessing the Unit. Kingsly is not asking the court to award it both possession and accelerated rent. It seeks a judgment only for the accelerated rent and other damages. Second, Kingsly has agreed to deduct the total partial payments Mountain V has accelerated rent due. made while in default from the total In the absence of this position, Mountain V would have correctly asserted that Kingsly was recovering the amount of $231,200.00 twice. In addition, Kingsly's attempts to re let the Unit was not to exclude Mountain V from possession or for Kingsly to take possession, but was for the purpose of mitigating damages. Accordingly, because it is not requesting possession as a part of 18 its judgment, Kingsly I s claim for accelerated rent does not represent a double recovery and is valid. IV. CONCLUSION Accordingly, Kingsly's motion for summary judgment on the issue of damages [Doc. No. 57] will be granted. An appropriate order follows. 19 IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF PENNSYLVANIA KINGSLY COMPRESSION, INC., Plaintiff, v. Civil Action No. 09-0316 MOUNTAIN V OIL & GAS, INC. Defendant. AND NOW, this ORDER day of November, 2010, upon consideration of plaintiff's motion for summary judgment on the issue of damages, and defendant's response thereto, [Doc. No. 57, 58 & 59], IT IS HEREBY ORDERED that plaintiff's motion [Doc. No. 57] is GRANTED. It is further ordered that judgment in the amount of $1,696,063.48 shall be entered in Kingsly Compression, Inc.'s favor. Kingsly's judgment against Mountain V Oil & Gas, Inc. includes the following: a. Compensatory damages: b. Incidential damages/Insurance 2010): c. $ 1,734,000.00; (as of October 31, $ 4,419.00; 6% per annum statutory interest on the balance due for accelerated rent only (as of October 31, 2010): $188,844.48; d. Subtotal: $ 1,927,263.48; e. Less Mountain V's partial payments: - $ 231,200.00; f. Principal Amount Due (as of October 31, 2010): $1,696,063.48; g. Nothing in this order construes Kingsly retaining possession of subj ect of the natural this action. gas compressor that This judgment is is for monetary damages only. ____________________________ , C.J. cc: All counsel of record

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.