Clay v. Bigelo, LLC, No. 3:2021cv00285 - Document 17 (S.D. Cal. 2021)

Court Description: ORDER denying 5 Plaintiff's Ex Parte Application for Temporary Restraining Order. Signed by Judge Gonzalo P. Curiel on 3/24/2021. (All non-registered users served via U.S. Mail Service)(jmr)

Download PDF
Clay v. Bigelo, LLC Doc. 17 Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.284 Page 1 of 12 1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 SOUTHERN DISTRICT OF CALIFORNIA 10 11 JONATHAN CLAYTON, Case No.: 21cv285-GPC(BLM) Plaintiff, 12 13 v. 14 BIGELO, LLC, a Nevada limited liability company; and DOES I-IX, inclusive, 15 Defendants. 16 17 18 19 20 21 22 23 24 25 ORDER DENYING PLAINTIFF’S EX PARTE APPLICATION FOR TEMPORARY RESTRAINING ORDER [Dkt. No. 5.] Before the Court is Plaintiff’s ex parte application for temporary restraining order (“TRO”) filed on March 12, 2021. (Dkt. No. 5.) Defendant filed an opposition on March 17, 2021. (Dkt. No. 12.) Plaintiff filed a reply on March 22, 2021.1 (Dkt. No. 14.) A hearing was held on March 23, 2021. (Dkt. No. 16.) Based on the parties’ briefs, the supporting documentation, the applicable law, and the arguments at the hearing, the Court DENIES Plaintiff’s ex parte application for temporary restraining order. /// /// 26 27 28 1 On March 23, 2021 Defendant filed a motion to strike reply as not authorized by the Court and raising additional arguments not raised in the motion. (Dkt. No. 15.) While Plaintiff did not seek leave to file a reply, the Court considered it. Thus, the Court DENIES Defendant’s motion to strike. 1 21cv285-GPC(BLM) Dockets.Justia.com Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.285 Page 2 of 12 1 Background 2 The case was removed from state court on February 16, 2021. (Dkt. No. 1.) 3 Plaintiff Jonathan Clay (“Plaintiff” or “Clay”) filed a complaint seeking declaratory and 4 injunctive relief against Defendant Bigelo, LLC (“Defendant”) for breach of covenant for 5 starting to build a two-story residence in the La Jolla Foothills Community. (Id.) 6 Plaintiff is the owner and resident of a home located at 5456 Castle Hills Drive in San 7 Diego, CA and purchased his property around August 21, 2019. (Dkt. No. 5-1, Clay 8 Decl. ¶ 1; Dkt. No. 12-1, Barry Decl., Ex. A.) Defendant is the owner of real property 9 located at 1369 Vue De Ville Ct., San Diego, CA 92109 and purchased it on July 10, 10 2019. (Dkt. No. 5-1, Clay Decl. ¶ 1; Dkt. No. 12-1 Barry Decl. ¶ 3.) Both properties are 11 located within the La Jolla Foothills Community (“Community”) and subject to its 12 Declaration of Restrictions (“Restrictions”), which was recorded on September 13, 1962 13 as Document No. 1962-158238 with the County of San Diego. (Dkt. No. 5-1, Clay Decl. 14 ¶ 2; id., Ex. B.) Plaintiff asserts his property is located about 400 feet northeast of 15 Defendant’s property. (Dkt. No. 5-1, Clay Decl. ¶ 1.) Defendant claims Plaintiff’s 16 property sits on a bluff about 36 feet above Defendant’s property. (Dkt. No. 12-1, Barry 17 Decl., Ex. B-4 at 15.2) 18 Paragraph 4 of the Restrictions, the provision in dispute, provides, 19 (4) No buildings shall be erected on any of said lots until the complete plans and specifications for such building and the location thereof, together with a landscape plan, and a grading plan, if a grading plan is requested, have been approved by a Committee appointed by said Owner; provided however, that in the event said Committee fails to approve or disapprove such design and location, landscaping plan and grading plan, if such grading plan is requested, within thirty (30) days after the submission of said plans to them or, there is no such Committee appointed or elected, then such approval will not be required provided that any dwelling and out-building to be erected, and the grading and landscaping conform to and are in harmony with similar structures in said tract; provided further, that said plans and specifications 20 21 22 23 24 25 26 27 28 2 Page numbers are based on the CM/ECF pagination. 2 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.286 Page 3 of 12 1 2 3 4 5 6 shall be drawn by and the supervision of construction thereunder, after Committee approval, shall be made by a licensed architect; provided further, that such Committee may approve the services of a competent designer in lieu of the services of a licensed architect, if such designer’s request for consideration be submitted in writing to such Committee prior to the drafting of plans and specifications; provided, further, that no structure or building of more than one story in height shall be erected without the prior approval of said Committee. 7 (Dkt. No. 5-1, Clay Decl., Ex. B.) Both parties agree that a “Committee” was never 8 established or does not currently exist as contemplated under the Restrictions. (Dkt. No. 9 5 at 7; Dkt. No. 12-1, Barry Decl. ¶ 19; see also Dkt. No. 12-1, Ackroyd Decl. ¶ 6.) 10 Around November 27, 2019, Defendant submitted a permit application with the 11 City of San Diego to construct a two-story family residence on the property which was 12 approved. (Dkt. No. 5-2, Goulet Decl. ¶ 6; id., Ex. C.) Despite letters sent by 13 homeowners of the Community to Defendant, it has begun construction of a two-story 14 residence and failed to respond to efforts to resolve the issue. (Dkt. No. 5-1, Clay Decl. 15 ¶¶ 6, 7.) 16 On July 16, 2020, Plaintiff’s counsel sent a letter to Defendant requesting that 17 Defendant cease construction of the two-story structure and comply with the Restrictions. 18 (Dkt. No. 5-2, Goulet Decl. ¶ 8; id., Ex. D.) On August 21, 2020, Plaintiff’s counsel 19 attempted to record a Notice of Claim of Breach of Declaration of Restriction with the 20 San Diego Recorder’s Office pursuant to the dispute resolution procedures outlined in the 21 Restrictions but the San Diego Recorder’s office advised it will not record the Notice of 22 Claim. (Id. ¶ 9; id., Ex. E.) Then Plaintiff’s counsel proceeded to comply with the 23 dispute resolution procedures provided by California Civil Code section 5930. (Id. ¶ 9.) 24 On October 1, 2020, Defendant’s counsel informed Plaintiff that Defendant will 25 not cease construction. (Id. ¶ 10.) On November 10, 2020, Plaintiff’s counsel sent a 26 Request for Resolution letter to defense counsel requesting that Defendant agree to 27 mediation. (Id. ¶ 11.) The letter was also a pre-condition to filing an action for breach of 28 covenants, conditions and restrictions in the superior court. (Id.; id., Ex. F.) Despite the 3 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.287 Page 4 of 12 1 pendency of this action, Defendant continues to construct a two-story residence and laid 2 the foundation in February 2021. (Id. ¶ 13.) By way of this application, Plaintiff seeks a 3 temporary restraining order prohibiting Defendant from proceeding with the construction 4 of the two-story residence arguing that the Declaration of Restrictions bars two-story 5 residences in the La Jolla Foothills Community. Defendant opposes. 6 Discussion 7 The purpose of a TRO is to preserve the status quo before a preliminary injunction 8 hearing may be held; its provisional remedial nature is designed merely to prevent 9 irreparable loss of rights prior to judgment. Granny Goose Foods, Inc. v. Brotherhood of 10 Teamsters & Auto Truck Drivers, 415 U.S. 423, 439 (1974). The legal standard that 11 applies to a motion for a TRO is the same as a motion for a preliminary injunction. See 12 Stuhlbarg Int'l Sales Co. v. John D. Brush & Co., 240 F.3d 832, 839 n. 7 (9th Cir. 2001). 13 To obtain a TRO or preliminary injunction, the moving party must show: (1) a likelihood 14 of success on the merits; (2) a likelihood of irreparable harm to the moving party in the 15 absence of preliminary relief; (3) that the balance of equities tips in the moving party’s 16 favor; and (4) that an injunction is in the public interest. Winter v. Natural Res. Def. 17 Council, Inc., 555 U.S. 7, 20 (2008). Injunctive relief is “an extraordinary remedy that 18 may only be awarded upon a clear showing that the plaintiff is entitled to such relief,” 19 Winter, 555 U.S. at 22, and the moving party bears the burden of meeting all four Winter 20 prongs. See DISH Network Corp. v. FCC, 653 F.3d 771, 776-77 (9th Cir. 2011). 21 A. Likelihood of Success on the Merits 22 Plaintiff argues that the Restrictions runs with the 37 lots of the La Jolla Foothills 23 Community, including Defendant’s property, and even though there is no Committee to 24 oversee approvals, the Restrictions must be complied with by the owners and subsequent 25 owners. Even though there are two-story homes in the community that breach the 26 covenant, the Restrictions run with the land and Plaintiff has the right to enforce the 27 provisions of the Restrictions. Defendant disagrees with Plaintiff’s interpretation of the 28 Restrictions maintaining that Plaintiff cherry picks sections of the Restrictions to support 4 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.288 Page 5 of 12 1 his argument. It contends that read as a whole, the Restrictions does not include an 2 express prohibition on constructing two story homes in the community and does not 3 provide property owners with the unfettered right to bar construction of two-story homes 4 in order to preserve a homeowner’s view. In fact, among the 37 homes in the 5 community, there are 9 two-story homes, including a one-story home adjacent to 6 Plaintiff’s residence. (Dkt. No. 12-1, Barry Decl., Ex. F-1.) Moreover, per the 7 Restrictions, which incorporates all ordinances regulations and resolution of the City of 8 San Diego pertaining to construction of dwelling units, the San Diego Development 9 Services Department reviewed Defendant’s plans and drawings and then issued a permit 10 for construction. (Dkt. No. 5-2, Goulet Decl., Ex. C.) Finally, Defendant argues that the 11 Restrictions does not expressly protect the views in the community. 12 The complaint alleges one count for breach of covenant pursuant to California 13 Civil Code section 1460 which provides, “[c]ertain covenants, contained in grants of 14 estates in real property, are appurtenant to such estates, and pass with them, so as to bind 15 the assigns of the covenantor and to vest in the assigns of the covenantee, in the same 16 manner as if they had personally entered into them. Such covenants are said to run with 17 the land.” Cal. Civ. Code § 1460. (Dkt. No. 1, Compl. ¶¶ 17-20.) 18 “The same rules that apply to interpretation of contracts apply to the interpretation 19 of CC & R's.” Fourth La Costa Condominium Owners Assn. v. Seith, 159 Cal. App. 4th 20 563, 575 (2008) (quoting Chee v. Amanda Goldt Prop. Mgmt., 143 Cal. App. 4th 1360, 21 1377 (2006)). Under contract interpretation, a “contract must be so interpreted as to give 22 effect to the mutual intention of the parties as it existed at the time of contracting, so far 23 as the same is ascertainable and lawful.” Templeton Dev. Corp. v. Superior Ct., 144 Cal. 24 App. 4th 1073, 1085 (2006) (quoting Cal. Civ. Code § 1636). “If the plain, 25 commonsense meaning of a statute's words is unambiguous, the plain meaning controls.” 26 Id. at 1081; see Cal. Civ. Code § 1638 (“The language of a contract is to govern its 27 interpretation, if the language is clear and explicit, and does not involve an absurdity.”). 28 Further, the “whole of a contract is to be taken together, so as to give effect to every part, 5 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.289 Page 6 of 12 1 if reasonably practicable, each clause helping to interpret the other.” Cal. Civ. Code § 2 1641. 3 The general rule is that “restrictive covenants are construed strictly against the 4 person seeking to enforce them, and any doubt will be resolved in favor of the free use of 5 land.” Chee, 143 Cal. App. 4th at 1377; Smith v. North, 244 Cal. App. 2d 245, 248 6 (1966) (where a restrictive covenant is “subject to more than one interpretation, that 7 construction consonant with the unencumbered use of the property will be adopted,” and 8 “any doubt therein is resolved against enforcement of the restriction”].). The Court must 9 assess the “intent of the parties and the object of the deed or restriction should govern, 10 giving the instrument a just and fair interpretation. The intention of the parties is to be 11 determined from the document as a whole, and if possible still give effect to every part.” 12 Zabrucky v. McAdams, 129 Cal. App. 4th 618, 622 (2005) (internal quotations and 13 citations omitted). Further, “[r]estrictions on the use of land will not be read into a 14 restrictive covenant by implication, but if the parties have expressed their intention to 15 limit the use, that intention should be carried out, for the primary object in construing 16 restrictive covenants, as in construing all contracts, should be to effectuate the legitimate 17 desires of the covenanting parties.” Hannula v. Hacienda Homes, 34 Cal. 2d 442, 444-45 18 (1949). 19 Here, Plaintiff relies solely on the last sentence in paragraph 4 stating “[n]o 20 structure or building of more than one story in height shall be erected without the prior 21 approval of said Committee” to support his argument that the Restrictions clearly limit 22 homes to a single-story residence in the Community. (Dkt. No. 5 at 6-7.) He further 23 claims that even though no Committee exists to oversee the approvals, the Restrictions 24 run with the land and must be followed by owners and subsequent owners absent a 25 Committee or association to enforce them. (Id.) Defendant responds that since no 26 Committee was ever created, the Restrictions only requires that a structure that is erected 27 be in conformity and in harmony with similar structures in the Community. (Dkt. No. 12 28 at 6.) It contends its structure conforms with other structure in the Community. 6 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.290 Page 7 of 12 1 The Court agrees with Defendant that Plaintiff fails to give effect to the entirety of 2 paragraph 4 which provides guidance on how to procced when a Committee is not 3 appointed or elected. According to paragraph 4 of the Restrictions, 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 (4) No buildings shall be erected on any of said lots until the complete plans and specifications for such building and the location thereof, together with a landscape plan, and a grading plan, if a grading plan is requested, have been approved by a Committee appointed by said Owner; provided however, that in the event said Committee fails to approve or disapprove such design and location, landscaping plan and grading plan, if such grading plan is requested, within thirty (30) days after the submission of said plans to them or, there is no such Committee appointed or elected, then such approval will not be required provided that any dwelling and out-building to be erected, and the grading and landscaping conform to and are in harmony with similar structures in said tract; provided further, that said plans and specifications shall be drawn by and the supervision of construction thereunder, after Committee approval, shall be made by a licensed architect; provided further, that such Committee may approve the services of a competent designer in lieu of the services of a licensed architect, if such designer’s request for consideration be submitted in writing to such Committee prior to the drafting of plans and specifications; provided, further, that no structure or building of more than one story in height shall be erected without the prior approval of said Committee. (Dkt. No. 5-1, Clay Decl., Ex. B.) As an initial matter, contrary to Plaintiff’s argument, a plain reading of the last sentence of paragraph 4 does not strictly limit homes to a single story in the Community. It merely states that a structure more than one story may not be built without prior approval of the Committee. Therefore, a two-story structure may be built if there were Committee approval and no absolute bar exists to build a two-story home in the Community. Furthermore, the Restrictions contemplates a situation in the event a Committee is never appointed or elected. Paragraph 4 states that if there is no Committee, then approval is not required as long as the structure, the grading and 26 landscaping conform “to and are in harmony with similar structures in said tract.” (See 27 id.) Therefore, the issue becomes whether Defendant’s planned structure is in harmony 28 7 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.291 Page 8 of 12 1 with similar structures in the tract which Plaintiff does not appear to challenge in the 2 Complaint or the motion for TRO but did challenge at the hearing. 3 At the hearing, Plaintiff argued that the provision addressing when there is no 4 Committee appointed or elected is an exception that applies to the provisions before it 5 and not to the provisions after it. Therefore, even without prior Committee approval, 6 Plaintiff claims that no two-story residence may be erected. The Court disagrees. Taking 7 into consideration the entirety of paragraph 4, which constitutes one long run-on 8 sentence, and giving effect to all the provisions, and that “restrictive covenants are 9 construed strictly against the person seeking to enforce them,” Chee, 143 Cal. App. 4th at 10 1377, the Court concludes that the Restrictions does not absolutely limit the erection of 11 buildings or structures to a single-story and when no Committee has been appointed or 12 elected, Committee approval is not necessary as long as the structure conforms and is in 13 harmony with other similar structures in the community. Accordingly, Plaintiff’s claim 14 that the Restrictions strictly bars two-story residences in the Community fails. 15 To the extent Plaintiff relies on a TRO granted to homeowners in the Community 16 by the San Diego Superior Court on August 15, 1995 in Barton v. Mabile, the TRO order, 17 itself, does not support Plaintiff’s position that the case is precedent upholding the 18 Restrictions’ prohibition against two-story homes. (Dkt. No. 5, Ex. A at 14-15.) Plaintiff 19 provides his rendition of the facts of the Barton case, (Dkt. No. 5 at 10-11), but he fails to 20 provide any documentation to support these facts. Moreover, the TRO filed with the 21 superior court does not provide any details as to the factual bases of the parties’ 22 argument. Instead, the TRO enjoined the defendants from constructing or installing a 23 structure, including a roof, of more than one story in height because the structure violated 24 the San Diego Municipal Code. (Id. at 14-16.) The TRO was not based on a violation of 25 the Declaration of Restrictions. (Id.) Therefore, the Barton case does not support 26 Plaintiff’s argument. 27 Plaintiff also claims a constitutional right to privacy and cites to Tom v. City and 28 Cnty. of San Francisco, 120 Cal. App. 4th 674, 679-80 (2004); however, that case dealt 8 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.292 Page 9 of 12 1 with a city ordinance and an “’autonomy privacy’ interest in choosing the persons with 2 whom a person will reside, and in excluding others from one's private residence.” Id. at 3 680. The Tom case does not address right to privacy of a homeowner from a neighbor’s 4 construction and does not support Plaintiff’s position. 5 On the other hand, Defendant contends that Plaintiff has no right to a view. 6 “California landowners do not have a right of access to air, light and view over adjoining 7 property.” Mira Mar Mobile Comty. v. City of Oceanside, 119 Cal. App. 4th 477, 492 8 (2004) (citing Wolford v. Thomas, 190 Cal. App. 3d 347, 358 (1987)). The court of 9 appeals in Taliaferro concluded that a landowner cannot claim damages when an 10 adjoining landowner “does something strictly on his own property which shuts off the air 11 and light” to the first landowner. Taliaferro v. Salyer, 162 Cal. App. 2d 685, 689 (1958). 12 In order to have a right to a cause of action seeking the right for light or air, there must 13 have been an express grant or covenant for light or air. Katcher v. Home S. & L. Assn., 14 245 Cal. App. 2d 425, 429 (1966). In Katcher, four homeowners sued the owner and 15 developer of a large parcel of land in the San Fernando Valley alleging their vested 16 property rights in the panoramic view, privacy, and “‘extraordinary light and air’” were 17 violated by the defendant's construction of terraced homes in violation of the zoning plan. 18 Id. at 427. The court of appeal affirmed the trial court's grant of summary judgment, 19 holding that “[i]t has long been established in this state that a landowner has no easement 20 over adjoining land for light and air in the absence of an express grant or covenant.” Id. 21 at 429. 22 In reply, Plaintiff cites to Mock v. Shulman, 226 Cal. App. 2d 263, 265-66 (1964), 23 where the court of appeal affirmed the trial court’s finding that the defendants, whose 24 cypress trees were taller than six feet, breached the restrictions stating “[n]o fence, wall 25 or hedge over six feet in height shall be erected or grown or permitted to exist on any lot 26 or lots in said tract within fifteen feet of any boundary line of any lot; provided, however, 27 that the restrictions set forth in this paragraph 4 may be waived or modified as to any lot 28 or lots in said tract by a written instrument duly executed by the Architectural 9 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.293 Page 10 of 12 1 Supervising Committee.” Id. The trial court found that there was no waiver of the 2 restriction. Id. at 266. It stated that “that the trees interfered with the [plaintiffs’] light 3 and air, and their comfort, use and enjoyment of their property and constituted a 4 continuing nuisance.” Id. The court also noted the general rule that a property right, 5 such as light and air, can be created by an instrument. Id. at 269. In Mock, because the 6 restrictions limited the height of any fence, wall or hedge to six feet, the court found that 7 it protected the homeowners’ right to light and air. 8 In this case, the ban on any structure more than one story without prior approval of 9 the Committee cannot be interpreted as an express covenant for light, view or air. Given 10 that no Committee was appointed or elected, any erection of a structure must only 11 “conform to and [be] in harmony with similar structures in said tract.” (Dkt. No. 5-1, 12 Clay Decl., Ex. B.) Therefore, Plaintiff has not demonstrated that there has been an 13 express grant or covenant for a view in the Restrictions. 14 Accordingly, Plaintiff has not demonstrated a likelihood of success on the merits 15 that Defendant has violated the Restrictions.3 16 B. 17 Likelihood of Irreparable Harm Plaintiff argues that monetary damages would not provide complete relief because 18 money cannot restore the “coveted unobstructed view to Mr. Clay.” (Dkt. No. 5-2, 19 Goulet Decl. ¶ 13). Plaintiff asserts that a two-story residence on Defendant’s property 20 would greatly obstruct his and several neighboring properties’ views of the Pacific 21 Ocean. (Dkt. No. 5-1, Clay Decl. ¶ 8.) In addition, the two-story residence would also 22 encroach on his privacy because he added new glass windows and doors to enjoy his 23 view from the master bedroom and bathroom and kitchen as well as a hot tub in the 24 outdoor space. (Id. ¶ 11.) The two-story structure would provide a “direct line of sight” 25 26 27 28 3 Because the Court concludes that the terms of the Restrictions does not bar the construction of a twostory residence, the Court need not address Defendant’s alternative argument that the doctrine of changed conditions applies. (Dkt. No. 12 at 14.) 10 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.294 Page 11 of 12 1 into Plaintiff’ master bedroom, bathroom and hot tub area. (Id.) Defendant argues that 2 Plaintiff will not suffer any harm because its construction conforms to and is in harmony 3 with the surrounding property in the Community and will not block Plaintiff’s view as its 4 property is lower in elevation than Plaintiff’s residence. Defendant claims it will suffer 5 significant costs to change architectural plans and its inability to enjoy a two-story home 6 that already characterizes the neighborhood. 7 As discussed above, a landowner has no right of access to a view absent an express 8 covenant, and Plaintiff has not demonstrated he has right to privacy; therefore, Plaintiff’s 9 claims of irreparable harm due to loss of his view of the ocean and privacy rights are not 10 persuasive. Even if they did constitute irreparable harm, there are factual issues in 11 dispute as to the extent of the alleged loss of Plaintiff’s views and privacy rights. 12 (Compare Dkt No. 5-1, Clay Decl. 8, 11 with Dkt. No. 12 at 8-9; Dkt. No. 12-1, Barry 13 Decl., Exs. B-1 to B-4.) Accordingly, Plaintiff has not demonstrated irreparable harm. 14 Because Plaintiff has failed to demonstrate likelihood of success on the merits and 15 irreparable harm, the Court declines to address the remaining Winter factors. See 16 RasterOps v. Radius, Inc., 861 F. Supp. 1479, 1498 (N.D. Cal. 1994) (“Because the court 17 finds that [the plaintiff] has failed to establish both of the crucial factors, and therefore 18 cannot grant the requested injunction, the court declines to make findings on the third and 19 fourth factors.”); Klamath–Siskiyou Wildlands Center v. Heywood, Case No. 2:09–cv– 20 2252–JAM–GGH 2009 WL 10692050, at *4 (E.D. Cal. Sept. 24, 2009) (“Because 21 Plaintiffs have failed to demonstrate the first element in the four factor test for a 22 preliminary injunction set forth by the Supreme Court in Winter[ ], this Court declines to 23 reach the other three factors.”). Accordingly, the Court DENIES Plaintiff’s ex parte 24 motion for restraining order. 25 /// 26 /// 27 /// 28 /// 11 21cv285-GPC(BLM) Case 3:21-cv-00285-GPC-BLM Document 17 Filed 03/24/21 PageID.295 Page 12 of 12 1 2 3 4 5 Conclusion Based on the above, the Court DENIES Plaintiff’s ex parte motion for temporary restraining order. IT IS SO ORDERED. Dated: March 24, 2021 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 12 21cv285-GPC(BLM)

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.