Vesuvius USA, Corp. v. American Commercial Lines, LLC, No. 18-1881 (7th Cir. 2018)
Annotate this CaseIn 2014, Vesuvius and ACBL entered into a shipping contract to transport olivine sand from New Orleans to Vesuvius’s Wurtland, Kentucky facility by river barge. The January 2015 shipment arrived at the discharge port on February 20. Vesuvius’s employees inspected the cargo, found it damaged by excess moisture, and notified ACBL. ACBL arranged for a surveyor to perform an inspection that same day. The surveyor found no structural defect in the barge and concluded that the sand was wet when it was loaded. In transit, some of that water evaporated, condensed on the overhead portion of the cargo space, and dripped back onto the sand. The surveyor filed his report with ACBL on February 23. ACBL promptly contacted Vesuvius to disclaim any liability. On February 1, 2017, Vesuvius filed suit. The Seventh Circuit affirmed dismissal of the case. The contract contained a clear limitations provision requiring the parties to bring disputes within four months of an incident. Standing on its own, the limitations provision might be ambiguous, but read in context with the rest of the contract, there is no question that Vesuvius was required to file suit no later than four months after it discovered the damage.
Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.