Washington Revised Code RCW 47.56.120: Toll bridges — Construction directed — Costs.


    In the event that the transportation commission should determine that any toll bridge should be constructed, all cost thereof including right of way, survey, and engineering shall be paid out of any funds available for payment of the cost of such toll bridge under this chapter.

    [1977 ex.s. c 151 § 70; 1961 c 13 § 47.56.120. Prior: 1937 c 173 § 4; RRS § 6524-4.]