46 C.F.R. PART 64--MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS

TITLE 46--Shipping

CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY

SUBCHAPTER F--MARINE ENGINEERING

PART 64--MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS

rule

Subpart A--GENERAL

§64.1
Purpose.
§64.2
Incorporation by reference.
§64.3
Applicability.
§64.5
Definitions.
§64.9
Maintenance, repair, and alteration of MPTs.
rule

Subpart B--STANDARDS FOR AN MPT

§64.11
Design of MPTs.
§64.13
Allowable stress; tank.
§64.15
Allowable stress; framework.
§64.17
Minimum tank thickness.
§64.19
External pressure.
§64.21
Material.
§64.23
Gasket and lining.
§64.25
Cross section.
§64.27
Base.
§64.29
Tank saddles.
§64.31
Inspection opening.
§64.33
Pipe connection.
§64.35
Bottom filling or discharge connection.
§64.37
Valve and fitting guard.
§64.39
Valve securing device.
§64.41
Stop valve closure.
§64.43
Lifting fittings.
§64.45
Securing devices.
§64.47
Type of relief devices.
§64.49
Labeling openings.
§64.51
Tank parts marking.
§64.53
Information plate for MPTs.
§64.55
Relief device location.
rule

Subpart C--PRESSURE RELIEF DEVICES AND VACUUM RELIEF DEVICES FOR MPTS

§64.57
Acceptance of pressure relief devices.
§64.59
Spring loaded pressure relief valve.
§64.61
Rupture disc.
§64.63
Minimum emergency venting capacity.
§64.65
Vacuum relief device.
§64.67
Shutoff valve.
§64.69
Location of the pressure relief device.
§64.71
Marking of pressure relief devices.
rule

Subpart D--[RESERVED]

rule

Subpart E--PERIODIC INSPECTIONS AND TESTS OF MPTS

§64.77
Inspection and test.
§64.79
Inspection of pressure and vacuum relief device.
§64.81
30-month inspection of an MPT.
§64.83
Hydrostatic test.
rule

Subpart F--CARGO HANDLING SYSTEM

§64.87
Purpose.
§64.88
Plan approval, construction, and inspection of cargo-handling systems.
§64.89
Cargo pump unit.
§64.91
Relief valve for the cargo pump discharge.
§64.93
Pump controls.
§64.95
Piping.
§64.97
Cargo hose.
rule