46 C.F.R. PART 52--POWER BOILERS
TITLE 46--Shipping
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
SUBCHAPTER F--MARINE ENGINEERING
PART 52--POWER BOILERS
Subpart 52.01--GENERAL REQUIREMENTS
|
|
| Incorporation by reference.
|
|
|
|
| Adoption of section I of the ASME Code.
|
|
|
|
| Definitions of terms used in this part.
|
|
|
|
| Auxiliary, donkey, fired thermal fluid heater, and heating boilers.
|
|
|
|
| Materials and workmanship.
|
|
|
|
| Fusible plugs (modifies A-19 through A-21).
|
|
|
|
| Increase in maximum allowable working pressure.
|
|
|
|
| Materials (modifies PG-5 through PG-13).
|
|
|
|
| Design (modifies PG-16 through PG-31 and PG-100).
|
|
|
|
| Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55).
|
|
|
|
| Piping, valves and fittings (modifies PG-58 and PG-59).
|
|
|
|
| Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60).
|
|
|
|
| Feedwater supply (modifies PG-61).
|
|
|
|
| Safety valves and safety relief valves (modifies PG-67 through PG-73).
|
|
|
|
| Inspection and tests (modifies PG-90 through PG-100).
|
|
|
|
| Certification by stamping (modifies PG-104 through PG-113).
|
|
|
|
| Manufacturers' data report forms (modifies PG-112 and PG-113).
|
|
Subpart 52.05--REQUIREMENTS FOR BOILERS FABRICATED BY WELDING
|
|
| General (modifies PW-1 through PW-54).
|
|
|
|
| Heat treatment (modifies PW-10).
|
|
|
|
| Radiographic and ultrasonic examination (modifies PW-11 and PW-41.1).
|
|
|
|
| Minimum requirements for attachment welds (modifies PW-16).
|
|
|
|
| Circumferential joints in pipes, tubes and headers (modifies PW-41).
|
|
Subpart 52.15--REQUIREMENTS FOR WATERTUBE BOILERS
|
|
| General (modifies PWT-1 through PWT-15).
|
|
|
|
| Tube connections (modifies PWT-9 and PWT-11).
|
|
Subpart 52.20--REQUIREMENTS FOR FIRETUBE BOILERS
|
|
| General (modifies PFT-1 through PFT-49).
|
|
|
|
| Opening between boiler and safety valve (modifies PFT-44).
|
|
|
|
| Setting (modifies PFT-46).
|
|
Subpart 52.25--OTHER BOILER TYPES
|
|
| Feedwater heaters (modifies PFH-1).
|
|
|
|
| Miniature boilers (modifies PMB-1 through PMB-21).
|
|
|
|
| Electric boilers (modifies PEB-1 through PEB-19).
|
|
|
|
| Organic fluid vaporizer generators (modifies PVG-1 through PVG-12).
|
|
|
|
| Fired thermal fluid heaters.
|
|