South Dakota 07 — Storage, Diversion And Irrigation Works
- 46-7-1 — Excess capacity of works--Availability for beneficial use.
- 46-7-2 — Headgates or other measuring devices required.
- 46-7-3 — Repair of works required--Rules.
- 46-7-4 — Repealed.
- 46-7-5 — Inspection of works by chief engineer--Order for repair of unsafe works--Repair bychief engineer--Costs--Filing of written protest--Hearing--Liability of chief engineerand state.
- 46-7-5.1 — Repair of unsafe works by chief engineer--Costs--Bidding provisions applicable.
- 46-7-5.2 — Breach or repair of works by chief engineer if necessary to protect human life--Costas lien against owner--Other remedies.
- 46-7-5.3 — Investigation of dam--Variance relating to minimum spillway design requirements--Hearing.
- 46-7-5.4 — Definition of terms.
- 46-7-5.5 — Application--Construction of dam before January 1, 1990--Owner and immediatefamily as sole residents--Chief engineer to determine flood plain.
- 46-7-5.6 — Owner's reporting requirements where nonowner establishes habitation within floodplain.
- 46-7-5.7 — Privately owned high-hazard dam--Where chief engineer and state not obligated tosecure safety thereof--Owner's affidavit upon refusal to correct unsafe condition.
- 46-7-5.8 — Requirements as to form and content of owner's affidavit.
- 46-7-5.9 — Board's acceptance of owner's affidavit--Conditions.
- 46-7-5.10 — Recording requirements as to owner's affidavit.
- 46-7-5.11 — Where privately owned high-hazard dam is subject to action by chief engineer andstate.
- 46-7-6 — Repealed.
- 46-7-7 — Repealed.
- 46-7-12 — Willful damage, destruction, or interference with works prohibited.
- 46-7-13 — Repealed.
- 46-7-14 — Unauthorized injury to or interference with pier, boom, or dam prohibited.
- 46-7-15 — Removal or injury of piles prohibited.