New York Real Estate Maps; Preparation, Submission And Adoption Thereof.




 
    §  5-379  Real  estate  maps;  preparation,  submission  and  adoption
  thereof.  After the approval, adoption and filing of a final  map,  plan
  or plans described in section 5-377 of this subchapter, the commissioner
  shall  prepare  and  submit to the board of estimate six similar maps of
  the real estate to be acquired or affected for the purpose  of  carrying
  out  the  said plan or plans, or any part thereof. Upon those maps there
  shall be laid out and separately numbered the various  parcels  of  real
  estate acquisition of which is made necessary for the prosecution of the
  work  authorized  by  this subchapter, including the lands adjoining the
  Esopus creek between the point on such creek, in the town of  Shandaken,
  Ulster  county,  where the Schoharie tunnel empties into such creek, and
  the Ashokan reservoir of the city, in such county, the owners  of  which
  lands  shall  be entitled to recover the decrease in value of such lands
  by reason of  any  acts  of  the  city  under  the  provisions  of  this
  subchapter  or  any  previous  act,  such  damages to be determined by a
  commission in the same manner as damages for the taking of real property
  are determined. On such maps, the property division  lines  existing  at
  the  time  of the survey shall be delineated, and there shall be plainly
  indicated those parcels of which the fee,  and  over  or  through  which
  parcels  the  right  to  use  and  occupy  the  same  temporarily  or in
  perpetuity, is to be acquired. The board of estimate may  adopt,  modify
  or  reject  such  maps in whole or in part and require others to be made
  instead  thereof.  In  case  of  such  rejection,  the  commissioner  of
  environmental protection shall in like manner, as aforesaid, prepare and
  submit  others,  until  maps  shall be approved by the board of estimate
  covering the entire area required for the purpose of  carrying  out  the
  said plan or plans, or any part thereof. Such maps may be made and filed
  in  sections.  One or more sections may be determined before the maps of
  the whole construction are completed. Such sections shall be  determined
  and  decided  upon  previous  to  the  appointment of the commissions as
  hereinafter provided for, and shall be so determined that one commission
  shall not be appointed for a section covering  more  property  than  can
  reasonably  be passed upon and awards made by such commission within the
  limits of a  year  from  the  time  of  the  filing  of  the  oaths,  as
  hereinafter  provided.  The  proceedings  hereinafter authorized may, in
  like manner, be taken separately in reference to one  or  more  of  such
  sections  before  the  maps of the whole are filed. The work upon one or
  more of such sections may be begun before  the  maps  of  the  remaining
  sections are filed. The maps when adopted by the board of estimate shall
  be  transmitted  by  such  board  to  the  corporation  counsel,  with a
  certificate of such adoption written thereon and signed by a majority of
  the board.