Florida K-20 EDUCATION CODE EDUCATIONAL FACILITIES
Chapter 1013Code Resources
Florida Resources
Florida Website
Florida Governor
Florida
Florida Courts
Search this Code
in Google Scholar
on the Web
Google Web Search
MSN Web Search
Yahoo! Web Search
in the News
Google News Search
Google News Archive Search
Yahoo! News Search
in the Blogs
BlawgSearch.com Search
Google Blog Search
Technorati Blog Search
in other Databases
Google Book Search
CHAPTER 1013
EDUCATIONAL FACILITIES
PART I
FUNCTIONS; DEPARTMENT OF EDUCATION (ss. 1013.01-1013.05)
PART II
USE AND MANAGEMENT OF
EDUCATIONAL FACILITIES (ss. 1013.10-1013.28)
PART III
PLANNING AND CONSTRUCTION
OF EDUCATIONAL FACILITIES (ss. 1013.30-1013.54)
PART IV
FUNDING FOR EDUCATIONAL FACILITIES (ss. 1013.60-1013.82)
PART I
FUNCTIONS; DEPARTMENT OF EDUCATION
1013.01 Definitions.
1013.02 Purpose; rules.
1013.03 Functions of the department.
1013.04 School district educational facilities plan performance and productivity standards; development; measurement; application.
1013.05 Office of Educational Facilities and SMART (Soundly Made, Accountable, Reasonable, and Thrifty) Schools Clearinghouse.
1013.01 Definitions.--The following terms shall be defined as follows for the purpose of this chapter:
(1) "Ancillary plant" is comprised of the building, site, and site improvements necessary to provide such facilities as vehicle maintenance, warehouses, maintenance, or administrative buildings necessary to provide support services to an educational program.
(2) "Auxiliary facility" means the spaces located at educational plants which are not designed for student occupant stations.
(3) "Board," unless otherwise specified, means a district school board, a community college board of trustees, a university board of trustees, and the Board of Trustees for the Florida School for the Deaf and the Blind. The term "board" does not include the State Board of Education.
(4) "Capital project," for the purpose of s. 9(a)(2), Art. XII of the State Constitution, as amended, means sums of money appropriated from the Public Education Capital Outlay and Debt Service Trust Fund to the state system of public education and other educational agencies as authorized by the Legislature.
(5) "Core facilities" means the media center, cafeteria, toilet facilities, and circulation space of an educational plant.
(6) "Educational facilities" means the buildings and equipment, structures, and special educational use areas that are built, installed, or established to serve primarily the educational purposes and secondarily the social and recreational purposes of the community and which may lawfully be used as authorized by the Florida Statutes and approved by boards.
(7) "Educational plant" comprises the educational facilities, site, and site improvements necessary to accommodate students, faculty, administrators, staff, and the activities of the educational program of each plant.
(8) "Educational plant survey" means a systematic study of present educational and ancillary plants and the determination of future needs to provide an appropriate educational program and services for each student based on projected capital outlay FTE's approved by the Department of Education.
(9) "Feasibility study" means the examination and analysis of information related to projected educational facilities to determine whether they are reasonable and possible.
(10) "Long-range planning" means devising a systematic method based on educational information and needs, carefully analyzed, to provide the facilities to meet the goals and objectives of the educational agency for a period of 5 years.
(11) "Low-energy usage features" means engineering features or devices that supplant or minimize the consumption of fossil fuels by heating equipment and cooling equipment. Such features may include, but are not limited to, high efficiency chillers and boilers, thermal storage tanks, solar energy systems, waste heat recovery systems, and facility load management systems.
(12) "Maintenance and repair" means the upkeep of educational and ancillary plants, including, but not limited to, roof or roofing replacement short of complete replacement of membrane or structure; repainting of interior or exterior surfaces; resurfacing of floors; repair or replacement of glass; repair of hardware, furniture, equipment, electrical fixtures, and plumbing fixtures; and repair or resurfacing of parking lots, roads, and walkways. The term "maintenance and repair" does not include custodial or groundskeeping functions, or renovation except for the replacement of equipment with new equipment of equal systems meeting current code requirements, provided that the replacement item neither places increased demand upon utilities services or structural supports nor adversely affects the function of safety to life systems.
(13) "Need determination" means the identification of types and amounts of educational facilities necessary to accommodate the educational programs, student population, faculty, administrators, staff, and auxiliary and ancillary services of an educational agency.
(14) "New construction" means any construction of a building or unit of a building in which the entire work is new or an entirely new addition connected to an existing building or which adds additional square footage to the space inventory.
(15) "Passive design elements" means architectural features that minimize heat gain, heat loss, and the use of heating and cooling equipment when ambient conditions are extreme and that permit use of the facility without heating or air-conditioning when ambient conditions are moderate. Such features may include, but are not limited to, building orientation, landscaping, earth bermings, insulation, thermal windows and doors, overhangs, skylights, thermal chimneys, and other design arrangements.
(16) "Public education capital outlay (PECO) funded projects" means site acquisition, renovation, remodeling, construction projects, and site improvements necessary to accommodate buildings, equipment, other structures, and special educational use areas that are built, installed, or established to serve primarily the educational instructional program of the district school board, community college board of trustees, or university board of trustees.
(17) "Remodeling" means the changing of existing facilities by rearrangement of spaces and their use and includes, but is not limited to, the conversion of two classrooms to a science laboratory or the conversion of a closed plan arrangement to an open plan configuration.
(18) "Renovation" means the rejuvenating or upgrading of existing facilities by installation or replacement of materials and equipment and includes, but is not limited to, interior or exterior reconditioning of facilities and spaces; air-conditioning, heating, or ventilating equipment; fire alarm systems; emergency lighting; electrical systems; and complete roofing or roof replacement, including replacement of membrane or structure. As used in this subsection, the term "materials" does not include instructional materials.
(19) "Satisfactory educational facility" means a facility that has been recommended for continued use by an educational plant survey or that has been classified as satisfactory in the state inventory of educational facilities.
(20) "Site" means a space of ground occupied or to be occupied by an educational facility or program.
(21) "Site development" means work that must be performed on an unimproved site in order to make it usable for the desired purpose or work incidental to new construction or to make an addition usable.
(22) "Site improvement" means work that must be performed on an existing site to improve its utilization, correct health and safety deficiencies, meet special program needs, or provide additional service areas.
(23) "Site improvement incident to construction" means the work that must be performed on a site as an accompaniment to the construction of an educational facility.
(24) "Satellite facility" means the buildings and equipment, structures, and special educational use areas that are built, installed, or established by private business or industry in accordance with chapter 6A-2, Florida Administrative Code, to be used exclusively for educational purposes to serve primarily the students of its employees and that are staffed professionally by the district school board.
History.--s. 797, ch. 2002-387.
1013.02 Purpose; rules.--
(1) The purpose of this chapter is to authorize state and local officials to cooperate in establishing and maintaining educational plants that will provide for public educational needs throughout the state.
(2) The State Board of Education shall adopt rules pursuant to ss. 120.536(1) and 120.54 to implement the provisions of this chapter.
History.--s. 798, ch. 2002-387.
1013.03 Functions of the department.--The functions of the Department of Education as it pertains to educational facilities shall include, but not be limited to, the following:
(1) Establish recommended minimum and maximum square footage standards for different functions and areas and procedures for determining the gross square footage for each educational facility to be funded in whole or in part by the state, including public broadcasting stations but excluding postsecondary special purpose laboratory space. The gross square footage determination standards may be exceeded when the core facility space of an educational facility is constructed or renovated to accommodate the future addition of classrooms to meet projected increases in student enrollment. The department shall encourage multiple use of facilities and spaces in educational plants.
(2) Establish, for the purpose of determining need, equitably uniform utilization standards for all types of like space, regardless of the level of education. These standards shall also establish, for postsecondary education classrooms, a minimum room utilization rate of 40 hours per week and a minimum station utilization rate of 60 percent. These rates shall be subject to increase based on national norms for utilization of postsecondary education classrooms.
(3) Require boards to submit other educational plant inventories data and statistical data or information relevant to construction, capital improvements, and related costs.
(4) Require each board and other appropriate agencies to submit complete and accurate financial data as to the amounts of funds from all sources that are available and spent for construction and capital improvements. The commissioner shall prescribe the format and the date for the submission of this data and any other educational facilities data. If any district does not submit the required educational facilities fiscal data by the prescribed date, the Commissioner of Education shall notify the district school board of this fact and, if appropriate action is not taken to immediately submit the required report, the district school board shall be directed to proceed pursuant to the provisions of s. 1001.42(11)(b). If any community college or university does not submit the required educational facilities fiscal data by the prescribed date, the same policy prescribed in this subsection for school districts shall be implemented.
(5) Administer, under the supervision of the Commissioner of Education, the Public Education Capital Outlay and Debt Service Trust Fund and the School District and Community College District Capital Outlay and Debt Service Trust Fund.
(6) Develop, review, update, revise, and recommend a mandatory portion of the Florida Building Code for educational facilities construction and capital improvement by community college boards and district school boards.
(7) Provide training, technical assistance, and building code interpretation for requirements of the mandatory Florida Building Code for the educational facilities construction and capital improvement programs of the community college boards and district school boards and, upon request, approve phase III construction documents for remodeling, renovation, or new construction of educational plants or ancillary facilities, except that university boards of trustees shall approve specifications and construction documents for their respective institutions. The Department of Management Services may, upon request, provide similar services for the Florida School for the Deaf and the Blind and shall use the Florida Building Code and the Florida Fire Prevention Code.
(8) Provide minimum criteria, procedures, and training to boards to conduct educational plant surveys and document the determination of future needs.
(9) Make available to boards technical assistance, awareness training, and research and technical publications relating to lifesafety, casualty, sanitation, environmental, maintenance, and custodial issues; and, as needed, technical assistance for survey, planning, design, construction, operation, and evaluation of educational and ancillary facilities and plants, facilities administrative procedures review, and training for new administrators.
(10)(a) Review and validate surveys proposed or amended by the boards and recommend to the Commissioner of Education, for approval, surveys that meet the requirements of this chapter.
1. The term "validate" as applied to surveys by school districts means to review inventory data as submitted to the department by district school boards; provide for review and inspection, where required, of student stations and aggregate square feet of inventory changed from satisfactory to unsatisfactory or changed from unsatisfactory to satisfactory; compare new school inventory to allocation limits provided by this chapter; review cost projections for conformity with cost limits set by s. 1013.64(6); compare total capital outlay full-time equivalent enrollment projections in the survey with the department's projections; review facilities lists to verify that student station and auxiliary facility space allocations do not exceed the limits provided by this chapter and related rules; review and confirm the application of uniform facility utilization factors, where provided by this chapter or related rules; utilize the documentation of programs offered per site, as submitted by the board, to analyze facility needs; confirm that need projections for career and adult educational programs comply with needs documented by the Office of Workforce and Economic Development; and confirm the assignment of full-time student stations to all space except auxiliary facilities, which, for purposes of exemption from student station assignment, include the following:
a. Cafeterias.
b. Multipurpose dining areas.
c. Media centers.
d. Auditoriums.
e. Administration.
f. Elementary, middle, and high school resource rooms, up to the number of such rooms recommended for the applicable occupant and space design capacity of the educational plant in the State Requirements for Educational Facilities, beyond which student stations must be assigned.
g. Elementary school skills labs, up to the number of such rooms recommended for the applicable occupant and space design capacity of the educational plant in the State Requirements for Educational Facilities, beyond which student stations must be assigned.
h. Elementary school art and music rooms.
2. The term "validate" as applied to surveys by community colleges and universities means to review and document the approval of each new site and official designation, where applicable; review the inventory database as submitted by each board to the department, including noncareer, and total capital outlay full-time equivalent enrollment projections per site and per college; provide for the review and inspection, where required, of student stations and aggregate square feet of space changed from satisfactory to unsatisfactory; utilize and review the documentation of programs offered per site submitted by the boards as accurate for analysis of space requirements and needs; confirm that needs projected for career and adult educational programs comply with needs documented by the Office of Workforce and Economic Development; compare new facility inventory to allocations limits as provided in this chapter; review cost projections for conformity with state averages or limits designated by this chapter; compare student enrollment projections in the survey to the department's projections; review facilities lists to verify that area allocations and space factors for generating space needs do not exceed the limits as provided by this chapter and related rules; confirm the application of facility utilization factors as provided by this chapter and related rules; and review, as submitted, documentation of how survey recommendations will implement the detail of current campus master plans and integrate with local comprehensive plans and development regulations.
(b) Recommend priority of projects to be funded for approval by the state board, when required by law.
(11) Prepare the commissioner's comprehensive fixed capital outlay legislative budget request and provide annually an estimate of the funds available for developing required 3-year priority lists. This amount shall be based upon the average percentage for the 5 prior years of funds appropriated by the Legislature for fixed capital outlay to each level of public education: public schools, community colleges, and universities.
(12) Perform any other functions that may be involved in educational facilities construction and capital improvement which shall ensure that the intent of the Legislature is implemented.
(13) By October 1, 2003, review all rules related to school construction to identify requirements that are outdated, obsolete, unnecessary, or otherwise could be amended in order to provide additional flexibility to school districts to comply with the constitutional class size maximums described in s. 1003.03(1) and make recommendations concerning such rules to the State Board of Education. The State Board of Education shall act on such recommendations by December 31, 2003.
History.--s. 799, ch. 2002-387; s. 17, ch. 2003-391; s. 135, ch. 2004-357.
1013.04 School district educational facilities plan performance and productivity standards; development; measurement; application.--
(1) The Office of Educational Facilities and SMART Schools Clearinghouse shall develop and adopt measures for evaluating the performance and productivity of school district educational facilities plans. The measures may be both quantitative and qualitative and must, to the maximum extent practical, assess those factors that are within the districts' control. The measures must, at a minimum, assess performance in the following areas:
(a) Frugal production of high-quality projects.
(b) Efficient finance and administration.
(c) Optimal school and classroom size and utilization rate.
(d) Safety.
(e) Core facility space needs and cost-effective capacity improvements that consider demographic projections.
(f) Level of district local effort.
(2) The office shall establish annual performance objectives and standards that can be used to evaluate district performance and productivity.
(3) The office shall conduct ongoing evaluations of district educational facilities program performance and productivity, using the measures adopted under this section. If, using these measures, the office finds that a district failed to perform satisfactorily, the office must recommend to the district school board actions to be taken to improve the district's performance.
History.--s. 25, ch. 2002-296; s. 800, ch. 2002-387.
1013.05 Office of Educational Facilities and SMART (Soundly Made, Accountable, Reasonable, and Thrifty) Schools Clearinghouse.--
(1) The SMART Schools Clearinghouse is established to assist school districts that seek to access School Infrastructure Thrift (SIT) Program awards pursuant to ss. 1013.42 and 1013.72 or effort index grants pursuant to s. 1013.73. The office must use expedited procedures in providing such assistance.
(2) The office shall prioritize school district SIT Program awards based on a review of the district facilities work programs and proposed construction projects.
History.--s. 801, ch. 2002-387.
PART II
USE AND MANAGEMENT
OF EDUCATIONAL FACILITIES
1013.10 Use of buildings and grounds.
1013.11 Postsecondary institutions assessment of physical plant safety.
1013.12 Casualty, safety, sanitation, and firesafety standards and inspection of property.
1013.13 Coordination of school safety information; construction design documents.
1013.14 Proposed purchase of real property by a board; confidentiality of records; procedure.
1013.15 Lease, rental, and lease-purchase of educational facilities and sites.
1013.16 Construction of facilities on leased property; conditions.
1013.17 University leasing in affiliated research and development park.
1013.171 University lease agreements; land, facilities.
1013.18 Radio and television facilities.
1013.19 Purchase, conveyance, or encumbrance of property interests above surface of land; joint-occupancy structures.
1013.20 Standards for relocatables used as classroom space; inspections.
1013.21 Reduction of relocatable facilities in use.
1013.22 Obscenity on educational buildings or vehicles.
1013.23 Energy efficiency contracting.
1013.24 Right of eminent domain.
1013.25 When university or community college board of trustees may exercise power of eminent domain.
1013.26 Department of Legal Affairs to represent university board in condemnation proceedings.
1013.27 Purchase of land by municipality.
1013.28 Disposal of property.
1013.10 Use of buildings and grounds.--The board may permit the use of educational facilities and grounds for any legal assembly or for community use centers or may permit the same to be used as voting places in any primary, regular, or special election. The board shall adopt rules or policies and procedures necessary to protect educational facilities and grounds when used for such purposes.
History.--s. 803, ch. 2002-387.
1013.11 Postsecondary institutions assessment of physical plant safety.--The president of each postsecondary institution shall conduct or cause to be conducted an annual assessment of physical plant safety. An annual report shall incorporate the findings obtained through such assessment and recommendations for the improvement of safety on each campus. The annual report shall be submitted to the respective governing or licensing board of jurisdiction no later than January 1 of each year. Each board shall compile the individual institutional reports and convey the aggregate institutional reports to the Commissioner of Education. The Commissioner of Education shall convey these reports and the reports required in s. 1008.48 to the President of the Senate and the Speaker of the House of Representatives no later than March 1 of each year.
History.--s. 804, ch. 2002-387.
1013.12 Casualty, safety, sanitation, and firesafety standards and inspection of property.--The State Board of Education shall adopt and administer rules prescribing standards for the safety and health of occupants of educational and ancillary plants as a part of State Requirements for Educational Facilities or the Florida Building Code for educational facilities construction as provided in s. 1013.37, except that the State Fire Marshal in consultation with the Department of Education shall adopt uniform firesafety standards for educational and ancillary plants and educational facilities, as provided in s. 633.022(1)(b), and a firesafety evaluation system to be used as an alternate firesafety inspection standard for existing educational and ancillary plants and educational facilities. The uniform firesafety standards and the alternate firesafety evaluation system shall be administered and enforced by local fire officials. These standards must be used by all public agencies when inspecting public educational and ancillary plants, and the firesafety standards must be used by local fire officials when performing firesafety inspections of public educational and ancillary plants and educational facilities. In accordance with such standards, each board shall prescribe policies and procedures establishing a comprehensive program of safety and sanitation for the protection of occupants of public educational and ancillary plants. Such policies must contain procedures for periodic inspections as prescribed herein and for withdrawal of any educational and ancillary plant, or portion thereof, from use until unsafe or unsanitary conditions are corrected or removed.
(1) PERIODIC INSPECTION OF PROPERTY BY DISTRICT SCHOOL BOARDS.--
(a) Each board shall provide for periodic inspection, other than firesafety inspection, of each educational and ancillary plant at least once during each fiscal year to determine compliance with standards of sanitation and casualty safety prescribed in the rules of the State Board of Education.
(b) Firesafety inspections of each educational and ancillary plant must be made annually by persons certified by the Division of State Fire Marshal to be eligible to conduct firesafety inspections in public educational and ancillary plants. The board shall submit a copy of the firesafety inspection report to the State Fire Marshal and, if there is a local fire official who conducts firesafety inspections, to the local fire official.
(c) In each firesafety inspection report, the board shall include a plan of action and a schedule for the correction of each deficiency which have been formulated in consultation with the local fire control authority. If immediate life-threatening deficiencies are noted in any inspection, the board shall either take action to promptly correct the deficiencies or withdraw the educational or ancillary plant from use until such time as the deficiencies are corrected.
(2) INSPECTION OF EDUCATIONAL PROPERTY BY OTHER PUBLIC AGENCIES.--
(a) A safety or sanitation inspection of any educational or ancillary plant may be made at any time by the Department of Education or any other state or local agency authorized or required to conduct such inspections by either general or special law. Each agency conducting inspections shall use the standards adopted by the Commissioner of Education in lieu of, and to the exclusion of, any other inspection standards prescribed either by statute or administrative rule. The agency shall submit a copy of the inspection report to the board.
(b) One firesafety inspection of each educational or ancillary plant must be conducted each fiscal year by the county, municipality, or special fire control district in which the plant is located using the standards adopted by the State Fire Marshal. The board shall cooperate with the inspecting authority when a firesafety inspection is made by a governmental authority under this paragraph.
(c) In each firesafety inspection report, the local fire official in conjunction with the board shall include a plan of action and a schedule for the correction of each deficiency. If immediate life-threatening deficiencies are noted in any inspection, the local fire official shall either take action to require the board to promptly correct the deficiencies or withdraw the educational facility from use until the deficiencies are corrected, subject to review by the State Fire Marshal who shall act within 10 days to ensure that the deficiencies are corrected or withdraw the facility from use.
(3) CORRECTIVE ACTION; DEFICIENCIES OTHER THAN FIRESAFETY DEFICIENCIES.--Upon failure of the board to take corrective action within a reasonable time, the agency making the inspection, other than a local fire official, may request the commissioner to:
(a) Order that appropriate action be taken to correct all deficiencies in accordance with a schedule determined jointly by the inspecting authority and the board; in developing the schedule, consideration must be given to the seriousness of the deficiencies and the ability of the board to obtain the necessary funds; or
(b) After 30 calendar days' notice to the board, order all or a portion of the educational or ancillary plant withdrawn from use until the deficiencies are corrected.
(4) INSPECTIONS OF PUBLIC POSTSECONDARY EDUCATION FACILITIES.--Firesafety inspections of community college and university facilities shall comply with State Board of Education rules.
(5) CORRECTIVE ACTION; FIRESAFETY DEFICIENCIES.--Upon failure of the board to take corrective action within the time designated in the plan of action to correct any firesafety deficiency noted under paragraph (1)(c) or paragraph (2)(c), the local fire official shall immediately report the deficiency to the State Fire Marshal, who shall have enforcement authority with respect to educational and ancillary plants and educational facilities as provided in chapter 633 for any other building or structure.
(6) ADDITIONAL STANDARDS.--In addition to any other rules adopted under this section or s. 633.022, the State Fire Marshal in consultation with the Department of Education shall adopt and administer rules prescribing the following standards for the safety and health of occupants of educational and ancillary plants:
(a) The designation of serious life-safety hazards, including, but not limited to, nonfunctional fire alarm systems, nonfunctional fire sprinkler systems, doors with padlocks or other locks or devices that preclude egress at any time, inadequate exits, hazardous electrical system conditions, potential structural failure, and storage conditions that create a fire hazard.
(b) The proper placement of functional smoke and heat detectors and accessible, unexpired fire extinguishers.
(c) The maintenance of fire doors without doorstops or wedges improperly holding them open.
(7) ANNUAL REPORT.--The State Fire Marshal shall publish an annual report to be filed with the substantive committees of the state House of Representatives and Senate having jurisdiction over education, the Commissioner of Education or his or her successor, and the Governor documenting the status of each board's firesafety program, including the improvement or lack thereof.
History.--s. 1, ch. 2002-287; s. 805, ch. 2002-387; s. 4, ch. 2003-3.
1013.13 Coordination of school safety information; construction design documents.--
(1) Each district school superintendent must provide to the law enforcement agency and fire department that has jurisdiction over each educational facility a copy of the floor plans and other relevant documents for each educational facility in the district, as defined in s. 1013.01. After the initial submission of the floor plans and other relevant documents, the district superintendent of schools shall submit, by October 1 of each year, revised floor plans and other relevant documents for each educational facility in the district that was modified during the preceding year.
(2) Each community college president must provide to the law enforcement agency and fire department that has jurisdiction over the community college a copy of the floor plans and other relevant documents for each educational facility as defined in s. 1013.01. After the initial submission of the floor plans and other relevant documents, the community college president shall submit, by October 1 of each year, revised floor plans and other relevant documents for each educational facility that was modified during the preceding year.
History.--s. 806, ch. 2002-387.
1013.14 Proposed purchase of real property by a board; confidentiality of records; procedure.--
(1)(a) In any case in which a board, pursuant to the provisions of this chapter, seeks to acquire by purchase any real property for educational purposes, every appraisal, offer, or counteroffer must be in writing and is exempt from the provisions of s. 119.07(1) until an option contract is executed or, if no option contract is executed, until 30 days before a contract or agreement for purchase is considered for approval by the board. If a contract or agreement for purchase is not submitted to the board for approval, the exemption from s. 119.07(1) shall expire 30 days after the termination of negotiations. The board shall maintain complete and accurate records of every such appraisal, offer, and counteroffer. For the purposes of this section, the term "option contract" means an agreement by the board to purchase a piece of property, subject to the approval of the board at a public meeting after 30 days' public notice.
(b) Prior to acquisition of the property, the board shall obtain at least one appraisal by an appraiser approved pursuant to s. 253.025(6)(b) for each purchase in an amount greater than $100,000 and not more than $500,000. For each purchase in an amount in excess of $500,000, the board shall obtain at least two appraisals by appraisers approved pursuant to s. 253.025(6)(b). If the agreed to purchase price exceeds the average appraised value, the board is required to approve the purchase by an extraordinary vote.
(2) Nothing in this section shall be interpreted as providing an exemption from, or an exception to, s. 286.011.
History.--s. 807, ch. 2002-387.
1013.15 Lease, rental, and lease-purchase of educational facilities and sites.--
(1) A board may lease any land, facilities, or educational plants owned by it to any person or entity for such term, for such rent, and upon such terms and conditions as the board determines to be in its best interests; any such lease may provide for the optional or binding purchase of the land, facilities, or educational plants by the lessee upon such terms and conditions as the board determines are in its best interests. A determination that any such land, facility, or educational plant so leased is unnecessary for educational purposes is not a prerequisite to the leasing or lease-purchase of such land, facility, or educational plant. Prior to entering into or executing any such lease, a board shall consider approval of the lease or lease-purchase agreement at a public meeting, at which a copy of the proposed agreement in its final form shall be available for inspection and review by the public, after due notice as required by law.
(2)(a) A district school board may rent or lease educational facilities and sites as defined in s. 1013.01. Educational facilities and sites rented or leased for 1 year or less shall be funded through the operations budget or funds derived from millage proceeds pursuant to s. 1011.71(2). A lease contract for 1 year or less, when extended or renewed beyond a year, becomes a multiple-year lease. Operational funds or funds derived from millage proceeds pursuant to s. 1011.71(2) may be authorized to be expended for multiple-year leases. All leased facilities and sites must be inspected prior to occupancy by the authority having jurisdiction.
1. All newly leased spaces must be inspected and brought into compliance with the Florida Building Code pursuant to chapter 553 and the life safety codes pursuant to chapter 633, prior to occupancy, using the board's operations budget or funds derived from millage proceeds pursuant to s. 1011.71(2).
2. Plans for renovation or remodeling of leased space shall conform to the Florida Building Code and the Florida Fire Prevention Code for educational occupancies or other occupancies, as appropriate and as required in chapters 553 and 633, prior to occupancy.
3. All leased facilities must be inspected annually for firesafety deficiencies in accordance with the applicable code and have corrections made in accordance with s. 1013.12. Operational funds or funds derived from millage proceeds pursuant to s. 1011.71(2) may be used to correct deficiencies in leased space.
4. When the board declares that a public emergency exists, it may take up to 30 days to bring the leased facility into compliance with the requirements of State Board of Education rules.
(b) A board is authorized to lease-purchase educational facilities and sites as defined in s. 1013.01. The lease-purchase of educational facilities and sites shall be as required by s. 1013.37, shall be advertised for and receive competitive proposals and be awarded to the best proposer, and shall be funded using current or other funds specifically authorized by law to be used for such purpose.
1. A district school board, by itself, or through a direct-support organization formed pursuant to s. 1001.453 or nonprofit educational organization or a consortium of district school boards, may, in developing a lease-purchase of educational facilities and sites provide for separately advertising for and receiving competitive bids or proposals on the construction of facilities and the selection of financing to provide the lowest cost funding available, so long as the board determines that such process would best serve the public interest and the pledged revenues are limited to those authorized in s. 1011.71(2)(e).
2. All activities and information, including lists of individual participants, associated with agreements made pursuant to this section shall be subject to the provisions of chapter 119 and s. 286.011.
(c)1. The term of any lease-purchase agreement, including the initial term and any subsequent renewals, shall not exceed the useful life of the educational facilities and sites for which the agreement is made, or 30 years, whichever is less.
2. The initial term or any renewal term of any lease-purchase agreement shall expire on June 30 of each fiscal year, but may be automatically renewed annually, subject to a board making sufficient annual appropriations therefor. Under no circumstances shall the failure of a board to renew a lease-purchase agreement constitute a default or require payment of any penalty or in any way limit the right of a board to purchase or utilize educational facilities and sites similar in function to the educational facilities and sites that are the subject of the said lease-purchase agreement. Educational facilities and sites being acquired pursuant to a lease-purchase agreement shall be exempt from ad valorem taxation.
3. No lease-purchase agreement entered into pursuant to this subsection shall constitute a debt, liability, or obligation of the state or a board or shall be a pledge of the faith and credit of the state or a board.
4. Any lease-purchase agreement entered into pursuant to this subsection shall stipulate an annual rate which may consist of a principal component and an interest component, provided that the maximum interest rate of any interest component payable under any such lease-purchase agreement, or any participation or certificated portion thereof, shall be calculated in accordance with and be governed by the provisions of s. 215.84.
(3) Lease agreements entered into by university boards of trustees shall comply with the provisions of s. 1013.171.
(4)(a) A board may rent or lease existing buildings, or space within existing buildings, originally constructed or used for purposes other than education, for conversion to use as educational facilities. Such buildings rented or leased for 1 year or less shall be funded through the operations budget or funds derived from millage pursuant to s. 1011.71(2). A rental agreement or lease contract for 1 year or less, when extended or renewed beyond a year, becomes a multiple-year rental or lease. Operational funds or funds derived from millage proceeds pursuant to s. 1011.71(2) may be authorized to be expended for multiple-year rentals or leases. Notwithstanding any other provisions of this section, if a building was constructed in conformance with all applicable building and life safety codes, it shall be deemed to meet the requirements for use and occupancy as an educational facility subject only to the provisions of this subsection.
(b) Prior to occupying a rented or a leased existing building, or space within an existing building, pursuant to this subsection, a school board shall, in a public meeting, adopt a resolution certifying that the following circumstances apply to the building proposed for occupancy:
1. Growth among the school-age population in the school district has created a need for new educational facilities in a neighborhood where there is little or no vacant land.
2. There exists a supply of vacant space in existing buildings that meet state minimum building and life safety codes.
3. Acquisition and conversion to use as educational facilities of an existing building or buildings is a cost-saving means of providing the needed classroom space as determined by the difference between the cost of new construction, including land acquisition and preparation and, if applicable, demolition of existing structures, and the cost of acquisition through rental or lease and conversion of an existing building or buildings.
4. The building has been examined for suitability, safety, and conformance with state minimum building and life safety codes. The building examination shall consist, at a minimum, of a review of existing documents, building site reconnaissance, and analysis of the building conducted by, or under the responsible charge of, a licensed structural engineer.
5. A certificate of evaluation has been issued by an appropriately licensed design professional which states that, based on available documents, building site reconnaissance, current knowledge, and design judgment in the professional's opinion, the building meets the requirements of state minimum building and life safety codes, provides safe egress of occupants from the building, provides adequate firesafety, and does not pose a substantial threat to life to persons who would occupy the building for classroom use.
6. The plans for conversion of the building were prepared by an appropriate design professional licensed in this state and the work of conversion was performed by contractors licensed in this state.
7. The conversion of the building was observed by an appropriate design professional licensed in this state.
8. The building has been reviewed, inspected, and granted a certificate of occupancy by the local building department.
9. All ceilings, light fixtures, ducts, and registers within the area to be occupied for classroom purposes were constructed or have been reconstructed to meet state minimum requirements.
History.--s. 808, ch. 2002-387.
1013.16 Construction of facilities on leased property; conditions.--
(1) A board may construct or place educational facilities and ancillary facilities on land that is owned by any person after the board has acquired from the owner of the land a long-term lease for the use of this land for a period of not less than 40 years or the life expectancy of the permanent facilities constructed thereon, whichever is longer.
(2) A board may enter into a short-term lease for the use of land owned by any person on which temporary or relocatable facilities are to be utilized.
History.--s. 809, ch. 2002-387.
1013.17 University leasing in affiliated research and development park.--A university is exempt from the requirements of s. 255.25(3), (4), and (8) when leasing educational facilities in a research and development park with which the university is affiliated and when the State Board of Education certifies in writing that the leasing of said educational facilities is in the best interests of the university and that the exemption from competitive bid requirements would not be detrimental to the state.
History.--s. 810, ch. 2002-387.
1013.171 University lease agreements; land, facilities.--
(1) Each university is authorized to negotiate and enter into agreements to lease land under its jurisdiction to for-profit and nonprofit corporations, registered by the Secretary of State to do business in this state, for the purpose of erecting thereon facilities and accommodations necessary and desirable to serve the needs and purposes of the university, as determined by the systemwide strategic plan adopted by the State Board of Education. Such agreement will be for a term not in excess of 99 years or the life expectancy of the permanent facilities constructed thereon, whichever is shorter, and shall include as a part of the consideration provisions for the eventual ownership of the completed facilities by the state. The Board of Trustees of the Internal Improvement Trust Fund upon request of the university shall lease any such property to the university for sublease as heretofore provided.
(2) Each university board of trustees is authorized to enter into agreements with for-profit and nonprofit corporations, registered by the Secretary of State to do business in this state, whereby income-producing buildings, improvements, and facilities necessary and desirable to serve the needs and purposes of the university, as determined by the systemwide strategic plan adopted by the State Board of Education, are acquired by purchase or lease-purchase by the university. When such agreements provide for lease-purchase of facilities erected on land that is not under the jurisdiction of the university, the agreement shall include as a part of the consideration provisions for the eventual ownership of the land and facility by the state. Agreements for lease-purchase shall not exceed 30 years or the life expectancy of the permanent facility constructed, whichever is shorter. Notwithstanding the provisions of any other law, the university board of trustees may enter into an agreement for the lease-purchase of a facility under this section for a term greater than 1 year. Each university board of trustees is authorized to use any auxiliary trust funds, available and not otherwise obligated, to pay rent to the owner should income from the facilities not be sufficient in any debt payment period. The trust funds used for payment of rent shall be reimbursed as soon as possible to the extent that income from the facilities exceeds the amount necessary for such debt payment.
(3) Each university board of trustees may:
(a) Construct educational facilities on land that is owned by a direct-support organization, as defined in s. 1004.28, or a governmental agency at the federal, state, county, or municipal level, if the university has acquired a long-term lease for the use of the land. The lease must be for at least 40 years or the expected time the facilities to be constructed on the land are expected to remain in a condition acceptable for use, whichever is longer.
(b) Acquire a short-term lease from one of the entities listed in paragraph (a) for the use of land, if adequate temporary or relocatable facilities are available on the land.
(c) Enter into a short-term lease for the use of land and buildings upon which capital improvements may be made.
If sufficient land is not available from any of the entities listed in paragraph (a), a university may acquire a short-term lease from a private landowner or developer.
(4) Agreements as provided in this section shall be entered into with an offeror resulting from publicly announced competitive bids or proposals, except that the university may enter into an agreement with an entity enumerated in paragraph (3)(a) for leasing land or with a direct-support organization as provided in s. 1004.28, which shall enter into subsequent agreements for financing and constructing the project after receiving competitive bids or proposals. Any facility constructed, lease-purchased, or purchased under such agreements, whether erected on land under the jurisdiction of the university or not, shall conform to the construction standards and codes applicable to university facilities. Each university board of trustees shall adopt such rules as are necessary to carry out its duties and responsibilities imposed by this section.
(5) Agreements executed by the State Board of Education prior to January 1, 1980, for the purposes listed herein shall be validated, and said board's capacity to act in such cases ratified and confirmed.
History.--s. 811, ch. 2002-387.
1013.18 Radio and television facilities.--
(1) A board may acquire, by purchase, license, permanent easement, or gift, suitable lands and other facilities, either within or without the boundaries of the district, for use in providing educational radio or television transmitting sites and may erect such buildings, antennas, transmission equipment, towers, or other structures as are necessary to accomplish the purposes of this section.
(2) Fixed capital outlay budget requests for public broadcasting stations and instructional television and radio facilities shall be submitted pursuant to s. 1013.60. The commissioner may include any recommendations for these purposes in the legislative budget request for fixed capital outlay.
History.--s. 812, ch. 2002-387.
1013.19 Purchase, conveyance, or encumbrance of property interests above surface of land; joint-occupancy structures.--For the purpose of implementing jointly financed construction project agreements, or for the construction of combined occupancy structures, any board may purchase, own, convey, sell, lease, or encumber airspace or any other interests in property above the surface of the land, provided the lease of airspace for nonpublic use is for such reasonable rent, length of term, and conditions as the board in its discretion may determine. All proceeds from such sale or lease shall be used by the board or boards receiving the proceeds solely for fixed capital outlay purposes. These purposes may include the renovation or remodeling of existing facilities owned by the board or the construction of new facilities; however, for a community college board or university board, such new facility must be authorized by the Legislature. It is declared that the use of such rental by the board for public purposes in accordance with its statutory authority is a public use. Airspace or any other interest in property held by the Board of Trustees of the Internal Improvement Trust Fund or the State Board of Education may not be divested or conveyed without approval of the respective board. Any building, including any building or facility component that is common to both nonpublic and educational portions thereof, constructed in airspace that is sold or leased for nonpublic use pursuant to this section is subject to all applicable state, county, and municipal regulations pertaining to land use, zoning, construction of buildings, fire protection, health, and safety to the same extent and in the same manner as such regulations would be applicable to the construction of a building for nonpublic use on the appurtenant land beneath the subject airspace. Any educational facility constructed or leased as a part of a joint-occupancy facility is subject to all rules and requirements of the respective boards or departments having jurisdiction over educational facilities.
History.--s. 813, ch. 2002-387.
1013.20 Standards for relocatables used as classroom space; inspections.--
(1) The State Board of Education shall adopt rules establishing standards for relocatables intended for long-term use as classroom space at a public elementary school, middle school, or high school. "Long-term use" means the use of relocatables at the same educational plant for a period of 4 years or more. Each relocatable acquired by a district school board after the effective date of the rules and intended for long-term use must comply with the standards. District school boards shall submit a plan for the use of existing relocatables within the 5-year work program to be reviewed and approved by the commissioner by January 1, 2003. A progress report shall be provided by the commissioner to the Speaker of the House of Representatives and the President of the Senate each January thereafter. Relocatables that fail to meet the standards after completion of the approved plan may not be used as classrooms. The standards shall protect the health, safety, and welfare of occupants by requiring compliance with the Florida Building Code or the State Requirements for Educational Facilities for existing relocatables, as applicable, to ensure the safety and stability of construction and onsite installation; fire and moisture protection; air quality and ventilation; appropriate wind resistance; and compliance with the requirements of the Americans with Disabilities Act of 1990. If appropriate and where relocatables are not scheduled for replacement, the standards must also require relocatables to provide access to the same technologies available to similar classrooms within the main school facility and, if appropriate, and where relocatables are not scheduled for replacement, to be accessible by adequate covered walkways. A relocatable that is subject to this section and does not meet the standards shall not be reported as providing satisfactory student stations in the Florida Inventory of School Houses.
(2) Annual inspections for all satisfactory relocatables designed for classroom use or being occupied by students are required for: foundations; tie-downs; structural integrity; weatherproofing; HVAC; electrical; plumbing, if applicable; firesafety; and accessibility. Reports shall be filed with the district school board and posted in each respective relocatable in order to facilitate corrective action.
History.--s. 814, ch. 2002-387.
1013.21 Reduction of relocatable facilities in use.--
(1)(a) It is a goal of the Legislature that all school districts shall provide a quality educational environment for their students such that, by July 1, 2003, student stations in relocatable facilities exceeding 20 years of age and in use by a district during the 1998-1999 fiscal year shall be removed and the number of all other relocatable student stations at over-capacity schools during that fiscal year shall be decreased by half. The Legislature finds, however, that necessary maintenance of existing facilities and public school enrollment growth impair the ability of some districts to achieve the goal of this section within 5 years. Therefore, the Legislature is increasing its commitment to school funding in this act, in part to help districts reduce the number of temporary, relocatable student stations at over-capacity schools. The Legislature intends that local school districts also increase their investment toward meeting this goal. Each district's progress toward meeting this goal shall be measured annually by comparing district facilities work programs for replacing relocatables with the state capital outlay projections for education prepared by the Office of Educational Facilities and SMART Schools Clearinghouse. District facilities work programs shall be monitored by the SMART Schools Clearinghouse to measure the commitment of local school districts toward this goal.
(b) For the purposes of this section, an "over-capacity school" means a school the capital outlay FTE enrollment of which exceeds 100 percent of the space and occupant design capacity of its nonrelocatable facilities. However, if a school's initial design incorporated relocatable or modular instructional space, an "over-capacity school" shall mean a school the capital outlay FTE enrollment of which exceeds 100 percent of the space and occupant design capacity of its core facilities.
(2) In accordance with the legislative goal described in subsection (1), any relocatables purchased with money appropriated pursuant to chapter 97-384, Laws of Florida, shall be counted at actual student capacity for purposes of s. 1013.31 for the life cycle of the relocatable.
History.--s. 815, ch. 2002-387.
1013.22 Obscenity on educational buildings or vehicles.--Whoever willfully cuts, paints, pastes, marks, or defaces by writing or in any other manner any educational building, furniture, apparatus, appliance, outbuilding, ground, fence, tree, post, vehicle, or other educational property with an obscene word, image, or device commits a misdemeanor of the second degree, punishable as provided in s. 775.082 or s. 775.083. This section shall not apply to any student in grades K-12 subject to the discipline of a district school board.
History.--s. 816, ch. 2002-387.
1013.23 Energy efficiency contracting.--
(1) LEGISLATIVE INTENT.--The Legislature finds that investment in energy conservation measures in educational facilities can reduce the amount of energy consumed and produce immediate and long-term savings. It is the policy of this state to encourage school districts, community colleges, and state universities to invest in energy conservation measures that reduce energy consumption, produce a cost savings, and improve the quality of indoor air in facilities, and, when economically feasible, to build, operate, maintain, or renovate educational facilities in such a manner so as to minimize energy consumption and maximize energy savings. It is further the policy of this state to encourage school districts, community colleges, and state universities to reinvest any energy savings resulting from energy conservation measures into additional energy conservation efforts.
(2) DEFINITIONS.--For purposes of this section, the term:
(a) "Energy conservation measure" means a training program, facility alteration, or equipment to be used in new construction, including an addition to an existing facility, that reduces energy costs, and includes, but is not limited to:
1. Insulation of the facility structure and systems within the facility.
2. Storm windows and doors, caulking or weatherstripping, multiglazed windows and doors, heat-absorbing, or heat-reflective, glazed and coated window and door systems, additional glazing, reductions in glass area, and other window and door system modifications that reduce energy consumption.
3. Automatic energy control systems.
4. Heating, ventilating, or air-conditioning system modifications or replacements.
5. Replacement or modifications of lighting fixtures to increase the energy efficiency of the lighting system which, at a minimum, shall conform to the Florida Building Code.
6. Energy recovery systems.
7. Cogeneration systems that produce steam or forms of energy such as heat, as well as electricity, for use primarily within a facility or complex of facilities.
8. Energy conservation measures that provide long-term operating cost reductions and significantly reduce Btu consumed.
9. Renewable energy systems, such as solar, biomass, and wind.
10. Devices which reduce water consumption or sewer charges.
(b) "Energy cost savings" means:
1. A measured reduction in fuel, energy, or operation and maintenance costs created from the implementation of one or more energy conservation measures when compared with an established baseline for previous fuel, energy, or operation and maintenance costs; or
2. For new construction, a projected reduction in fuel, energy, or operation and maintenance costs created from the implementation of one or more energy conservation measures when compared with the projected fuel, energy, or operation and maintenance costs for equipment if the minimum standards of the Florida Building Code for educational facilities construction were implemented and signed and sealed by a registered professional engineer.
(c) "Energy performance-based contract" means a contract for the evaluation, recommendation, and implementation of energy conservation measures which includes, at a minimum:
1. The design and installation of equipment to implement one or more of such measures, and, if applicable, operation and maintenance of such measures.
2. The amount of any actual annual savings. This amount must meet or exceed total annual contract payments made by the district school board, community college board of trustees, or state university board of trustees for such contract.
3. Financing charges to be incurred by the district school board, community college board of trustees, or state university board of trustees over the life of the contract.
(d) "Energy performance contractor" means a person or business licensed pursuant to chapter 471, chapter 481, or chapter 489 and experienced in the analysis, design, implementation, and installation of energy conservation measures through the implementation of energy performance-based contracts.
(3) ENERGY PERFORMANCE-BASED CONTRACT PROCEDURES.--
(a) A district school board, community college board of trustees, or state university board of trustees may enter into an energy performance-based contract with an energy performance contractor to significantly reduce energy or operating costs of an educational facility through one or more energy conservation measures.
(b) The energy performance contractor shall be selected in compliance with s. 287.055; except that in a case where a district school board, community college board of trustees, or state university board of trustees determines that fewer than three firms are qualified to perform the required services, the requirement for agency selection of three firms, as provided in s. 287.055(4)(b), shall not apply and the bid requirements of s. 287.057 shall not apply.
(c) Before entering into a contract pursuant to this section, the district school board, community college board of trustees, or state university board of trustees shall provide published notice of the meeting in which it proposes to award the contract, the names of the parties to the proposed contract, and the contract's purpose.
(d) Prior to the design and installation of the energy conservation measure, the district school board, community college board of trustees, or state university board of trustees must obtain from the energy performance contractor a report that discloses all costs associated with the energy conservation measure and provides an estimate of the amount of the energy cost savings. The report must be reviewed by either the Department of Education or the Department of Management Services or signed and sealed by a registered professional engineer.
(e) A district school board, community college board of trustees, or state university board of trustees may enter into an energy performance-based contract with an energy performance contractor if, after review of the report required by paragraph (d), it finds that the amount it would spend on the energy conservation measures recommended in the report will not exceed the amount to be saved in energy and operation costs over 20 years from the date of installation, based on life-cycle costing calculations, if the recommendations in the report were followed and if the energy performance contractor provides a written guarantee that the energy or operating cost savings will meet or exceed the costs of the system. The contract may provide for payments over a period of time not to exceed 20 years.
(f) A district school board, community college board of trustees, or state university board of trustees may enter into an installment payment contract for the purchase and installation of energy conservation measures. The contract shall provide for payments of not less than one-twentieth of the price to be paid within 2 years from the date of the complete installation and acceptance by the district school board, community college board of trustees, or state university board of trustees, and the remaining costs to be paid at least quarterly, not to exceed a 20-year term based on life-cycle costing calculations.
(g) Energy performance-based contracts may extend beyond the fiscal year in which they become effective; however, the term of any contract shall expire at the end of each fiscal year and may be automatically renewed annually up to 20 years, subject to a district school board, community college board of trustees, or state university board of trustees making sufficient annual appropriations based upon continued realized energy cost savings. Such contracts shall stipulate that the agreement does not constitute a debt, liability, or obligation of the state or a district school board, community college board of trustees, or state university board of trustees, or a pledge of the faith and credit of the state or a district school board, community college board of trustees, or state university board of trustees.
(4) CONTRACT PROVISIONS.--
(a) An energy performance-based contract shall include a guarantee by the energy performance contractor that annual energy cost savings will meet or exceed the amortized cost of energy conservation measures.
(b) The contract shall provide that all payments, except obligations on termination of the contract before its expiration, are to be made over time, but not to exceed 20 years from the date of complete installation and acceptance by the district school board, community college board of trustees, or state university board of trustees, and that the annual savings are guaranteed to the extent necessary to make annual payments to satisfy the contract.
(c) The contract must require that the energy performance contractor to whom the contract is awarded provide a 100-percent public construction bond to the district school board, community college board of trustees, or state university board of trustees for its faithful performance, as required by s. 255.05.
(d) The contract shall require the energy performance contractor to provide to the district school board, community college board of trustees, or state university board of trustees an annual reconciliation of the guaranteed energy cost savings. The energy performance contractor shall be liable for any annual savings shortfall which may occur. In the event that such reconciliation reveals an excess in annual energy cost savings, such excess savings shall not be used to cover potential energy cost savings shortages in subsequent contract years.
History.--s. 817, ch. 2002-387.
1013.24 Right of eminent domain.--There is conferred upon the district school boards in the state the authority and right to take private property for any public school purpose or use when, in the opinion of the school board, such property is needed in the operation of any or all of the public schools within the district, including property needed for any school purpose or use in any school district or districts within the county. The absolute fee simple title to all property so taken and acquired shall vest in the district school board, unless the school board seeks to appropriate a particular right or estate in such property.
History.--s. 818, ch. 2002-387.
1013.25 When university or community college board of trustees may exercise power of eminent domain.--Whenever it becomes necessary for the welfare and convenience of any of its institutions or divisions to acquire private property for the use of such institutions, and this cannot be acquired by agreement satisfactory to a university or community college board of trustees and the parties interested in, or the owners of, the private property, the board of trustees may exercise the power of eminent domain after receiving approval therefor from the State Board of Education and may then proceed to condemn the property in the manner provided by chapter 73 or chapter 74.
History.--s. 819, ch. 2002-387.
1013.26 Department of Legal Affairs to represent university board in condemnation proceedings.--Any suits or actions brought by a university board of trustees to condemn property, as provided in s. 1013.25, shall be brought in the name of the university board of trustees, and the Department of Legal Affairs shall conduct the proceedings for, and act as the counsel of, the university board of trustees.
History.--s. 820, ch. 2002-387.
1013.27 Purchase of land by municipality.--Any municipality wherein a community college as defined by s. 1004.65 is situated may purchase land with municipal funds and to donate and convey the land or any other land to the community college board of trustees.
History.--s. 821, ch. 2002-387.
1013.28 Disposal of property.--
(1) REAL PROPERTY.--Subject to rules of the State Board of Education, a board may dispose of any land or real property that is, by resolution of the board, determined to be unnecessary for educational purposes as recommended in an educational plant survey. A board shall take diligent measures to dispose of educational property only in the best interests of the public. However, appraisals may be obtained by the board prior to or simultaneously with the receipt of bids.
(2) TANGIBLE PERSONAL PROPERTY.--Tangible personal property which has been properly classified as surplus by a district school board or community college board of trustees shall be disposed of in accordance with the procedure established by chapter 274 and by a university board of trustees by chapter 273. However, the provisions of chapter 274 shall not be applicable to a motor vehicle used in driver education to which title is obtained for a token amount from an automobile dealer or manufacturer. In such cases, the disposal of the vehicle shall be as prescribed in the contractual agreement between the automotive agency or manufacturer and the board.
History.--s. 822, ch. 2002-387.
PART III
PLANNING AND CONSTRUCTION
OF EDUCATIONAL FACILITIES
A. Campus Master Plans and
Educational Plant Surveys
B. Building Codes and Construction
for Educational Facilities
C. Contracting for Educational
Facilities
D. Cooperative Development of
Educational Facilities
A. Campus Master Plans and
Educational Plant Surveys
1013.30 University campus master plans and campus development agreements.
1013.31 Educational plant survey; localized need assessment; PECO project funding.
1013.32 Exception to recommendations in educational plant survey.
1013.33 Coordination of planning with local governing bodies.
1013.35 School district educational facilities plan; definitions; preparation, adoption, and amendment; long-term work programs.
1013.351 Coordination of planning between the Florida School for the Deaf and the Blind and local governing bodies.
1013.355 Educational facilities benefit districts.
1013.356 Local funding for educational facilities benefit districts or community development districts.
1013.357 Educational facilities benefit district or community development district facility utilization.
1013.36 Site planning and selection.
1013.365 Schools on contaminated site prohibited.
1013.30 University campus master plans and campus development agreements.--
(1) This section contains provisions for campus planning and concurrency management that supersede the requirements of part II of chapter 163, except when stated otherwise in this section. These special growth management provisions are adopted in recognition of the unique relationship between university campuses and the local governments in which they are located. While the campuses provide research and educational benefits of statewide and national importance, and further provide substantial educational, economic, and cultural benefits to their host local governments, they may also have an adverse impact on the public facilities and services and natural resources of host governments. On balance, however, universities should be considered as vital public facilities of the state and local governments. The intent of this section is to address this unique relationship by providing for the preparation of campus master plans and associated campus development agreements.
(2) As used in this section:
(a) "Affected local government" means a unit of local government that provides public services to or is responsible for maintaining facilities within a campus of an institution or is directly affected by development that is proposed for a campus.
(b) "Affected person" means a host local government; an affected local government; any state, regional, or federal agency; or a person who resides, owns property, or owns or operates a business within the boundaries of a host local government or affected local government. In order to qualify under this definition, each person, other than a host or affected local government, must have submitted oral or written comments, recommendations, or objections to the university during the period of time beginning with the advertisement of the first public hearing under subsection (6) and ending with the adoption of the campus master plan or plan amendment. If the plan or plan amendment is amended at the adoption hearing, the time period shall be extended by 7 calendar days. However, any comments, recommendations, or objections filed during the extension must be limited to those amendments adopted at the adoption hearing.
(c) "Host local government" means a local government within the jurisdiction of which all or part of a campus of an institution is located, but does not include a county if no part of an institution is located within its unincorporated area.
(d) "Institution" means a university.
(e) "Division" means the Division of Administrative Hearings.
(3) Each university board of trustees shall prepare and adopt a campus master plan for the university and maintain a copy of the plan on the university's website. The master plan must identify general land uses and address the need for and plans for provision of roads, parking, public transportation, solid waste, drainage, sewer, potable water, and recreation and open space during the coming 10 to 20 years. The plans must contain elements relating to future land use, intergovernmental coordination, capital improvements, recreation and open space, general infrastructure, housing, and conservation. Each element must address compatibility with the surrounding community. The master plan must identify specific land uses, general location of structures, densities and intensities of use, and contain standards for onsite development, site design, environmental management, and the preservation of historic and archaeological resources. The transportation element must address reasonable transportation demand management techniques to minimize offsite impacts where possible. Data and analyses on which the elements are based must include, at a minimum: the characteristics of vacant lands; projected impacts of development on onsite and offsite infrastructure, public services, and natural resources; student enrollment projections; student housing needs; and the need for academic and support facilities. Master plans must be updated at least every 5 years.
(4) Campus master plans may contain additional elements at the discretion of the Board of Governors; however, such elements are not subject to review under this section. These additional elements may include the academic mission of the institution, academic program, utilities, public safety, architectural design, landscape architectural design, and facilities maintenance.
(5) Subject to the right of the university board of trustees to initiate the dispute resolution provisions of subsection (8), a campus master plan must not be in conflict with the comprehensive plan of the host local government and the comprehensive plan of any affected local governments. A campus master plan must be consistent with the state comprehensive plan.
(6) Before a campus master plan is adopted, a copy of the draft master plan must be sent for review or made available electronically to the host and any affected local governments, the state land planning agency, the Department of Environmental Protection, the Department of Transportation, the Department of State, the Fish and Wildlife Conservation Commission, and the applicable water management district and regional planning council. At the request of a governmental entity, a hard copy of the draft master plan shall be submitted within 7 business days of an electronic copy being made available. These agencies must be given 90 days after receipt of the campus master plans in which to conduct their review and provide comments to the university board of trustees. The commencement of this review period must be advertised in newspapers of general circulation within the host local government and any affected local government to allow for public comment. Following receipt and consideration of all comments and the holding of an informal information session and at least two public hearings within the host jurisdiction, the university board of trustees shall adopt the campus master plan. It is the intent of the Legislature that the university board of trustees comply with the notice requirements set forth in s. 163.3184(15) to ensure full public participation in this planning process. The informal public information session must be held before the first public hearing. The first public hearing shall be held before the draft master plan is sent to the agencies specified in this subsection. The second public hearing shall be held in conjunction with the adoption of the draft master plan by the university board of trustees. Campus master plans developed under this section are not rules and are not subject to chapter 120 except as otherwise provided in this section.
(7) Notice that the campus master plan has been adopted must be forwarded within 45 days after its adoption to any affected person that submitted comments on the draft campus master plan. The notice must state how and where a copy of the master plan may be obtained or inspected. Within 30 days after receipt of the notice of adoption of the campus master plan, or 30 days after the date the adopted plan is available for review, whichever is later, an affected person who submitted comments on the draft master plan may petition the university board of trustees, challenging the campus master plan as not being in compliance with this section or any rule adopted under this section. The petition must state each objection, identify its source, and provide a recommended action. A petition filed by an affected local government may raise only those issues directly pertaining to the public facilities or services that the affected local government provides to or maintains within the campus or to the direct impact that campus development would have on the affected local government. A petition filed by an affected person must include those items required by the uniform rules adopted under s. 120.54(5). Any affected person who files a petition under this subsection may challenge only those provisions in the plan that were raised by that person's oral or written comments, recommendations, or objections presented to the university board of trustees, as required by 1paragraph (2)(b). The university may, during the pendency of a challenge, negotiate a campus development agreement as provided in subsection (11).
(8) Following receipt of a petition challenging a campus master plan or plan amendment, the university board of trustees must submit the petition to the Division of Administrative Hearings of the Department of Management Services for assignment to an administrative law judge under ss. 120.569 and 120.57.
(a) If a party to the proceeding requests mediation, the parties have no more than 30 days to resolve any issue in dispute. The costs of the mediation must be borne equally by all of the parties to the proceeding.
(b) If the matter is not resolved within 30 days, the administrative law judge shall proceed with a hearing under ss. 120.569 and 120.57. The hearing shall be held in the county where the campus of the university subject to the amendment is located. Within 60 days after receiving the petition, the administrative law judge must, consistent with the applicable requirements and procedures of the Administrative Procedure Act, hold a hearing, identify the issues remaining in dispute, prepare a record of the proceedings, and submit a recommended order to the state land planning agency for final action. Parties to the proceeding may submit written exceptions to the recommended order within 10 days after the recommended order is issued. The state land planning agency must issue its final order no later than 60 days after receiving the recommended order.
(c) The final order of the state land planning agency is subject to judicial review as provided in s. 120.68.
(d) The signature of an attorney or party constitutes a certificate that he or she has read the pleading, motion, or other paper and that, to the best of his or her knowledge, information, and belief formed after reasonable inquiry, it is not interposed for any improper purpose, such as to harass or to cause unnecessary delay, or for economic advantage, competitive reasons, frivolous purposes, or needless increase in the cost of litigation. If a pleading, motion, or other paper is signed in violation of these requirements, the division, upon motion or its own initiative, shall impose upon either the person who signed it or a represented party, or both, an appropriate sanction, which may include an order to pay to the other party or parties the amount of reasonable expenses incurred because of the filing of the pleading, motion, or other paper, including reasonable attorney's fees.
(9) An amendment to a campus master plan must be reviewed and adopted under subsections (6)-(8) if such amendment, alone or in conjunction with other amendments, would:
(a) Increase density or intensity of use of land on the campus by more than 10 percent;
(b) Decrease the amount of natural areas, open space, or buffers on the campus by more than 10 percent; or
(c) Rearrange land uses in a manner that will increase the impact of any proposed campus development by more than 10 percent on a road or on another public facility or service provided or maintained by the state, the county, the host local government, or any affected local government.
(10) Upon adoption of a campus master plan, the university board of trustees shall draft a proposed campus development agreement for each local government and send it to the local government within 270 days after the adoption of the relevant campus master plan.
(11) At a minimum, each campus development agreement:
(a) Must identify the geographic area of the campus and local government covered by the campus development agreement.
(b) Must establish its duration, which must be at least 5 years and not more than 10 years.
(c) Must address public facilities and services including roads, sanitary sewer, solid waste, drainage, potable water, parks and recreation, and public transportation.
(d) Must, for each of the facilities and services listed in paragraph (c), identify the level-of-service standard established by the applicable local government, identify the entity that will provide the service to the campus, and describe any financial arrangements between the Board of Governors and other entities relating to the provision of the facility or service.
(e) Must, for each of the facilities and services listed in paragraph (c), determine the impact of existing and proposed campus development reasonably expected over the term of the campus development agreement on each service or facility and any deficiencies in such service or facility which the proposed campus development will create or to which it will contribute.
(f) May, if proposed by the university board of trustees, address the issues prescribed in paragraphs (d) and (e) with regard to additional facilities and services, including, but not limited to, electricity, nonpotable water, law enforcement, fire and emergency rescue, gas, and telephone.
(g) Must, to the extent it addresses issues addressed in the campus master plan and host local government comprehensive plan, be consistent with the adopted campus master plan and host local government comprehensive plan.
(12)(a) Each proposed campus development agreement must clearly identify the lands to which the university board of trustees intends the campus development agreement to apply.
(b) Such land may include:
1. Land to be purchased by the university board of trustees and if purchased with state appropriated funds titled in the name of the board of trustees of the Internal Improvement Trust Fund for use by an institution over the life of the campus development agreement.
2. Land not owned by the board of trustees of the Internal Improvement Trust Fund if the university board of trustees intends to undertake development activities on the land during the term of the campus development agreement.
(c) Land owned by the Board of Trustees of the Internal Improvement Trust Fund for lease to the Board of Governors acting on behalf of the institution may be excluded, but any development activity undertaken on excluded land is subject to part II of chapter 163.
(13) With regard to the impact of campus development on the facilities and services listed in paragraph (11)(c), the following applies:
(a) All improvements to facilities or services which are necessary to eliminate the deficiencies identified in paragraph (11)(e) must be specifically listed in the campus development agreement.
(b) The university board of trustees' fair share of the cost of the measures identified in paragraph (a) must be stated in the campus development agreement. In determining the fair share, the effect of any demand management techniques, which may include such techniques as flexible work hours and carpooling, that are used by the Board of Governors to minimize the offsite impacts shall be considered.
(c) The university board of trustees is responsible for paying the fair share identified in paragraph (b), and it may do so by:
1. Paying a fair share of each of the improvements identified in paragraph (a); or
2. Taking on full responsibility for the improvements, selected from the list of improvements identified in paragraph (a), and agreed to between the host local government and the Board of Governors, the total cost of which equals the contribution identified in paragraph (b).
(d) All concurrency management responsibilities of the university board of trustees are fulfilled if the university board of trustees expends the total amount of funds identified in paragraph (b) notwithstanding that the university board of trustees may not have undertaken or made contributions to some of the measures identified in paragraph (a).
(e) Capital projects included in the campus development agreement may be used by the local government for the concurrency management purposes.
(f) Funds provided by universities in accordance with campus development agreements are subject to appropriation by the Legislature. A development authorized by a campus development agreement may not be built until the funds to be provided pursuant to paragraph (b) are appropriated by the Legislature.
(14) A campus development agreement may not address or include any standards or requirements for onsite development, including environmental management requirements or requirements for site preparation.
(15) Once the university board of trustees and host local government agree on the provisions of the campus development agreement, the campus development agreement shall be executed by the university board of trustees and the host local government in a manner consistent with the requirements of s. 163.3225. Once the campus development agreement is executed, it is binding upon the university board of trustees and host local government. A copy of the executed campus development agreement must be sent to the state land planning agency within 14 days after the date of execution.
(16) If, within 180 days following the host local government's receipt of the proposed campus development agreement, the university board of trustees and host local government cannot reach agreement on the provisions of the campus development agreement, the following procedures for resolving the matter must be followed:
(a) The matter must be submitted to the state land planning agency, which has 60 days to hold informal hearings, if necessary.
(b) In deciding upon a proper resolution, the state land planning agency shall consider the nature of the issues in dispute, the compliance of the parties with this section, the extent of the conflict between the parties, the comparative hardships, and the public interest involved. In resolving the matter, the state land planning agency may prescribe, by order, the contents of the campus development agreement.
(17) Disputes that arise in the implementation of an executed campus development agreement must be resolved as follows:
(a) Each party shall select one mediator and notify the other in writing of the selection. Thereafter, within 15 days after their selection, the two mediators selected by the parties shall select a neutral, third mediator to complete the mediation panel.
(b) Each party is responsible for all costs and fees payable to the mediator selected by it and shall equally bear responsibility for the costs and fees payable to the third mediator for services rendered and costs expended in connection with resolving disputes pursuant to the campus development agreement.
(c) Within 10 days after the selection of the mediation panel, proceedings must be convened by the panel to resolve the issues in dispute.
(d) Within 60 days after the convening of the panel, the panel shall issue a report containing a recommended resolution of the issues in dispute.
(e) If either the university board of trustees or local government rejects the recommended resolution of the issues in dispute, the disputed issues must be resolved pursuant to the procedures provided by subsection (16).
(18) Once the campus development agreement is executed, all campus development may proceed without further review by the host local government if it is consistent with the adopted campus master plan and associated campus development agreement.
(19) A campus development agreement may be amended under subsections (10)-(16):
(a) In conjunction with any amendment to the campus master plan subject to the requirements in subsection (9).
(b) If either party delays by more than 12 months the construction of a capital improvement identified in the agreement.
(20) Any party to a campus development agreement or aggrieved or adversely affected person, as defined in s. 163.3215(2), may file an action for injunctive relief in the circuit court where the host local government is located to enforce the terms of a campus development agreement or to challenge compliance of the agreement with this section. This action shall be the sole and exclusive remedy of an adversely affected person other than a party to the agreement to enforce any rights or obligations arising from a development agreement.
(21) State and regional environmental program requirements remain applicable, except that this section supersedes all other sections of part II of chapter 163 and s. 380.06 except as provided in this section.
(22) In consultation with the state land planning agency, the Board of Governors shall adopt a single, uniform set of rules to administer subsections (3)-(6). The rules must set specific schedules and procedures for the development and adoption of campus master plans. Before adopting the rules, the Board of Governors must obtain written verification from the state land planning agency that the rules satisfy the minimum statutory criteria required by subsections (3)-(6). The state land planning agency shall provide the verification within 45 days after receiving a copy of the rules.
(23) Until the campus master plan and campus development agreement for an institution have been finalized, any dispute between the university board of trustees and a local government relating to campus development for that institution shall be resolved by the process established in subsection (8).
History.--s. 825, ch. 2002-387; s. 1, ch. 2005-284.
1Note.--Substituted by the editors for a reference to s. 1013.30(1)(b). Section 1013.30(1)(b) does not exist. Paragraph (2)(b) references oral or written comments, recommendations, or objections presented to the university board of trustees by an affected person.
1013.31 Educational plant survey; localized need assessment; PECO project funding.--
(1) At least every 5 years, each board shall arrange for an educational plant survey, to aid in formulating plans for housing the educational program and student population, faculty, administrators, staff, and auxiliary and ancillary services of the district or campus, including consideration of the local comprehensive plan. The Office of Workforce and Economic Development shall document the need for additional career and adult education programs and the continuation of existing programs before facility construction or renovation related to career or adult education may be included in the educational plant survey of a school district or community college that delivers career or adult education programs. Information used by the Office of Workforce and Economic Development to establish facility needs must include, but need not be limited to, labor market data, needs analysis, and information submitted by the school district or community college.
(a) Survey preparation and required data.--Each survey shall be conducted by the board or an agency employed by the board. Surveys shall be reviewed and approved by the board, and a file copy shall be submitted to the Office of Educational Facilities and SMART Schools Clearinghouse within the Office of the Commissioner of Education. The survey report shall include at least an inventory of existing educational and ancillary plants, including safe access facilities; recommendations for existing educational and ancillary plants; recommendations for new educational or ancillary plants, including the general location of each in coordination with the land use plan and safe access facilities; campus master plan update and detail for community colleges; the utilization of school plants based on an extended school day or year-round operation; and such other information as may be required by the rules of the State Board of Education. This report may be amended, if conditions warrant, at the request of the board or commissioner.
(b) Required need assessment criteria for district, community college, college and state university plant surveys.--Educational plant surveys must use uniform data sources and criteria specified in this paragraph. Each revised educational plant survey and each new educational plant survey supersedes previous surveys.
1. The school district's survey must be submitted as a part of the district educational facilities plan defined in s. 1013.35. To ensure that the data reported to the Department of Education as required by this section is correct, the department shall annually conduct an onsite review of 5 percent of the facilities reported for each school district completing a new survey that year. If the department's review finds the data reported by a district is less than 95 percent accurate, within 1 year from the time of notification by the department the district must submit revised reports correcting its data. If a district fails to correct its reports, the commissioner may direct that future fixed capital outlay funds be withheld until such time as the district has corrected its reports so that they are not less than 95 percent accurate.
2. Each survey of a special facility, joint-use facility, or cooperative career education facility must be based on capital outlay full-time equivalent student enrollment data prepared by the department for school districts, community colleges, colleges, and universities. A survey of space needs of a joint-use facility shall be based upon the respective space needs of the school districts, community colleges, colleges, and universities, as appropriate. Projections of a school district's facility space needs may not exceed the norm space and occupant design criteria established by the State Requirements for Educational Facilities.
3. Each community college's survey must reflect the capacity of existing facilities as specified in the inventory maintained by the Department of Education. Projections of facility space needs must comply with standards for determining space needs as specified by rule of the State Board of Education. The 5-year projection of capital outlay student enrollment must be consistent with the annual report of capital outlay full-time student enrollment prepared by the Department of Education.
4. Each college and state university's survey must reflect the capacity of existing facilities as specified in the inventory maintained and validated by the Division of Colleges and Universities. Projections of facility space needs must be consistent with standards for determining space needs approved by the Division of Colleges and Universities. The projected capital outlay full-time equivalent student enrollment must be consistent with the 5-year planned enrollment cycle for the State University System approved by the Division of Colleges and Universities.
5. The district educational facilities plan of a school district and the educational plant survey of a community college, or college or state university may include space needs that deviate from approved standards for determining space needs if the deviation is justified by the district or institution and approved by the department, as necessary for the delivery of an approved educational program.
(c) Review and validation.--The Office of Educational Facilities and SMART Schools Clearinghouse shall review and validate the surveys of school districts, community colleges, and colleges and universities, and any amendments thereto for compliance with the requirements of this chapter and shall recommend those in compliance for approval by the State Board of Education. Annually, the department shall perform an in-depth analysis of a representative sample of each survey of recommended needs for five districts selected by the commissioner from among districts with the largest need-to-revenue ratio. For the purpose of this subsection, the need-to-revenue ratio is determined by dividing the total 5-year cost of projects listed on the district survey by the total 5-year fixed capital outlay revenue projections from state and local sources as determined by the department. The commissioner may direct fixed capital outlay funds to be withheld from districts until such time as the survey accurately projects facilities needs.
(d) Periodic update of Florida Inventory of School Houses.--School districts shall periodically update their inventory of educational facilities as new capacity becomes available and as unsatisfactory space is eliminated. The State Board of Education shall adopt rules to determine the time frame in which districts must provide a periodic update.
(2) Only the district school superintendent, community college president, or the university president shall certify to the Office of Educational Facilities and SMART Schools Clearinghouse a project's compliance with the requirements for expenditure of PECO funds prior to release of funds.
(a) Upon request for release of PECO funds for planning purposes, certification must be made to the Office of Educational Facilities and SMART Schools Clearinghouse that the need for and location of the facility are in compliance with the board-approved survey recommendations, that the project meets the definition of a PECO project and the limiting criteria for expenditures of PECO funding, and that the plan is consistent with the local government comprehensive plan.
(b) Upon request for release of construction funds, certification must be made to the Office of Educational Facilities and SMART Schools Clearinghouse that the need and location of the facility are in compliance with the board-approved survey recommendations, that the project meets the definition of a PECO project and the limiting criteria for expenditures of PECO funding, and that the construction documents meet the requirements of the Florida Building Code for educational facilities construction or other applicable codes as authorized in this chapter.
History.--s. 14, ch. 2002-296; s. 826, ch. 2002-387; s. 128, ch. 2003-1; s. 18, ch. 2003-391; s. 136, ch. 2004-357.
1013.32 Exception to recommendations in educational plant survey.--An exception to the recommendations in the educational plant survey may be allowed if a board considers that it will be advantageous to the welfare of the educational system or that it will make possible a substantial saving of funds. A board, upon determining that an exception is warranted, must present a full statement, in writing, setting forth all the facts to the Commissioner of Education.
History.--s. 827, ch. 2002-387.
1013.33 Coordination of planning with local governing bodies.--
(1) It is the policy of this state to require the coordination of planning between boards and local governing bodies to ensure that plans for the construction and opening of public educational facilities are facilitated and coordinated in time and place with plans for residential development, concurrently with other necessary services. Such planning shall include the integration of the educational facilities plan and applicable policies and procedures of a board with the local comprehensive plan and land development regulations of local governments. The planning must include the consideration of allowing students to attend the school located nearest their homes when a new housing development is constructed near a county boundary and it is more feasible to transport the students a short distance to an existing facility in an adjacent county than to construct a new facility or transport students longer distances in their county of residence. The planning must also consider the effects of the location of public education facilities, including the feasibility of keeping central city facilities viable, in order to encourage central city redevelopment and the efficient use of infrastructure and to discourage uncontrolled urban sprawl. In addition, all parties to the planning process must consult with state and local road departments to assist in implementing the Safe Paths to Schools program administered by the Department of Transportation.
(2)(a) The school board, county, and nonexempt municipalities located within the geographic area of a school district shall enter into an interlocal agreement that jointly establishes the specific ways in which the plans and processes of the district school board and the local governments are to be coordinated. The interlocal agreements shall be submitted to the state land planning agency and the Office of Educational Facilities and the SMART Schools Clearinghouse in accordance with a schedule published by the state land planning agency.
(b) The schedule must establish staggered due dates for submission of interlocal agreements that are executed by both the local government and district school board, commencing on March 1, 2003, and concluding by December 1, 2004, and must set the same date for all governmental entities within a school district. However, if the county where the school district is located contains more than 20 municipalities, the state land planning agency may establish staggered due dates for the submission of interlocal agreements by these municipalities. The schedule must begin with those areas where both the number of districtwide capital-outlay full-time-equivalent students equals 80 percent or more of the current year's school capacity and the projected 5-year student growth rate is 1,000 or greater, or where the projected 5-year student growth rate is 10 percent or greater.
(c) If the student population has declined over the 5-year period preceding the due date for submittal of an interlocal agreement by the local government and the district school board, the local government and district school board may petition the state land planning agency for a waiver of one or more of the requirements of subsection (3). The waiver must be granted if the procedures called for in subsection (3) are unnecessary because of the school district's declining school age population, considering the district's 5-year work program prepared pursuant to s. 1013.35. The state land planning agency may modify or revoke the waiver upon a finding that the conditions upon which the waiver was granted no longer exist. The district school board and local governments must submit an interlocal agreement within 1 year after notification by the state land planning agency that the conditions for a waiver no longer exist.
(d) Interlocal agreements between local governments and district school boards adopted pursuant to s. 163.3177 before the effective date of subsections (2)-(9) must be updated and executed pursuant to the requirements of subsections (2)-(9), if necessary. Amendments to interlocal agreements adopted pursuant to subsections (2)-(9) must be submitted to the state land planning agency within 30 days after execution by the parties for review consistent with subsections (3) and (4). Local governments and the district school board in each school district are encouraged to adopt a single interlocal agreement in which all join as parties. The state land planning agency shall assemble and make available model interlocal agreements meeting the requirements of subsections (2)-(9) and shall notify local governments and, jointly with the Department of Education, the district school boards of the requirements of subsections (2)-(9), the dates for compliance, and the sanctions for noncompliance. The state land planning agency shall be available to informally review proposed interlocal agreements. If the state land planning agency has not received a proposed interlocal agreement for informal review, the state land planning agency shall, at least 60 days before the deadline for submission of the executed agreement, renotify the local government and the district school board of the upcoming deadline and the potential for sanctions.
(3) At a minimum, the interlocal agreement must address interlocal agreement requirements in s. 163.3180(13)(g), except for exempt local governments as provided in s. 163.3177(12), and must address the following issues:
(a) A process by which each local government and the district school board agree and base their plans on consistent projections of the amount, type, and distribution of population growth and student enrollment. The geographic distribution of jurisdiction-wide growth forecasts is a major objective of the process.
(b) A process to coordinate and share information relating to existing and planned public school facilities, including school renovations and closures, and local government plans for development and redevelopment.
(c) Participation by affected local governments with the district school board in the process of evaluating potential school closures, significant renovations to existing schools, and new school site selection before land acquisition. Local governments shall advise the district school board as to the consistency of the proposed closure, renovation, or new site with the local comprehensive plan, including appropriate circumstances and criteria under which a district school board may request an amendment to the comprehensive plan for school siting.
(d) A process for determining the need for and timing of onsite and offsite improvements to support new construction, proposed expansion, or redevelopment of existing schools. The process shall address identification of the party or parties responsible for the improvements.
(e) A process for the school board to inform the local government regarding the effect of comprehensive plan amendments on school capacity. The capacity reporting must be consistent with laws and rules regarding measurement of school facility capacity and must also identify how the district school board will meet the public school demand based on the facilities work program adopted pursuant to s. 1013.35.
(f) Participation of the local governments in the preparation of the annual update to the school board's 5-year district facilities work program and educational plant survey prepared pursuant to s. 1013.35.
(g) A process for determining where and how joint use of either school board or local government facilities can be shared for mutual benefit and efficiency.
(h) A procedure for the resolution of disputes between the district school board and local governments, which may include the dispute resolution processes contained in chapters 164 and 186.
(i) An oversight process, including an opportunity for public participation, for the implementation of the interlocal agreement.
(4)(a) The Office of Educational Facilities and SMART Schools Clearinghouse shall submit any comments or concerns regarding the executed interlocal agreement to the state land planning agency within 30 days after receipt of the executed interlocal agreement. The state land planning agency shall review the executed interlocal agreement to determine whether it is consistent with the requirements of subsection (3), the adopted local government comprehensive plan, and other requirements of law. Within 60 days after receipt of an executed interlocal agreement, the state land planning agency shall publish a notice of intent in the Florida Administrative Weekly and shall post a copy of the notice on the agency's Internet site. The notice of intent must state that the interlocal agreement is consistent or inconsistent with the requirements of subsection (3) and this subsection as appropriate.
(b) The state land planning agency's notice is subject to challenge under chapter 120; however, an affected person, as defined in s. 163.3184(1)(a), has standing to initiate the administrative proceeding, and this proceeding is the sole means available to challenge the consistency of an interlocal agreement required by this section with the criteria contained in subsection (3) and this subsection. In order to have standing, each person must have submitted oral or written comments, recommendations, or objections to the local government or the school board before the adoption of the interlocal agreement by the district school board and local government. The district school board and local governments are parties to any such proceeding. In this proceeding, when the state land planning agency finds the interlocal agreement to be consistent with the criteria in subsection (3) and this subsection, the interlocal agreement must be determined to be consistent with subsection (3) and this subsection if the local government's and school board's determination of consistency is fairly debatable. When the state land planning agency finds the interlocal agreement to be inconsistent with the requirements of subsection (3) and this subsection, the local government's and school board's determination of consistency shall be sustained unless it is shown by a preponderance of the evidence that the interlocal agreement is inconsistent.
(c) If the state land planning agency enters a final order that finds that the interlocal agreement is inconsistent with the requirements of subsection (3) or this subsection, the state land planning agency shall forward it to the Administration Commission, which may impose sanctions against the local government pursuant to s. 163.3184(11) and may impose sanctions against the district school board by directing the Department of Education to withhold an equivalent amount of funds for school construction available pursuant to ss. 1013.65, 1013.68, 1013.70, and 1013.72.
(5) If an executed interlocal agreement is not timely submitted to the state land planning agency for review, the state land planning agency shall, within 15 working days after the deadline for submittal, issue to the local government and the district school board a notice to show cause why sanctions should not be imposed for failure to submit an executed interlocal agreement by the deadline established by the agency. The agency shall forward the notice and the responses to the Administration Commission, which may enter a final order citing the failure to comply and imposing sanctions against the local government and district school board by directing the appropriate agencies to withhold at least 5 percent of state funds pursuant to s. 163.3184(11) and by directing the Department of Education to withhold from the district school board at least 5 percent of funds for school construction available pursuant to ss. 1013.65, 1013.68, 1013.70, and 1013.72.
(6) Any local government transmitting a public school element to implement school concurrency pursuant to the requirements of s. 163.3180 before the effective date of this section is not required to amend the element or any interlocal agreement to conform with the provisions of subsections (2)-(8) if the element is adopted prior to or within 1 year after the effective date of subsections (2)-(8) and remains in effect.
(7) Except as provided in subsection (8), municipalities meeting the exemption criteria in s. 163.3177(12) are exempt from the requirements of subsections (2), (3), and (4).
(8) At the time of the evaluation and appraisal report, each exempt municipality shall assess the extent to which it continues to meet the criteria for exemption under s. 163.3177(12). If the municipality continues to meet these criteria, the municipality shall continue to be exempt from the interlocal agreement requirement. Each municipality exempt under s. 163.3177(12) must comply with the provisions of subsections (2)-(8) within 1 year after the district school board proposes, in its 5-year district facilities work program, a new school within the municipality's jurisdiction.
(9) A board and the local governing body must share and coordinate information related to existing and planned school facilities; proposals for development, redevelopment, or additional development; and infrastructure required to support the school facilities, concurrent with proposed development. A school board shall use information produced by the demographic, revenue, and education estimating conferences pursuant to s. 216.136 when preparing the district educational facilities plan pursuant to s. 1013.35, as modified and agreed to by the local governments, when provided by interlocal agreement, and the Office of Educational Facilities and SMART Schools Clearinghouse, in consideration of local governments' population projections, to ensure that the district educational facilities plan not only reflects enrollment projections but also considers applicable municipal and county growth and development projections. The projections must be apportioned geographically with assistance from the local governments using local government trend data and the school district student enrollment data. A school board is precluded from siting a new school in a jurisdiction where the school board has failed to provide the annual educational facilities plan for the prior year required pursuant to s. 1013.35 unless the failure is corrected.
(10) The location of educational facilities shall be consistent with the comprehensive plan of the appropriate local governing body developed under part II of chapter 163 and consistent with the plan's implementing land development regulations.
(11) To improve coordination relative to potential educational facility sites, a board shall provide written notice to the local government that has regulatory authority over the use of the land consistent with an interlocal agreement entered pursuant to subsections (2)-(8) at least 60 days prior to acquiring or leasing property that may be used for a new public educational facility. The local government, upon receipt of this notice, shall notify the board within 45 days if the site proposed for acquisition or lease is consistent with the land use categories and policies of the local government's comprehensive plan. This preliminary notice does not constitute the local government's determination of consistency pursuant to subsection (12).
(12) As early in the design phase as feasible and consistent with an interlocal agreement entered pursuant to subsections (2)-(8), but no later than 90 days before commencing construction, the district school board shall in writing request a determination of consistency with the local government's comprehensive plan. The local governing body that regulates the use of land shall determine, in writing within 45 days after receiving the necessary information and a school board's request for a determination, whether a proposed educational facility is consistent with the local comprehensive plan and consistent with local land development regulations. If the determination is affirmative, school construction may commence and further local government approvals are not required, except as provided in this section. Failure of the local governing body to make a determination in writing within 90 days after a district school board's request for a determination of consistency shall be considered an approval of the district school board's application. Campus master plans and development agreements must comply with the provisions of ss. 1013.30 and 1013.63.
(13) A local governing body may not deny the site applicant based on adequacy of the site plan as it relates solely to the needs of the school. If the site is consistent with the comprehensive plan's land use policies and categories in which public schools are identified as allowable uses, the local government may not deny the application but it may impose reasonable development standards and conditions in accordance with s. 1013.51(1) and consider the site plan and its adequacy as it relates to environmental concerns, health, safety and welfare, and effects on adjacent property. Standards and conditions may not be imposed which conflict with those established in this chapter or the Florida Building Code, unless mutually agreed and consistent with the interlocal agreement required by subsections (2)-(8).
(14) This section does not prohibit a local governing body and district school board from agreeing and establishing an alternative process for reviewing a proposed educational facility and site plan, and offsite impacts, pursuant to an interlocal agreement adopted in accordance with subsections (2)-(8).
(15) Existing schools shall be considered consistent with the applicable local government comprehensive plan adopted under part II of chapter 163. If a board submits an application to expand an existing school site, the local governing body may impose reasonable development standards and conditions on the expansion only, and in a manner consistent with s. 1013.51(1). Standards and conditions may not be imposed which conflict with those established in this chapter or the Florida Building Code, unless mutually agreed. Local government review or approval is not required for:
(a) The placement of temporary or portable classroom facilities; or
(b) Proposed renovation or construction on existing school sites, with the exception of construction that changes the primary use of a facility, includes stadiums, or results in a greater than 5 percent increase in student capacity, or as mutually agreed upon, pursuant to an interlocal agreement adopted in accordance with subsections