2005 Washington Revised Code RCW 39.35.040: Facility design to include life-cycle cost analysis.

    Whenever a public agency determines that any major facility is to be constructed or renovated, such agency shall cause to be included in the design phase of such construction or renovation a provision that requires a life-cycle cost analysis conforming with the guidelines developed in RCW 39.35.050 to be prepared for such facility. Such analysis shall be approved by the agency prior to the commencement of actual construction or renovation. A public agency may accept the facility design if the agency is satisfied that the life-cycle cost analysis provides for an efficient energy system or systems based on the economic life of the major facility.

         Nothing in this section prohibits the construction or renovation of major facilities which utilize renewable energy systems.

    [1994 c 242 § 2; 1982 c 159 § 4; 1975 1st ex.s. c 177 § 4.]

Notes:
         Applicability -- 1982 c 159: See notes following RCW 39.35.010.

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.