2011 US Code
Title 33 - Navigation and Navigable Waters
Chapter 26 - WATER POLLUTION PREVENTION AND CONTROL (§§ 1251 - 1387)
Subchapter II - GRANTS FOR CONSTRUCTION OF TREATMENT WORKS (§§ 1281 - 1301)
Section 1292 - Definitions

View Metadata
Metadata
Publication TitleUnited States Code, 2006 Edition, Supplement 5, Title 33 - NAVIGATION AND NAVIGABLE WATERS
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 33 - NAVIGATION AND NAVIGABLE WATERS
CHAPTER 26 - WATER POLLUTION PREVENTION AND CONTROL
SUBCHAPTER II - GRANTS FOR CONSTRUCTION OF TREATMENT WORKS
Sec. 1292 - Definitions
Containssection 1292
Date2011
Laws in Effect as of DateJanuary 3, 2012
Positive LawNo
Dispositionstandard
Source CreditJune 30, 1948, ch. 758, title II, §212, as added Pub. L. 92-500, §2, Oct. 18, 1972, 86 Stat. 844; amended Pub. L. 95-217, §37, Dec. 27, 1977, 91 Stat. 1581; Pub. L. 97-117, §8(d), Dec. 29, 1981, 95 Stat. 1626.
Statutes at Large References86 Stat. 844
91 Stat. 1581
95 Stat. 1626
Public Law ReferencesPublic Law 92-500, Public Law 95-217, Public Law 97-117

Download PDF
33 USC § 1292 (2011)
§1292. Definitions

As used in this subchapter—

(1) The term “construction” means any one or more of the following: preliminary planning to determine the feasibility of treatment works, engineering, architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures, field testing of innovative or alternative waste water treatment processes and techniques meeting guidelines promulgated under section 1314(d)(3) of this title, or other necessary actions, erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works, or the inspection or supervision of any of the foregoing items.

(2)(A) The term “treatment works” means any devices and systems used in the storage, treatment, recycling, and reclamation of municipal sewage or industrial wastes of a liquid nature to implement section 1281 of this title, or necessary to recycle or reuse water at the most economical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping, power, and other equipment, and their appurtenances; extensions, improvements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and any works, including site acquisition of the land that will be an integral part of the treatment process (including land used for the storage of treated wastewater in land treatment systems prior to land application) or is used for ultimate disposal of residues resulting from such treatment.

(B) In addition to the definition contained in subparagraph (A) of this paragraph, “treatment works” means any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste, including storm water runoff, or industrial waste, including waste in combined storm water and sanitary sewer systems. Any application for construction grants which includes wholly or in part such methods or systems shall, in accordance with guidelines published by the Administrator pursuant to subparagraph (C) of this paragraph, contain adequate data and analysis demonstrating such proposal to be, over the life of such works, the most cost efficient alternative to comply with sections 1311 or 1312 of this title, or the requirements of section 1281 of this title.

(C) For the purposes of subparagraph (B) of this paragraph, the Administrator shall, within one hundred and eighty days after October 18, 1972, publish and thereafter revise no less often than annually, guidelines for the evaluation of methods, including cost-effective analysis, described in subparagraph (B) of this paragraph.

(3) The term “replacement” as used in this subchapter means those expenditures for obtaining and installing equipment, accessories, or appurtenances during the useful life of the treatment works necessary to maintain the capacity and performance for which such works are designed and constructed.

(June 30, 1948, ch. 758, title II, §212, as added Pub. L. 92–500, §2, Oct. 18, 1972, 86 Stat. 844; amended Pub. L. 95–217, §37, Dec. 27, 1977, 91 Stat. 1581; Pub. L. 97–117, §8(d), Dec. 29, 1981, 95 Stat. 1626.)

Amendments

1981—Par. (1). Pub. L. 97–117 inserted “field testing of innovative or alternative waste water treatment processes and techniques meeting guidelines promulgated under section 1314(d)(3) of this title,” after “procedures,”.

1977—Par. (2)(A). Pub. L. 95–217 inserted “(including land used for the storage of treated wastewater in land treatment systems prior to land application)” after “integral part of the treatment process”.

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.