1998 US Code
Title 33 - NAVIGATION AND NAVIGABLE WATERS
CHAPTER 15 - FLOOD CONTROL
Sec. 701b-13 - Construction of flood control projects by non-Federal interests

View Metadata
Metadata
Publication TitleUnited States Code, 1994 Edition, Supplement 4, Title 33 - NAVIGATION AND NAVIGABLE WATERS
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 33 - NAVIGATION AND NAVIGABLE WATERS
CHAPTER 15 - FLOOD CONTROL
Sec. 701b-13 - Construction of flood control projects by non-Federal interests
Containssection 701b-13
Date1998
Laws in Effect as of DateJanuary 5, 1999
Positive LawNo
Dispositionstandard
Source CreditPub. L. 104-303, title II, §211, Oct. 12, 1996, 110 Stat. 3681.
Statutes at Large References83 Stat. 852
104 Stat. 4606, 4610, 4611, 4605
106 Stat. 4803
110 Stat. 3681
Public Law ReferencesPublic Law 91-190, Public Law 101-640, Public Law 102-580, Public Law 104-303


§701b–13. Construction of flood control projects by non-Federal interests (a) Authority

Non-Federal interests are authorized to undertake flood control projects in the United States, subject to obtaining any permits required pursuant to Federal and State laws in advance of actual construction.

(b) Studies and design activities (1) By non-Federal interests

A non-Federal interest may prepare, for review and approval by the Secretary, the necessary studies and design documents for any construction to be undertaken pursuant to subsection (a) of this section.

(2) By Secretary

Upon request of an appropriate non-Federal interest, the Secretary may undertake all necessary studies and design activities for any construction to be undertaken pursuant to subsection (a) of this section and provide technical assistance in obtaining all necessary permits for such construction if the non-Federal interest contracts with the Secretary to provide to the United States funds for the studies and design activities during the period in which the studies and design activities will be conducted.

(c) Completion of studies and design activities

In the case of any study or design documents for a flood control project that were initiated before October 12, 1996, the Secretary may complete and transmit to the appropriate non-Federal interests the study or design documents or, upon the request of such non-Federal interests, terminate the study or design activities and transmit the partially completed study or design documents to such non-Federal interests for completion. Studies and design documents subject to this subsection shall be completed without regard to the requirements of subsection (b) of this section.

(d) Authority to carry out improvement (1) In general

Any non-Federal interest that has received from the Secretary pursuant to subsection (b) or (c) of this section a favorable recommendation to carry out a flood control project, or separable element of a flood control project, based on the results of completed studies and design documents for the project or element may carry out the project or element if a final environmental impact statement under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) has been filed for the project or element.

(2) Permits

Any plan of improvement proposed to be implemented in accordance with this subsection shall be deemed to satisfy the requirements for obtaining the appropriate permits required under the Secretary's authority. Such permits shall be granted subject to the non-Federal interest's acceptance of the terms and conditions of such permits if the Secretary determines that the applicable regulatory criteria and procedures have been satisfied.

(3) Monitoring

The Secretary shall monitor any project for which a permit is granted under this subsection in order to ensure that such project is constructed, operated, and maintained in accordance with the terms and conditions of such permit.

(e) Reimbursement (1) General rule

Subject to appropriations Acts, the Secretary may reimburse any non-Federal interest an amount equal to the estimate of the Federal share, without interest, of the cost of any authorized flood control project, or separable element of a flood control project, constructed pursuant to this section—

(A) if, after authorization and before initiation of construction of the project or separable element, the Secretary approves the plans for construction of such project by the non-Federal interest; and

(B) if the Secretary finds, after a review of studies and design documents prepared pursuant to this section, that construction of the project or separable element is economically justified and environmentally acceptable.

(2) Special rules (A) Reimbursement

For work (including work associated with studies, planning, design, and construction) carried out by a non-Federal interest with respect to a project described in subsection (f) of this section, the Secretary shall, subject to amounts being made available in advance in appropriations Acts, reimburse, without interest, the non-Federal interest an amount equal to the estimated Federal share of the cost of such work if such work is later recommended by the Chief of Engineers and approved by the Secretary.

(B) Credit

If the non-Federal interest for a project described in subsection (f) of this section carries out work before completion of a reconnaissance study by the Secretary and if such work is determined by the Secretary to be compatible with the project later recommended by the Secretary, the Secretary shall credit the non-Federal interest for its share of the cost of the project for such work.

(3) Matters to be considered in reviewing plans

In reviewing plans under this subsection, the Secretary shall consider budgetary and programmatic priorities and other factors that the Secretary considers appropriate.

(4) Monitoring

The Secretary shall regularly monitor and audit any project for flood control approved for construction under this section by a non-Federal interest to ensure that such construction is in compliance with the plans approved by the Secretary and that the costs are reasonable.

(5) Limitation on reimbursements

The Secretary may not make any reimbursement under this section until the Secretary determines that the work for which reimbursement is requested has been performed in accordance with applicable permits and approved plans.

(f) Specific projects

For the purpose of demonstrating the potential advantages and effectiveness of non-Federal implementation of flood control projects, the Secretary shall enter into agreements pursuant to this section with non-Federal interests for development of the following flood control projects by such interests:

(1) Berryessa Creek, California

The Berryessa Creek element of the project for flood control, Coyote and Berryessa Creeks, California, authorized by section 101(a)(5) of the Water Resources Development Act of 1990 (104 Stat. 4606); except that, subject to the approval of the Secretary as provided by this section, the non-Federal interest may design and construct an alternative to such element.

(2) Los Angeles County Drainage Area, California

The project for flood control, Los Angeles County Drainage Area, California, authorized by section 101(b) of the Water Resources Development Act of 1990 (104 Stat. 4611).

(3) Stockton Metropolitan Area, California

The project for flood control, Stockton Metropolitan Area, California.

(4) Upper Guadalupe River, California

The project for flood control, Upper Guadalupe River, California.

(5) Flamingo and Tropicana Washes, Nevada

The project for flood control, Las Vegas Wash and Tributaries (Flamingo and Tropicana Washes), Nevada, authorized by section 101(13) of the Water Resources Development Act of 1992 (106 Stat. 4803).

(6) Brays Bayou, Texas

Flood control components comprising the Brays Bayou element of the project for flood control, Buffalo Bayou and tributaries, Texas, authorized by section 101(a)(21) of the Water Resources Development Act of 1990 (104 Stat. 4610); except that, subject to the approval of the Secretary as provided by this section, the non-Federal interest may design and construct an alternative to the diversion component of such element.

(7) Hunting Bayou, Texas

The Hunting Bayou element of the project for flood control, Buffalo Bayou and tributaries, Texas, authorized by such section; except that, subject to the approval of the Secretary as provided by this section, the non-Federal interest may design and construct an alternative to such element.

(8) White Oak Bayou, Texas

The project for flood control, White Oak Bayou watershed, Texas.

(g) Treatment of flood damage prevention measures

For the purposes of this section, flood damage prevention measures at or in the vicinity of Morgan City and Berwick, Louisiana, shall be treated as an authorized separable element of the Atchafalaya Basin feature of the project for flood control, Mississippi River and Tributaries.

(Pub. L. 104–303, title II, §211, Oct. 12, 1996, 110 Stat. 3681.)

References in Text

The National Environmental Policy Act of 1969, referred to in subsec. (d)(1), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, as amended, which is classified generally to chapter 55 (§4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.

Section 101 of the Water Resources Development Act of 1990, referred to in subsec. (f)(1), (2), (6), is section 101 of Pub. L. 101–640, title I, Nov. 28, 1990, 104 Stat. 4605, which is not classified to the Code.

Section 101(13) of the Water Resources Development Act of 1992, referred to in subsec. (f)(5), is section 101(13) of Pub. L. 102–580, title I, Oct. 31, 1992, 106 Stat. 4803, which is not classified to the Code.

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.