§ 3-306 - Review of and recommendation concerning applications for certificate of public convenience and necessity associated with power plant construction


MD Nat Res Code § 3-306 (2013) What's This?

§3-306.

(a) Notwithstanding anything to the contrary in this article or the Public Utilities Article, on application to the Public Service Commission for a certificate of public convenience and necessity associated with power plant construction involving, but not limited to, use or diversion of the waters of the State, or private wetlands, the Commission shall notify immediately the Department of Natural Resources and the Department of the Environment of the application. The Commission shall supply the Department of Natural Resources and the Department of the Environment with any pertinent information available regarding the application. The Department of the Environment shall treat the application for a certificate of public convenience and necessity as an application for appropriation or use of waters of the State under Title 5 of the Environment Article and as an application for a license for dredging and filling under Title 16 of the Environment Article.

(b) Within 60 days after the application for a certificate of public convenience and necessity has been filed with the Commission, the Secretary shall require the Department of Natural Resources to complete any additional study and investigation concerning the application, and the Secretary of the Environment shall require the Department of the Environment to study and investigate the necessity for dredging and filling at the proposed plant site and water appropriation or use. The Secretary and the Secretary of the Environment jointly shall forward the results of the study and investigation, together with a recommendation that the certificate be granted, denied, or granted with any condition deemed necessary, to the chairman of the Commission.

(c) The results and recommendations shall be open for public inspection and shall be presented by the Secretaries or their designees at the hearing the Commission holds as required by Title 7, Subtitle 2 of the Public Utilities Article. Within 15 days from the conclusion of the hearing, and based on the evidence there presented, the Secretaries jointly shall present their final recommendation to the chairman of the Commission including, but not limited to, any specific conclusions as to any private wetlands involved and any specific conclusions as to any water use or restriction of water use involved.

§ 3-306 - 1. Use of sites in inventory without regard to local zoning rule, etc

In view of the safeguards provided by this subtitle through State units, and to assure the controlling effect of their determinations, any property certified as a suitable site by the Secretary of Natural Resources and placed in inventory as provided in this subtitle or any sites acquired and placed in inventory as provided in this subtitle shall be used and operated for electric generating and associated on-site transmission purposes without regard to any local zoning rule, regulation, law, or ordinance, and this use is not required to be submitted to or approved by any county or municipal zoning board, authority, or unit.

Disclaimer: These codes may not be the most recent version. Maryland may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.