2013 Indiana Code TITLE 8. UTILITIES AND TRANSPORTATION ARTICLE 1. UTILITIES GENERALLY CHAPTER 39. TRANSMISSION, DISTRIBUTION, AND STORAGE SYSTEM IMPROVEMENT CHARGES AND DEFERRALS
Download as PDF
IC 8-1-39
Chapter 39. Transmission, Distribution, and Storage System
Improvement Charges and Deferrals
IC 8-1-39-1
Application of definitions in IC 8-1-2-1
Sec. 1. The definitions in IC 8-1-2-1 apply throughout this
chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-2
"Eligible transmission, distribution, and storage system
improvements"
Sec. 2. As used in this chapter, "eligible transmission,
distribution, and storage system improvements" means new or
replacement electric or gas transmission, distribution, or storage
utility projects that:
(1) a public utility undertakes for purposes of safety, reliability,
system modernization, or economic development, including the
extension of gas service to rural areas;
(2) were not included in the public utility's rate base in its most
recent general rate case; and
(3) either were:
(A) designated in the public utility's seven (7) year plan and
approved by the commission under section 10 of this chapter
as eligible for TDSIC treatment; or
(B) approved as a targeted economic development project
under section 11 of this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-3
"Pretax return"
Sec. 3. As used in this chapter, "pretax return" means the TDSIC
revenues necessary to:
(1) produce net operating income equal to the public utility's
weighted cost of capital multiplied by investments in eligible
transmission, distribution, and storage system improvements;
(2) pay state and federal income taxes imposed on the net
operating income calculated under subdivision (1); and
(3) pay state utility receipts taxes associated with TDSIC
revenues.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-4
"Public utility"
Sec. 4. As used in this chapter, "public utility" means:
(1) an energy utility (as defined in IC 8-1-2.5-2);
(2) a municipally owned utility (as defined in IC 8-1-2-1(h)); or
(3) a department of public utilities created by IC 8-1-11.1.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-5
"Targeted economic development project"
Sec. 5. As used in this chapter, "targeted economic development
project" means a project approved by the commission under section
10(c) of this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-6
"TDSIC"
Sec. 6. As used in this chapter, "TDSIC" refers to a transmission,
distribution, and storage system improvement charge.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-7
"TDSIC costs"
Sec. 7. As used in this chapter, "TDSIC costs" means the
following costs incurred with respect to eligible transmission,
distribution, and storage system improvements incurred both while
the improvements are under construction and post in service:
(1) Depreciation expenses.
(2) Operation and maintenance expenses.
(3) Extensions and replacements to the extent not provided for
through depreciation, in the manner provided for in
IC 8-1.5-3-8.
(4) Property taxes.
(5) Pretax returns.
The term includes costs associated with a targeted economic
development project approved under section 11 of this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-8
"TDSIC revenues"
Sec. 8. As used in this chapter, "TDSIC revenues" means revenues
produced through a TDSIC and excluding revenues from all other
rates and charges.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-9
Petition; contents; recovery and deferral of TDSIC costs
Sec. 9. (a) Subject to subsection (c), a public utility that provides
electric or gas utility service may file with the commission rate
schedules establishing a TDSIC that will allow the periodic
automatic adjustment of the public utility's basic rates and charges to
provide for timely recovery of eighty percent (80%) of approved
capital expenditures and TDSIC costs. The petition must:
(1) use the customer class revenue allocation factor based on
firm load approved in the public utility's most recent retail base
rate case order;
(2) include the public utility's seven (7) year plan for eligible
transmission, distribution, and storage system improvements;
and
(3) identify projected effects of the plan described in
subdivision (2) on retail rates and charges.
The public utility shall provide a copy of the petition to the office of
the utility consumer counselor when the petition is filed with the
commission. The public utility shall update the public utility's seven
(7) year plan under subdivision (2) with each petition the public
utility files under this section. An update may include a petition for
approval of a targeted economic development project under section
11 of this chapter.
(b) A public utility that recovers capital expenditures and TDSIC
costs under subsection (a) shall defer the remaining twenty percent
(20%) of approved capital expenditures and TDSIC costs, including
depreciation, allowance for funds used during construction, and post
in service carrying costs, and shall recover those capital expenditures
and TDSIC costs as part of the next general rate case that the public
utility files with the commission.
(c) Except as provided in section 15 of this chapter, a public
utility may not file a petition under subsection (a) within nine (9)
months after the date on which the commission issues an order
changing the public utility's basic rates and charges with respect to
the same type of utility service.
(d) A public utility that implements a TDSIC under this chapter
shall, before the expiration of the public utility's approved seven (7)
year plan, petition the commission for review and approval of the
public utility's basic rates and charges with respect to the same type
of utility service.
(e) A public utility may file a petition under this section not more
than one (1) time every six (6) months.
(f) Actual capital expenditures and TDSIC costs that exceed the
approved capital expenditures and TDSIC costs require specific
justification by the public utility and specific approval by the
commission before being authorized for recovery in customer rates.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-10
Approval of seven year plan; inclusion of targeted economic
development project; notice, hearing, and order
Sec. 10. (a) A public utility shall petition the commission for
approval of the public utility's seven (7) year plan for eligible
transmission, distribution, and storage improvements. A plan
submitted under this subsection may include for approval a targeted
economic development project described in section 11 of this
chapter.
(b) Following notice and hearing, and not more than two hundred
ten (210) days after the public utility petitions the commission under
subsection (a), the commission shall issue an order on the petition.
The order must include the following:
(1) A finding of the best estimate of the cost of the eligible
improvements included in the plan.
(2) A determination whether public convenience and necessity
require or will require the eligible improvements included in the
plan.
(3) A determination whether the estimated costs of the eligible
improvements included in the plan are justified by incremental
benefits attributable to the plan.
If the commission determines that the public utility's seven (7) year
plan is reasonable, the commission shall approve the plan and
designate the eligible transmission, distribution, and storage
improvements included in the plan as eligible for TDSIC treatment.
(c) A public utility that provides gas service may petition the
commission to approve a targeted economic development project as
part of the public utility's seven (7) year plan under subsection (a).
The commission shall review within sixty (60) days the part of the
petition concerning the targeted economic development project and
approve the inclusion of the project if the commission determines
that the inclusion of the project is consistent with the requirements
of this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-11
Extension of gas service to targeted economic development project;
approval by Indiana economic development corporation of costs as
TDSIC costs; rural gas service
Sec. 11. (a) The extension, construction, addition, or improvement
of the plant and equipment of a public utility that is installed to
provide gas service to a targeted economic development project is
used and useful in the public service.
(b) A public utility shall apply to the Indiana economic
development corporation for approval to treat costs associated with
a targeted economic development project as TDSIC costs. Costs
approved by the Indiana economic development corporation shall be
treated as TDSIC costs and may be recovered through a TDSIC
under section 12 of this chapter. The TDSIC revenues associated
with a targeted economic development project shall not be included
in a public utility's total retail revenues for purposes of determining
an aggregate increase under section 14 of this chapter.
(c) Notwithstanding any law or rule governing extension of
service, a public utility that provides gas service may, on a
nondiscriminatory basis, extend service in rural areas without a
deposit or other adequate assurance of performance from the
customer, to the extent that the extension of service results in a
positive contribution to the utility's overall cost of service over a
twenty (20) year period. However, if the public utility determines
that the extension of service to a targeted economic development
project will not result in a positive contribution to the utility's overall
cost of service over a twenty (20) year period, the public utility may
require a deposit or other adequate assurance of performance from:
(1) the developer of the targeted economic development project;
or
(2) a local, regional, or state economic development
organization.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-12
Commission hearing and order; examination by office of utility
consumer counselor and intervenors
Sec. 12. (a) Not more than ninety (90) days after a public utility
files a petition under section 9 of this chapter, the commission shall
conduct a hearing and issue an order on the petition.
(b) Not more than sixty (60) days after a public utility files a
petition under section 9 of this chapter, the office of the utility
consumer counselor and other intervenors, if any, may:
(1) examine the information of the public utility to confirm that
the proposed transmission, distribution, and storage system
improvements comply with this chapter; and
(2) report its findings to the commission.
(c) If the commission determines that the petition satisfies the
requirements of this chapter and the capital expenditures and TDSIC
costs are reasonable, the commission shall approve the petition,
including:
(1) capital expenditures;
(2) timely recovery of TDSIC costs, including costs associated
with a targeted economic development project, through a
TDSIC; and
(3) if requested, authority to defer TDSIC costs under section
9(b) of this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-13
Determination of pretax return
Sec. 13. (a) For purposes of calculating the TDSIC costs of a
public utility, the commission shall determine an appropriate pretax
return for the public utility. In determining the appropriate pretax
return, the commission may consider the following factors:
(1) The current state and federal income tax rates.
(2) The public utility's capital structure.
(3) The actual cost rates for the public utility's long term debt
and preferred stock.
(4) The public utility's cost of common equity determined by
the commission in the public utility's most recent general rate
proceeding.
(5) Other information that the commission determines is
necessary.
(b) The commission shall adjust a public utility's authorized return
for purposes of IC 8-1-2-42(d)(3) or IC 8-1-2-42(g)(3) to reflect
incremental earnings from an approved TDSIC.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-14
Total retail revenues; average aggregate increase
Sec. 14. (a) The commission may not approve a TDSIC that
would result in an average aggregate increase in a public utility's
total retail revenues of more than two percent (2%) in a twelve (12)
month period. For purposes of this subsection, a public utility's total
retail revenues do not include TDSIC revenues associated with a
targeted economic development project.
(b) If a public utility incurs TDSIC costs under the public utility's
seven (7) year capital expenditure plan that exceed the percentage
increase in a TDSIC approved by the commission, the public utility
shall defer recovery of the TDSIC costs as set forth in section 9(b) of
this chapter.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-15
Revised rate schedule following general increase in rates and
charges
Sec. 15. A public utility that has implemented a TDSIC under this
chapter shall file revised rate schedules resetting the charge if new
basic rates and charges become effective for the public utility
following a commission order authorizing a general increase in rates
and charges that includes in the public utility's rate base eligible
transmission, distribution, and storage system improvements
reflected in the TDSIC.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-16
Exclusions from general increase in basic rates and charges
Sec. 16. (a) For purposes of this chapter, the following are not a
general increase in basic rates and charges under IC 8-1-2-42(a):
(1) The filing of a TDSIC.
(2) A change in a TDSIC.
(3) The deferral of depreciation expenses, operation and
maintenance expenses, property taxes, or post in service
allowance for funds used during construction under section 9(b)
of this chapter.
(b) This chapter does not limit:
(1) a public utility's ability to recover eligible transmission,
distribution, and storage system improvements in a general
retail rate case; or
(2) the commission's valuation of utility property under
IC 8-1-2-6.
As added by P.L.133-2013, SEC.5.
IC 8-1-39-17
Adoption of rules
Sec. 17. The commission may adopt by rule under IC 4-22-2 or by
order other procedures not inconsistent with this chapter that the
commission finds reasonable or necessary to administer a TDSIC.
As added by P.L.133-2013, SEC.5.
Disclaimer: These codes may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.