There is a newer version of the Connecticut General Statutes
2009 Connecticut Code
Title 16 Public Service Companies
Chapter 283 Department Of Public Utility Control: Telegraph, Telephone, Illuminating, Power And Water Companies
Sec. 16-258c. Dual-fuel capability requirements for electric generating facilities.
Sec. 16-258c. Dual-fuel capability requirements for electric generating facilities. On and after January 1, 2008, the Department of Public Utility Control shall order
and direct that any intermediate or base load electric generating unit owned by an electric
distribution company or covered by a bilateral contract with an electric distribution
company that is fueled by either oil or natural gas, with a rating of not less than sixty-five megawatts, shall have the actual ability to operate on demand for a forty-eight-hour
period using either oil or natural gas, provided the department may determine that dual
fuel capability is not required for a specific generating unit if imposing such requirement
is not in the best interest of Connecticut consumers.(P.A. 07-242, S. 4.)
History: P.A. 07-242 effective June 4, 2007.
Disclaimer: These codes may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.