There is a newer version of the California Code
2009 California Water Code - Section 1490-1491 :: Article 7. Priority Of Applications For Hydroelectric Power ..
WATER CODESECTION 1490-1491
1490. Applications or petitions for retrofit hydroelectric plants at existing dams, canals, or conduits where the streamflow regime will not be changed and where there will be no significant adverse environmental impacts shall receive expedited processing by the board. The applicant shall not be required to show a need for the power that will be generated by the plant unless protests are filed that are not resolved. 1491. Applications for hydroelectric powerplants with a generating capacity not to exceed five megawatts, which do not impound water during times of high waterflow to be used to generate power during times of low waterflow, and which will not have any significant adverse environmental impacts shall receive expedited processing by the board. The applicant shall not be required to show a need for the power that will be generated by the plant unless protests are filed against the project that are not resolved.
Disclaimer: These codes may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.