Court Description: ORDER DENYING DEFENDANT'S MOTION FOR SUMMARY JUDGMENT, denying 10 . Signed by Judge Robert J. Bryan. (JL)

Download PDF
Zurich American Insurance Company v. Certain Underwriters at Lloyd's, London Doc. 34 1 2 3 4 5 6 7 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT TACOMA 8 9 10 11 ZURICH AMERICAN INSURANCE COMPANY, 12 Plaintiff, 13 14 15 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT v. CERTAIN UNDERWRITERS AT LLOYD’S LONDON, Defendant. 16 17 CASE NO. C12-5749 RJB This matter comes before the Court on Defendant Certain Underwriters at Lloyd’s 18 London (Underwriters) Motion for Summary Judgment. Dkt. 10. The Court has considered the 1 19 pleadings in support of and in opposition to the motion and the record herein. 20 21 22 1 Plaintiff Zurich American Insurance Company moves to strike the Declaration of 23 Stephen M. Todd. Dkt. 16 pp. 20-25. The Court has reviewed the declaration. It amounts to no more than another lawyer’s legal opinions and does not aid the Court in the resolution of the 24 issues. The Declaration has not been considered in the resolution of this matter. ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 1 Dockets.Justia.com 1 2 INTRODUCTION AND BACKGROUND This is an insurance contribution action brought by Plaintiff Zurich American Insurance 3 Company (Zurich) seeking recovery against Underwriters for amounts that Zurich paid to defend 4 and indemnify its named insured Stan Palmer Construction (Palmer Construction) for bodily 5 injury claims by an employee of a subcontractor. 6 Zurich’s complaint asserts that Zurich insured Palmer Construction as the general 7 contractor on a bridge construction project in Tacoma, Washington. Palmer Construction 8 contracted with A.R.M. Construction, which, in turn, contracted with a second-tier subcontractor 9 known as K&L Rebar to replace the East L Street Bridge. Dkt. 1-2 p. 3. Jack Wooldridge, 10 An employee of K&L Rebar, fell and suffered bodily injury while employed on the project. Id. 11 The contract between Palmer Construction and A.R.M. Construction provided that 12 A.R.M., as a subcontractor, would maintain an additional insured endorsement naming Palmer 13 Construction as an “additional insured.” Dkt. 1-2 p. 4. The complaint states that the additional 14 insured endorsement extends coverage to an additional insured (Palmer Construction) for its 15 liability “arising out of” the work of the named insured (A.R.M.). Actual negligence of the 16 named insured is not a pre-requisite to coverage for the additional insured. Id. 17 Underwriter’s issued a Commercial General Liability policy of insurance to A.R.M. 18 Construction and Allen Mettler d/b/a A.R.M. The additional insured endorsement in this policy 19 extends coverage to parties qualifying as additional insureds, but only to the extent that the 20 claims against the additional insured arise out of alleged or actual negligent acts or omission of 21 the named insured. Dkt. 11-1 p. 21. Specifically, the policy provides as follows: 22 23 4. ADDITIONAL ASSURED: It is understood and agreed that wherever the “Assured” has contracted or agreed to protect any individual, firm, corporation or governmental entity shall be deemed an Additional Assured under this insurance, subject to the following: 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 2 1 2 3 4 5 (a) the liability of the Insurer(s) as respects such Additional Assured shall be limited to the amount of insurance contracted or agreed to be carried by the “Assured” and in no event shall such liability in the aggregate exceed the Insurer(s)’ limits of liability expressed in ITEM IV. Of the DECLARATION PAGE; and (b) the coverage afforded such Additional Assured shall be subject to the terms, conditions and exclusions of this insurance, and shall also be restricted to defense of and liability for “bodily injury” and “property damage” claims arising out of alleged or actual negligent acts or omission of the “Assured,” and 6 7 (c) the coverage afforded such Additional Assured applies solely to ongoing operations of the “Assured” and excludes liability arising out of the “products hazard” and “completed operations hazard.” 8 Dkt. 11-1 p. 21 (emphasis added). The Assured is defined as A.R.M. Construction, and Palmer 9 Construction is an Additional Assured.2 Id. 10 According to Zurich’s complaint, Wooldridge filed the underlying suit against Palmer 11 Construction and later filed an amended complaint adding A.R.M. Construction as an additional 12 defendant. Dkt. 1-2 p. 5. The amended complaint alleges that A.R.M. Construction 13 subcontracted portions of the work to be performed to Plaintiff’s employer, K&L Rebar. 14 Addressing both Defendants the amended complaint alleges “Mr. Wooldridge's fall was solely 15 and proximately due to the Defendants' breach of their statutory, common law and contractual 16 duties of care to Plaintiff in failing to provide adequate fall protection.” Id. A second amended 17 complaint was filed adding Allen R. Mettler, d/b/a A.R.M. Construction as a defendant. Id. 18 A.R.M. Construction tendered the lawsuit to its insurer Underwriters seeking defense and 19 indemnity as the named insured on the Underwriters policy. Underwriters accepted the tender 20 under a reservation of rights and assigned defense counsel to defend A.R.M. Dkt. 11-2. 21 22 23 24 2 Apparently the parties use “Insured” and “Assured” interchangeably. ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 3 1 Palmer Construction also tendered the lawsuit to Underwriters seeking defense and 2 indemnity as an additional insured on the Underwriters policy. Underwriters accepted the tender 3 under a reservation of rights stating: 4 It appears that Palmer Construction qualifies as an additional insured under ARM Construction's insurance policy with Underwriters. However, coverage for Stan Palmer Construction as an additional insured is limited to defense of and liability for bodily injury arising out of alleged or actual negligent acts or omissions of ARM Construction. There is no coverage under the Underwriters policy for any separate negligence Stan Palmer Construction may have in the above matter. Therefore, Underwriters denies coverage to Stan Palmer Construction for its separate negligence in the above matter. 5 6 7 8 Dkt. 11-3 p. 5. Underwriters retained defense counsel to represent Palmer Construction. Id. at p. 9 7. 10 In May of 2011, Wooldridge entered into a settlement with A.R.M. and Allen Mettler. 11 Underwriters paid $100,000 to Jack Wooldridge, in exchange for a release of Allen Mettler and 12 A.R.M. only. Neither Palmer Construction nor Zurich was a party to the settlement. Dkt. 1-2 p. 13 6; Dkt. 12-1. The parties to the Release and Settlement (Wooldridge, A.R.M Construction, 14 Mettler, and Underwriters) “expressly stipulated that there is no liability on the part of defendant 15 A.R.M. Construction. It is further stipulated that plaintiff has insufficient evidence to establish a 16 prima facie case of liability against A.R.M. Construction, and any and all claims against A.R.M. 17 Construction would be dismissed pursuant to a motion for summary judgment.” Dkt. 12-1 p. 17. 18 Concerning Palmer Construction, the Release and Settlement states: 19 … It is further stipulated that neither A.R.M. Construction nor Allen Mettler committed any act or omission giving rise to any vicarious liability on the part of Stan Palmer Construction for any of Plaintiffs alleged injuries or damages. 20 21 22 23 This Release and Settlement Agreement does not release any claims or actions that Jack Wooldridge has against Stan Palmer Construction, Inc. individually for its sole negligence. Should it be determined in the underlying action that Stan Palmer Construction, Inc. is found to be liable based upon any allocation of fault arising from any act or omission of A.R.M. Construction, plaintiff will not execute or attempt to collect against any judgment or settlement based upon said allocation of fault. As a 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 4 1 2 result, any remaining claims by plaintiff in the underlying action shall be based upon the sole negligence of Stan Palmer Construction and no claims of joint and several liability between A.R.M. Construction and Stan Palmer Construction shall be asserted by plaintiff in the underlying action. 3 Dkt. 12-1 p. 18. 4 Palmer Construction was notified by letter, dated May 19, 2011, that any and all 5 liabilities on the part of A.R.M. Construction had settled and that Underwriters had no further 6 obligation to defend or indemnify Palmer Construction. Dkt. 12-1 p. 23. As an explanation, the 7 letter states: 8 9 At this time you are respectfully advised that any and all claims raised against Underwriters' named insured, ARM Construction have been resolved. A copy of the release executed between Plaintiff and ARM Construction is enclosed. 10 11 12 13 Pursuant to the express language set forth in this release, any and all liabilities on the part of ARM Construction have been extinguished. Moreover, there is an express admission contained within the release stating that there is no liability for any of the injuries or losses claimed by Plaintiff associated with any act or omission arising out of ARM Construction's acts or omissions. In fact, the agreement goes on to state Plaintiffs will not seek any recovery in the underlying action based upon any potential allegations attributable to ARM Construction. 14 15 As a result, and as set forth in the release, the only potential claims for liability raised by Plaintiffs at this time involve the sole negligence of Zurich's insured, SPCI [Palmer Construction]. 16 17 18 19 20 21 Based upon this express release, it is clear that your insured will not be exposed to any claims arising out of any act or omission on the part of ARM Construction. Given the expressed terms of this Release, Underwriters believes it has no further obligation to provide any defense or indemnity to SPCI [Palmer Construction]. Consequently, it is requested that Zurich immediately accept the full defense and indemnification of its insured in regard to the underlying lawsuit. Underwriters will instruct assigned counsel for SPCI [Palmer Construction] that Underwriters will no longer be responsible for any further defense costs or expenses associated with the defense of SPCI [Palmer Construction] effective May 31, 2011. 22 Dkt. 12-1 p. 23. 23 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 5 1 The complaint in the underlying action was never further amended to reflect A.R.M.’s 2 settlement with Wooldridge or any changes to the claims made in the previous complaints. 3 Zurich took up the defense of Palmer Construction and ultimately settled Wooldridge’s 4 claim for $350,000. Zurich also paid $40,994.41 in defense costs. Dkt. 1-2 p. 6. Palmer 5 Construction assigned all rights against Underwriters to Zurich. Dkt. 1-2 p. 11. 6 Zurich alleges as causes of action against Underwriters (1) breach of contract for 7 termination of the defense of Palmer Construction, (2) equitable subrogation because the claims 8 against Palmer Construction arose out of A.R.M.’s alleged or actual negligent acts or omissions, 9 and/or A.R.M’s work and operations for Palmer Construction, (3) equitable contribution on the 10 same basis as the subrogation claim. Dkt. 1-2 pp. 6-11. 11 Underwriters brought the instant motion for summary judgment asserting that it fulfilled 12 all its obligations to the additional insured Palmer Construction. 13 SUMMARY JUDGMENT STANDARDS 14 Summary judgment is appropriate only when the pleadings, depositions, answers to 15 interrogatories, affidavits or declarations, stipulations, admissions, answers to interrogatories, 16 and other materials in the record show that “there is no genuine issue as to any material fact and 17 the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). In assessing a 18 motion for summary judgment, the evidence, together with all inferences that can reasonably be 19 drawn therefrom, must be read in the light most favorable to the party opposing the motion. 20 Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587 (1986); County of 21 Tuolumne v. Sonora Cmty. Hosp., 236 F.3d 1148, 1154 (9th Cir. 2001). 22 The moving party bears the initial burden of informing the court of the basis for its 23 motion, along with evidence showing the absence of any genuine issue of material fact. Celotex 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 6 1 Corp. v. Catrett, 477 U.S. 317, 323 (1986). On those issues for which it bears the burden of 2 proof, the moving party must make a showing that is sufficient for the court to hold that no 3 reasonable trier of fact could find other than for the moving party. Idema v. Dreamworks, Inc., 4 162 F.Supp.2d 1129, 1141 (C.D. Cal. 2001). 5 To successfully rebut a motion for summary judgment, the non-moving party must point 6 to facts supported by the record which demonstrate a genuine issue of material fact. Reese v. 7 Jefferson Sch. Dist. No. 14J, 208 F.3d 736 (9th Cir. 2000). A “material fact” is a fact that might 8 affect the outcome of the suit under the governing law. Anderson v. Liberty Lobby, Inc., 477 9 U.S. 242, 248 (1986). Where reasonable minds could differ on the material facts at issue, 10 summary judgment is not appropriate. See v. Durang, 711 F.2d 141, 143 (9th Cir. 1983). A 11 dispute regarding a material fact is considered genuine “if the evidence is such that a reasonable 12 jury could return a verdict for the nonmoving party.” Anderson, at 248. The mere existence of a 13 scintilla of evidence in support of the party's position is insufficient to establish a genuine 14 dispute; there must be evidence on which a jury could reasonably find for the party. Id., at 252. 15 The issues presented are governed by Washington State law. See Insurance Co. N. 16 Am. v. Federal Express Corp., 189 F.3d 914, 919 (9th Cir. 1999). Washington State law is clear 17 that the interpretation of policy language contained in an insurance contract is a question of law. 18 Butzberger v. Foster, 151 Wn.2d 396, 401 (2004); State Farm General Ins. Co. v. Emerson, 102 19 Wn.2d 477, 480 (1984). Where there are no material facts in dispute, interpretation of the 20 insuring language at issue is appropriately decided on summary judgment. See American 21 Bankers Ins. v. N.W. Nat. Ins., 198 F.3d 1332 (11th Cir. 1999). 22 23 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 7 1 2 WASHINGTON INSURANCE LAW The criteria for interpreting insurance policies in Washington are well settled. Courts 3 construe insurance policies as contracts. Weyerhaeuser Co. v. Commercial Union Ins. Co., 142 4 Wn.2d 654, 665-66 (2000). Courts consider the policy as a whole and give it a fair, reasonable, 5 and sensible construction as would be given to the contract by the average person purchasing 6 insurance. Id. If the policy language is clear and unambiguous, courts must enforce it as written 7 and may not modify it or create ambiguity where none exists. Quadrant Corp. v. Am. States Ins. 8 Co., 154 Wn.2d 165, 171 (2005). A clause is only considered ambiguous if it is susceptible to 9 two or more reasonable interpretations. Id. If an ambiguity exists, the clause is construed in 10 favor of the insured. Id. 11 Washington courts have long held that the duty to defend under an insurance contract is 12 different from and broader than the duty to indemnify. Am. Best Food, Inc. v. Alea London, Ltd., 13 168 Wn.2d 398, 404 (2010). The duty to defend arises when a complaint against the insured, 14 construed liberally, alleges facts which could, if proven, impose liability upon the insured within 15 the policy's coverage. Truck Ins. Exch. v. VanPort Homes, Inc., 147 Wn.2d 751, 759 (2002). 16 When the facts or the law affecting coverage are disputed, the insurer may defend under a 17 reservation of rights until coverage is settled in a declaratory action. Am. Best Food, at 404. An 18 insurer must defend until it is clear that the claim is not covered. Nat'l Sur. Corp. v. Immunex 19 Corp., 162 Wn.App. 762, 774 (2011). The duty to indemnify, by contrast, exists only if the 20 policy actually covers the insured's liability. Am. Best Food, at 405. 21 22 23 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 8 1 2 INSURANCE DISPUTE AND ISSUES OF FACT AND LAW Underwriters seeks a summary judgment ruling that it’s duty to defend Palmer 3 Construction ended when its insured A.R.M. entered into a settlement with the underlying 4 plaintiff Wooldridge. 5 The Washington Supreme Court recently summarized an insurer's duty to defend as 6 follows: 7 8 9 10 11 12 13 The duty to defend is triggered if the insurance policy conceivably covers allegations in the complaint. The duty to defend arises when a complaint against the insured, construed liberally, alleges facts which could, if proven, impose liability upon the insured within the policy's coverage. An insurer may not put its own interests ahead of its insured's. To that end, it must defend until it is clear that the claim is not covered.... The insurer is entitled to investigate the facts and dispute the insured's interpretation of the law, but if there is any reasonable interpretation of the facts or the law that could result in coverage, the insurer must defend. When the facts or the law affecting coverage is disputed, the insurer may defend under a reservation of rights until coverage is settled in a declaratory action. Once the duty to defend attaches, insurers may not desert policyholders and allow them to incur substantial legal costs while waiting for an indemnity determination. 14 Am. Best Food, Inc. v. Alea London, Ltd., 168 Wn.2d 398, 404-05 (2010). 15 Underwriters does not dispute that the claims in Wooldridge’s underlying complaint 16 triggered the duty to defend the additional insured, Palmer Construction, or that the complaint 17 was not amended after A.R.M.’s settlement with Wooldridge. The coverage afforded Palmer 18 Construction as an additional insured is restricted to defense of and liability for bodily injury 19 claims arising out of alleged or actual negligent acts or omission of the Assured A.R.M. It is the 20 settlement agreement between Underwriters’ insured A.R.M. and Wooldridge that Underwriters 21 claims eliminates the duty to defend Palmer Construction. Underwriters asserts that the 22 settlement eliminated/resolved the claimed negligence of A.R.M. and thus, the remaining claims 23 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 9 1 against Palmer Construction cannot arise out of the alleged negligent acts or omissions of 2 A.R.M. 3 This argument is not persuasive. Underwriters cannot dispute that Palmer Construction 4 was not a party to this settlement and that during the course of the negotiations of this settlement, 5 Palmer Construction was an additional insured of Underwriters. The Additional Insured 6 Endorsement does not require that A.R.M. be the subject of a lawsuit or otherwise be held liable 7 for its own negligence. Rather, Palmer construction is covered under the endorsement “for 8 claims arising out of alleged or actual negligent acts or omissions” of A.R.M. Thus, even if 9 A.R.M. is no longer a party to the underlying action, and even if found not to have been 10 negligent, it remains possible that the claims against Palmer Construction arise out of the alleged 11 negligence of A.R.M. The phrase “arising out of” is unambiguous and has a broader meaning 12 than “caused by” or “resulted from.” It ordinarily means “originating from,” “having its origin 13 in,” “growing out of,” or “flowing from.” Munn v. Mut. of Enumclaw Ins. Co., 73 Wn.App. 321, 14 325 (1994). “Arising out of” does not mean “proximately caused by” but requires a mere 15 “causal connection.” Australia Unlimited, Inc. v. Hartford Cas. Ins. Co., 147 Wn.App. 758, 77316 74 (2008). 17 It is well settled Washington law that both a general contractor and a subcontractor are 18 responsible to ensure compliance with safety regulations within their areas of control. The 19 general contractor and a subcontractor each owe distinct duties to workers with respect to 20 workplace safety. Gilbert H. Moen Co. v. Island Steel Erectors, Inc., 128 Wn.2d 745, 756 21 (1996). Although the duties owed by the general contractor and subcontractor to workers for 22 workplace safety are distinct, they are concurrent responsibilities to workers. Although there 23 may be independent negligence, that should not equated with “sole negligence.” Id. at 757. The 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 10 1 duty to observe safety standards is a shared duty. Id.; Stute v. P.B.M.C., Inc., 114 Wn.2d 454, 2 464 (1990). 3 Here, regardless of the release and settlement, the underlying complaint alleges claims 4 against Palmer Construction that may have a causal connection to the alleged negligence of 5 A.R.M. Both the subcontractor and general contractor may be concurrently negligent. Indeed, 6 the Release and Settlement Agreement recognizes the possibility that Palmer Construction may 7 be subject to liability in the underlying action based upon an allocation of fault arising from an 8 act or omission of A.R.M. Underwriters has not established the lack of a causal connection 9 between alleged negligence of A.R.M. and the claims against Palmer Construction. The motion 10 for summary judgment should be denied. 11 It also appears that there are issues of fact that Underwriters may have breached a duty to 12 its insured Palmer Construction by placing its own interests ahead of that of its insured. See 13 Ledcor Industries (USA), Inc. v. Mutual of Enumclaw Ins. Co., 150 Wn.App. 1, 9 (2009). 14 Washington law favors a judicial determination of the duty to defend. Here, Underwriters 15 unilaterally terminated its defense of its insured. Through its own acts of negotiating a 16 settlement on behalf of its insured A.R.M. to the detriment of its additional insured Palmer 17 Construction, Underwriters may have placed its own interests ahead of the interests of its 18 insured, Palmer Construction. 19 There also remain unresolved issues regarding the duty to indemnify. It is unknown 20 whether Palmer Construction settled the underlying action in part for claims arising out of the 21 alleged negligence of A.R.M. Indeed the record is silent as to risks to Palmer Construction that 22 led to a much more substantial settlement with Wooldridge than that obtained by A.R.M. 23 It is not clear from the record that Underwriters is entitled to the dismissal it seeks. 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 11 1 2 CONCLUSION For the foregoing reasons, Defendant Underwriters is not entitled to summary judgment. 3 Therefore, it is hereby ORDERED: 4 Defendant Certain Underwriters at Lloyd’s London’ Motion for Summary Judgment 5 (Dkt. 10) is DENIED. 6 7 8 9 Dated this 24th day of June, 2013. A ROBERT J. BRYAN United States District Judge 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ORDER DENYING DEFENDANT’S MOTION FOR SUMMARY JUDGMENT- 12

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.