FERGUSON et al v. VALERO ENERGY CORPORATION et al, No. 2:2006cv00540 - Document 248 (E.D. Pa. 2009)

Court Description: MEMORANDUM AND OPINION. SIGNED BY HONORABLE MARY A. MCLAUGHLIN ON 6/15/09. 6/16/09 ENTERED AND COPIES MAILED, E-MAILED.(fdc)

Download PDF
IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF PENNSYLVANIA KENNETH L. FERGUSON, et al. : : : : : v. VALERO ENERGY CORP., et al. CIVIL ACTION NO. 06-540 MEMORANDUM McLaughlin, J. June 15, 2009 This is a wrongful death and survivorship action brought on behalf of a worker killed on November 5, 2005, at an accident at the Delaware City Refinery ( DCR ), now owned by defendant Valero Energy Corporation ( Valero ). The defendants have filed a motion for partial summary judgment as to the plaintiffs claims for punitive damages. The Court will grant the defendants motion. I. Summary Judgment Record1 This case concerns the death of John Jerry Ferguson, Jr., an experienced boilermaker. Mr. Ferguson was killed in an accident at DCR, near Wilmington, Delaware, on the night of November 5, 2005. Mr. Ferguson was twenty-nine years old. Mr. Ferguson was survived by two brothers, Kenneth and Michael 1 The Court takes these facts from the evidence provided by the parties in conjunction with their briefs on this motion. Where facts are disputed or characterized differently by the parties, the Court notes the dispute or difference in characterization. Ferguson, and his father, John Jerry Ferguson, Sr. At the time of the accident, Mr. Ferguson was an employee of Matrix Services Industrial Contractors, Inc. ( Matrix ). The first plaintiff in this suit is Kenneth Ferguson, who brings claims under the Delaware Survivor's Act, 10 Del. Code § 3701, as administrator of his brother's estate and on behalf of any statutory beneficiaries. Am. Compl. ¶ 3. John Jerry Ferguson, Sr., is the other plaintiff in this action, bringing claims under the Delaware Wrongful Death Act, 10 Del. Code § 3724, in his own right and as the primary beneficiary under the statute. Am. Compl. ¶ 2. After this suit was filed, John Jerry Ferguson, Sr., passed away on April 22, 2006. As a component of these claims, the plaintiffs seek an award of punitive damages.2 The defendants here are two companies that owned and operated the DCR: ( PRG ). Valero and Premcor Refining Group, Inc. PRG owns DCR; Valero merged with PRG on September 1, 2005, and therefore DCR is a Valero refinery. Defs Br. at 2-3. The plaintiffs claim that Delaware law entitles them to punitive damages because of the defendants admissions of intentional, willful, knowing, and consciously deliberate conduct. Opp n at 3. The defendants assert that the record 2 The death of Mr. Lattanzi was the subject of an action that was previously consolidated with this case. The parties to that case stipulated to its dismissal on January 9, 2009, leaving only the parties bringing claims on the basis of Mr. Ferguson s death as the only plaintiffs in the case. 2 reflects only ordinary negligence, at most, and fails to provide facts sufficient to create a genuine issue of material fact as to intentional or reckless actions undertaken by the defendants in relation to the precise harm to the plaintiffs decedent. A. Safety Policies in Place during Turnaround of the Unit 36 Reactors On November 5, 2005, Mr. Ferguson was working on a maintenance project involving at Unit 36-R-1. Unit 36-R-1 is one of three silo-shaped reactor vessels that are part of the hydrocracker unit at DCR. The other two reactor vessels are referred to as 36-R-2 and 36-R-3. The three reactors are arranged in line with each other, with a metal deck providing access to all three reactors. At the center of the Unit 36-R-1 reactor s deck is a manway entrance. When the reactor is in use, a large L shaped pipe (the top elbow ) is attached to both the top of the manway entrance and to a nearby pipe. When the reactor is shut down for maintenance, the top elbow is removed to permit entry into the reactor for maintenance purposes. Defs Exs. 15-19; Def. Br. at 3-6. In the fall of 2005, DCR underwent a turnaround, which is the term used for the period of time when certain units of a refinery are out of service while workers perform maintenance work on the unit. PRG contracted with Matrix and Catalyst Handling Services ( Catalyst Handling ), among other 3 companies, to perform certain portions of the maintenance work on the Unit 36 reactors. PRG also contracted with Allied Services, Inc. and ProTech Engingeering, Inc. ( ProTech ) to coordinate the work of contractors like Matrix and Catalyst Handling. Exs. 26, 27. Defs Andy Tedeschi, of Allied Services, and Bill Pyatt, of ProTech, were denominated by the defendants as contract administrators for Unit 36 and oversaw many aspects of the turnaround relating to Unit 36. Defs Exs 28 at 14-17; 29 at 19- 20. DCR implemented a safety plan as part of the planning process for the turnaround. The safety plan is a document that includes specific safety expectations, including instructions on the issuance of work permits and confined space entry requirements. The plan provided that mutual understanding is required for all jobs where permits are required. Defs Ex. 32 at 3. In addition to the safety plan, DCR issued Bid Books to contractors who wished to bid on the work for the different units at DCR. Defs Ex. 33. The Bid Book for Unit 36 contains a list of tasks that a contractor would need to complete during the turnaround, detailed schematics of the reactor, and certain safety warnings. Among the safety warnings are two entries which read: This reactor requires full PPE [Personal Protective Equipment] for inert entry and Do not enter this reactor 4 without stand-by personnel/safety equipment/100% tie-off & correct monitoring. Id. at VAL07805. Matrix received a copy of both the safety plan and the Bid Book for Unit 36. Opp n at 6. The defendants convened two meetings in August of 2005 at which the scope of work for the reactors at Unit 36 was discussed. David Huppmann, the turnaround project manager for Matrix, and Dominic Gricco, a Matrix boilermaker general foreman, appear as required attendees on an email notification of those meetings. 35. Defs Ex. David Huppman s deposition testimony recites that he does not recall attending those meeting. Defs Ex. 37 at 96:6-22.3 Another email discusses a presentation by Catalyst Handling regarding safety coordination. Dominic Gricco is again among the names of the required attendees. Defs Ex. 38. DCR provided shift schedules for the work at Unit 36-R1, which identified the job steps for each of the hydrocracker reactors and noted which steps required the use of fresh air equipment. Defs Ex. 39. The shift schedule for work at Unit 36-R-1 for the night of the accident states that this reactor requires full PPE for inert entry. 3 Id. at VAL05114. The The plaintiffs brief in opposition to the motion for partial summary judgment states that David Huppman recalled attending one of these two meetings. The brief, however, provides no citation to Huppman s testimony on this point. Although the plaintiffs occasionally cite to Huppman s testimony throughout their brief, they have not included that testimony in their submissions to the Court. 5 plaintiffs note that several witnesses have testified at deposition that Valero managers would often change the job step sequence or job requirements, just as they had changed the job step sequence on the night of the accident. Opp n at 7. William Hunt, manager of technical services at DCR, testified that the job step sequence for the day of the accident was altered at a meeting held the day before the accident. 29 at 90:3-93:16. Pls Ex. Andre Tedeschi, a turnaround planner at DCR, also testified to a schedule change for the job step sequence of the night of the accident. Pls Ex. 9 at 98:19-99:2. Tedeschi further testified that work on the top elbow proceeded at times without fresh air barricades in place and without fresh air breathing apparatuses in place. Id. at 192. Mr. Tedeschi also testified, however, that he was not personally involved in the determination of which aspects of the turnaround should be designated as a fresh air job. Id. at 194:6-7. In July of 2005, prior to Valero s takeover, DCR instituted revisions to a set of standing instructions and permit forms and conducted training of refinery operations personnel and contractors. Defs Ex. 41 at VAL05284-05287. Standing instruction 2.5.12 contains DCR s Confined Space Written Program, in which reactors are listed among the examples of confined spaces. Defs Ex. 43 at VAL11719. The standing instructions state that most confined spaces in the Delaware City Refinery 6 will be classified as permit required confined spaces and that such spaces contain or have the potential to contain a hazardous atmosphere. Id. The standing instructions further state that entry into confined spaces shall only be allowed after consideration of an alternate method of performing the work from outside the space and that an entry permit must be prepared to document that the space is safe to enter before any entry of a permit required confined space is authorized. Id. at VAL 11724. The standing instructions require the development of a confined space pre-plan prior to entry into a confined space. Pre-plan meetings were to be held in order to provide guidance to the permit issuer, the stand-by person(s) and the entrants regarding the planned scope of work and the expected hazards and safeguards. One result of the pre-plan meeting was to be a written description of the planned permit required confined space entry to identify and eliminate any hazards and to communicate [such] information to all parties involved prior to the start of the work. Id. at VAL 11723. A confined space pre-plan meeting report outlines the scope of maintenance for Unit 36-R-1. Defs Ex. 44. This document includes a sketch of the reactor with notes on the dimensions of certain of its components. On a page dedicated to the catalyst dumping phase, the document contains a section titled Atmospheric Monitoring Requirements, which lists 7 nitrogen among a group of gases to be tested upon initial entry. The same notation is found on a page dedicated to the task of cleaning the reactor using a soda ash wash and catalyst loading. Id. During discovery, counsel for Matrix produced a copy of this same pre-plan report that was in its possession after the accident. Defs Ex. 45. DCR s standing instruction 2.5.1 governs the issuance of safework, hot work and confined space entry permits. Ex. 47. Defs The instruction describes the requirement of mutual understanding as a prerequisite to the issuance of a permit. As part of the mutual understanding requirement, a signer and the foreman/craftsmen must review the permit and jointly visit the job site, and must completely understand the conditions, limitations and precautions of the issued permit. Id. at VAL04966 (emphasis in original). Standing instruction 2.5.8 governs procedures for performing fresh air work. Defs Ex. 46. The instruction states that [w]ork activities in known or potentially IDLH (Immediately Dangerous to Life or Health) atmospheres require the use of airsupplied fresh air respiratory protection equipment. These atmospheres could include . . . oxygen deficient atmospheres involving nitrogen . . . . Id. at VAL 04392. The same instruction requires air-supplied respiratory protection zones to be roped off at a sufficient distance from the source with red & 8 white barrier tape imprinted with HAZARDOUS AREA KEEP OUT to prevent unauthorized personnel from entering [the] area. VAL 04395. Id. at The instructions list barricading or taping off area as one of the responsibilities of the worker and/or contractor. Id. at VAL04397. A separate section lists the preparation of permits for a job as a responsibility of the operating personnel. Id. at VAL 04396. Mutual understanding of safety requirements by both operations personnel and craftsmen or contractors was required under the standing instructions. Defs Ex. 47 at VAL 04966. A written acknowledgment and mutual understanding agreement signed on October 16, 2005, provided for one DCR operator to issue a permit and another operator to perform the required job site visit under the mutual understanding policy. Defs Ex. 48. The agreement also states that when all parties have come to a mutual understanding regarding the permit requirements, work may then begin. Id. As with the job step sequences discussed above, the parties offer competing evidence as to the fidelity with which these standing instructions were treated. Bill Hughes, the night shift project manager for the turnaround, testified that he attended nightly meetings to discuss safety. [A]t some point in time, we had a discussion about whether or not this mutual understanding was taking place in the field, and at this safety 9 meeting, which included folks from operations and the craft foreman and the contract administrators and also Valero safety people . . . we discussed the fact that it didn t look like mutual understanding was taking place in the field. . . . Ex. 3 at 33:13-24. Pls This testimony was offered in response to questioning by the plaintiffs concerning the enforcement of a policy under which a permit writer would personally need to perform the job site visit, a policy different from that contained in the written agreement concerning mutual understanding. See Defs Ex. 48. Hughes also testified that the permit writer was sitting at the desk and that [he was] having someone else visit the job site. Defs Ex. C at 37:17-20. Brian McCloskey, a nighttime safety superintendent, testified similarly. He stated that [t]he issuer of the permit from the operation standpoint need[ed] to make sure that someone conduct[ed] that with the acknowledger of the permit and that the joint job site inspection [took] place. Pls Ex. 12 at 81:1-5. He testified that the signer of a permit was not required by management to personally perform the related job site inspection. McCloskey further testified that he was unaware of any written permission from management allowing a person other than the signer of a permit to perform the job site inspection. However, he also stated that the writer of the permit didn t have to [personally perform the job site inspection] as long as another 10 operator familiar with the unit had the mutual understanding and did the joint job site inspection. . . . couldn t happen. Nobody ever said that Id. at 84:7-12. Vince King, an operating area superintendent, testified that he was unaware of operators intentionally and deliberately skip[ping] job site inspection at the time of the turnaround. Pls Ex. 18:7-16. William Whitaker, an operator on the hydrocracker unit, testified that permit writers would generally . . . write the permit and then they d hand it to the operator that was in charge of that certain area and then they [the operator] would go out. Pls Ex. 17 at 93:11-14. Whitaker also agreed during his testimony that permit writers at the time of this fatal accident were not allowed to go out and actually do a mutual understanding site inspection. Id. at 91:21-92:3. David White, also an operator on the hydrocracker unit, testified concerning the use of assigned permit writers to fulfill mutual understanding. Defs Ex. E at 27-39. He also agreed with plaintiffs counsel that this procedure save[d] time and personnel by skipping that otherwise mandatory [standing instruction] 2.5.1 job site visitation by the permit writer. Pls Ex. 20 at 147:3-6. John Ward, a maintenance director, testified that he was unaware at the time of the accident that permit writers were not required to perform job site inspection. Defs Ex. F at 325:16-19. 11 Prior to the turnaround, DCR conducted monthly audits of work permits. Defs Ex. 52. Audits prepared for the months of February, March, April and May 2005 list the hydrocracker as one of the units achieving 100% compliance. Id. The audit prepared for August 2005 lists two problematic permits among those selected for auditing. A comment relating to the first of those two permits states: equipment last contained not completed. Signature section not completed by operations. Operations closeout not complete. Id. at VAL08383. A comment relating to the second problematic permit states: Job description not adequate for the job. complete. Id. Operations closeout not Comments relating to all other permits audited from the hydrocracker unit state either Permit OK or state that the contractor failed to sign the permit following the completion of the permitted task. Id. The hydrocracker unit was not included in the September 2005 audit, nor are audits provided from the months of the turnaround. Id. All contractor employees working at DCR during the turnaround were required to complete the DCR contractor safety orientation. The defendants provide records demonstrating that John Ferguson attended this mandatory orientation. Defs Ex. 54. Mr. Ferguson s signature appears on a document listing participants in a new employee training session on August 31, 2005. Id. at MATRIX 001966. The orientation included a warning 12 regarding nitrogen as a potential refinery hazard. 40 at VAL11712. Defs Ex. Mr. Ferguson s signature also appears on a form acknowledging Mr. Ferguson s receipt of an employee safety handbook. Id. at MATRIX 001967. DCR required that all contractors, including Mr. Ferguson s employer Matrix, follow the DCR contractor safety guidelines. Defs Ex. 53. These guidelines state that contractors are required to ensure that each employee is trained in the work practices necessary to safely perform his/her job. Id. at VAL04827. The guidelines further require that each contractor maintain a safety representative on site, who is responsible for all safety-related activities. Id. at VAL04832. Finally, these guidelines require that each contractor generate a safety action plan for the turnaround. Id. at VAL04829. Matrix did create a safety action plan. The plan states: Defs Ex. 55. we will prepare our employees to perform their assigned tasks in a safe and professional manner through site specific training that will be completed immediately following the Valero refinery specific training. Id. at MATRIX 013953. David Huppman, a project manager for Matrix, testified that Matrix was not contracted to perform inert entry during the turnaround at DCR. Huppman Dep. at 98-101. Prior to the turnaround at DCR, Valero created Corporate Safety and Health Guideline 13 ( SHG-13"). 13 This safety guideline defines the minimum requirements that must be implemented to protect employee and contractor personnel from the potential hazards associated with the use of nitrogen within company facilities. Defs Ex. 80 at 1. Among its requirements, the guidelines include the need to ensure that DANGER signs are posted at all ladders and stairways that provide access to the vessel, that a physical barrier will be installed and maintained over the opening, and that the barrier may be removed only be authorized personnel entering the confined space. Id. at 2. When Valero merged with PRG in September of 2005, it did not implement SHG-13 in conjunction with the other safety guidelines in place at DCR. Defs Ex. 82 at 202:14-23. Patrick Covert, the Health, Safety and Environmental Director at DCR, testified that the company intended to review all of the guidelines and standards in place after the turnaround. 202:18-23. Id. at He testified that he didn t feel it was appropriate, going into a turnaround, to change the policies and procedures in place because it would have created more of a safety hazard. Id. at 203:5-9. Valero had also established certain safety precautions at a separate facility located in Paulsboro, New Jersey. These precautions involved the use of manway lockout devices, prohibiting entry into vessels containing nitrogen. 14 On May 22, 2002, at the Paulsboro facility, a contractor named Timothy Tillger died of nitrogen asphyxiation. Defs Ex. 76. The accident occurred when Tillger entered into an instrument cabinet containing nitrogen. Id. Following this incident, an investigation by the Occupational Safety and Health Administration led to an abatement action, in which OSHA required Valero to develop guidelines to prevent similar future accidents. Defs Ex. 78 at 58:1-14. Following the abatement action, Valero drafted SHG-13, discussed above. Pls Ex. 14 at 183:17-22.4 B. The Underlying Accidents As part of the maintenance work at Unit 36-R-1 during the turnaround, the top elbow pipe connected to the manway was removed in order to allow Catalyst Handling workers to remove spent catalyst inside the reactor. Catalyst is used in hydrocracking to convert heavy oil feedstocks into lighter fuel 4 The plaintiffs assert that Valero also developed the use of the manway lockout devices as a result of the abatement action and that such devices were not in place at the Paulsboro facility at the time of Tillger s death. However, the deposition testimony to which the plaintiffs cites in support of this contention does not state that the lockout devices were developed in the abatement action. See Pls Ex. 14 at 183:6-15 ( Q: And Paulsboro, you are aware, were required as part of an OSHA abatement action to actually implement nitrogen safety requirements, including manway lockout devices, correct? . . . [A:] I am not aware of that specifically being part of the abatement action. ). 15 products such as gasoline, kerosene and diesel. While the catalyst is removed, nitrogen was maintained inside Unit 36-R-1 because the spent catalyst would otherwise present a danger of combustion. John Lattanzi was selected by Matrix to be the nighttime foreman for Matrix workers at the Unit 36 reactors. Defs Ex. 60 at 169-170. Mr. Lattanzi s crew provided assistance to Catalyst Handling workers who were removing the catalyst. Defs Ex. 61. John Ferguson s name appears in a list of employee signatures contained in a document titled Job Safety Analysis relating to catalyst removal and dated October 20, 2005, and signed by Mr. Lattanzi. Id. During the loading of catalyst into the reactor, a nitrogen atmosphere was introduced to reduce the risk of combustion. Defs Ex. 59 at 26:4-22. When Catalyst Handling workers performed work in a nitrogen atmosphere, they would wear fresh air breathing equipment. Defs Ex. 25 at 50:1- 15. The catalyst loading process for Unit 36-R-1 was finished early in the morning of November 4, 2005, after which point the Catalyst Handling workers videoed the reactor bed to demonstrate to others stationed elsewhere in the refinery that the job had been completed. Id. at 119-20. This video was viewed by Catalyst Handling s nighttime foreman Eric Crum, Valero engineer Randy Cashio, and an engineer from the company that 16 provided the catalyst. Id. at 140-42. That video showed a roll of duct tape that had been left inside the reactor. 94:11. Id. 91:23- This roll of tape was not identified or removed following the initial viewing of the video. Id. During the dayshift on November 5, 2005, work was performed on the nitrogen piping at Unit 36 so that nitrogen could be piped into Unit 36-R-2. This work required that the nitrogen flow to Unit 36-R-1 be turned off for five to ten minutes. Nitrogen flow then resumed to Unit 36-R-1. James Hughes, the operator who physically turned the valves diverting nitrogen to the different reactors on November 5, testified that nitrogen seeped out of the reactor s top as potentially combustible atmosphere was purged from the reactor. Pl s Ex. 31 at 70-72. William Hurt, manager of technical services at DCR, testified that prior to the nightshift of November 5, 2005, DCR s management decided to begin the process of installing the top elbow on Unit 36-R-1, a process that required rearranging the pre-set job sequence. Pls Ex. 29 at 89-93. Andre Tedeschi testified that Mr. Lattanzi, Bill Pyatt and he attended a meeting at which the work schedule was discussed. 8. Defs Ex. 28 at 59:1- Tedeschi testified he could not say for sure that we mentioned nitrogen purge while Bill Pyatt was in the room, but 17 he also testified that it most likely was [discussed]. Id. at 59:3-24. Mr. Lattanzi received a safe work permit, numbered 35249, at 7:00 p.m. on November 5, 2005. This permit was issued by DCR employee Byron Johnson for loading catalyst at Unit 36R-2. Defs Ex. 67. Mr. Lattanzi held a meeting after receiving the permit at which he reviewed that permit with the crew. Ex. 6 at 78. Defs At this meeting, Mr. Lattanzi assigned Gerald Spears to work on the reactor deck on top of Unit 36-R-2, while the remaining crew members (including Roy Spears) remained at the bottom of the reactor. Mr. Ferguson did not attend this meeting because he was at his brother s wedding. Defs Ex. 10 at 73:2-9- 78:18; Pls Ans. St. Undisputed Fact, ¶¶ 130-31. At 9:00 p.m., Mr. Lattanzi returned to the hydrocracker control room and received a safe work permit numbered 35706. This permit includes a job description that reads: install top elbow. This permit was also signed by Byron Johnson, who checked off a box labeled n/a related to nitrogen purges and inert conditions. At his first deposition, Johnson testified that he told Mr. Lattanzi at the time the permit was issued that the task was a fresh air job. Defs Ex. 68 at 108:21-22. Johnson also testified that Mr. Lattanzi informed him that he planned only to set up his tools for a later installation. at 108:19-24-109:1. 18 Id. The plaintiffs offer deposition testimony from Carl Ward, who was also present at the time the permit issued and who testified that he did not recall those exact words, fresh air, being used by Johnson at that time. Pls Ex. 21 at 48:24. On the back of the 35706 permit is the signature of John Ferguson. Defs Ex. 69. The record contains no evidence that a job site visitation was performed relating to this permit. John Ferguson arrived for work on the evening of November 5, 2005, at 9:16 p.m. Defs Ex. 71. Mr. Lattanzi assigned him to work on the deck of Unit 36-R-1 along with Roy Spears. Spears testified that when he and Mr. Ferguson arrived on the deck, there were several pipefitters already at their work. Spears testified that there was a wooden cover and plastic sheeting over the manway entrance into the reactor. at 83:24-84:15. Defs Ex. 7 The record contains conflicting testimony regarding the presence of red warning tape at the manway entrance. Kenneth Borman, a Catalyst Handling supervisor, testified that he wrapped such tape around the stud protectors of the manway entrance. Defs Ex. 8 at 152:24-153:6. Other witnesses testified that they did not recall any such tape at the accident scene. E.g., Defs Ex. 7 at 81-83; Pls Ex. 24 at 109:6-9. Roy Spears testified that either he or Mr. Ferguson removed the wooden plank and plastic sheeting from the manway 19 entrance. Defs Ex. 7 at 84:10-11. Spears testified that the two men then began the work of cleaning the joint inside the studs of the manway entrance. Id. While they worked, another of the pipefitters on the deck shone a flashlight into the open reactor and saw the roll of duct tape. Id. at 82:10-13. Mr. Ferguson attempted to fish out the roll of duct tape using a length of nine-wire. Roy Spears testified that the impetus for the use of the nine wire to fish out the roll of duct tape was the need for safety in the presence of nitrogen. Ex. 7 at 137:5-15. Defs Roy Spears had descended from the reactor and asked Mr. Lattanzi about removing the roll of duct tape. Spears testified that Bill Pyatt was next to Mr. Lattanzi at the time he asked about the duct tape. Id. at 93:20-24.5 5 Spears also Although the Court need not make any determination on this point to resolve the present motion, the parties dispute Bill Pyatt s role during the turnaround. The defendants characterize Pyatt as an employee of ProTech, a contracted company assisting in the turnaround. The plaintiffs argue that Pyatt was acting as a Valero agent. Much of the evidence the plaintiffs provide only indicates that Pyatt took orders from Valero, e.g. Pls Ex. 11 at 19-21 (Deposition of Brian McCloskey, Q: But Bill Hughes was a direct Valero employee and Mr. Pyatt at the nighttime would take his directions from him? A: Mr. Pyatt would take it from Mr. Hughes, correct. ). At the deposition of Vincent King, the plaintiffs counsel asked a question in which he characterized Mr. Pyatt as authorized to speak on behalf of Valero. Pls Ex. 18 at 16:13-21. King did confirm this characterization although, as an operating area supervisor, it is unclear as to what basis King had to make such a confirmation. An operator, Robert Hall, similarly confirmed a characterization made by plaintiffs counsel regarding Bill Pyatt as an agent of Valero. Pls Ex. 19 at 29:13-16 ( Q: Okay. And he [Pyatt] likewise was the eyes, ears and voice of Valero for contractor interchanges during the night shift? A: I believe so. ). 20 testified that Mr. Lattanzi and Pyatt both ascended Unit 36-R-1 after conversing with Spears. Id. at 98:11-17. At 11:30 p.m., at approximately the same time that Mr. Ferguson was attempting to retrieve the roll of duct tape, DCR held a safety meeting, which Matrix foremen were asked to attend if possible. Defs Ex. 72; Defs Ex. 73 at 211:13-18. A Matrix safety representative testified that he recalled that meeting involved a discussion of the setting of the top elbow and a discussion of fresh air work. Defs Ex. 73 at 212:10-18. Also contemporaneous with Mr. Ferguson s attempt to retrieve the roll of duct tape, was Gerald Spears work on the deck of Unit 36-R-2. Gerald Spears testified that he could observe the deck of Unit 36-R-1 from his position on the neighboring reactor. Defs Ex. 10 at 83:2-12. Gerald Spears testified that Mr. Ferguson was outside the studs on the manway entrance and that he was in a kneeling position attempting to fish the duct tape from the inside of the reactor. Id. at 106:14-22. Carlton Grimes was also working on Unit 36-R-2 at the time of the accident. He testified that he observed Mr. Lattanzi and a second man panicking around the entry into the reactor. Defs Ex. 13 at 48:8-19. Grimes testified that he observed Mr. Lattanzi place a ladder into the reactor and climb into the hole. Id. at 48:15-24. Grimes testified that he saw the second man 21 begin to climb into the reactor, but that he stopped and threw his legs back onto the secure side of the reactor s railing. Id. The defendants contend that the second man s description matches that of William Pyatt. Pyatt s testimony differs from Grimes . Pyatt stated that he observed Mr. Ferguson kneeling, . . . leaning over [the opening] in an attempt to fish out the roll of duct tape. Ex. 29 at 19-20. Defs Pyatt testified that while Mr. Ferguson attempted the retrieval, he walked to Unit 36-R-3, which shared a deck with Unit 36-R-1. Pyatt testified that he was gone for five minutes and when he returned neither Mr. Ferguson nor Mr. Lattanzi were on deck. Pyatt testified that he then looked into the manway entry and saw the two men in the reactor. 71:1-20. Id. at Pyatt testified that he put his own head over the entryway when looking into the reactor and that he did not realize that he was subjecting himself to a danger of nitrogen asphyxiation when doing so. Id. at 72:6-13. Mr. Ferguson and Mr. Lattanzi were removed from the reactor but each man had already died. nitrogen asphyxiation. entered the reactor. Both men died from The parties dispute how Mr. Ferguson The defendants claim that Mr. Ferguson climbed into the reactor; the plaintiffs claim that he fell into the reactor after becoming disoriented due to the effects of nitrogen leaking onto the deck. 22 C. Prior Accidents and Incidents involving Valero The parties differ as to the number and relevancy of prior accidents at the defendants facilities. The defendants claim that there have been nine prior incidents involving nitrogen at companies currently owned by Valero and two prior incidents involving nitrogen at DCR. Defs Br. at 27 (citing Defs Exs. 74-77). The evidence provided by the defendants relating to the first of these incidents is essentially uncontradicted by the plaintiffs. ¶¶ 204-13. Pls Ans. St. Undisputed Fact, That incident occurred in 1998 at a pipeline in Oklahoma owned by Ultramar Diamond Shamrock. Two contractors died by asphyxiation due to nitrogen exposure while working in a trench that they dug to expose the pipeline. Defs Ex. 74. The second incident involved the Paulsboro, NJ, accident discussed above in which a contractor died by nitrogen asphyxiation. The third incident occurred on November 24, 1997, in Texas City, Texas. Two men were exposed to nitrogen while working on a refinery reactor, both lost consciousness but were then rescued by co-workers. Defs Ex. 74 at VAL37985-88. The parties dispute the manner in which the two men at the Texas City refinery actually got into the reactor. The plaintiffs contend that the men fell into the reactor from the deck. Undisputed Fact, ¶¶ 204-13. Pls Ans. St. The defendants suggest that they 23 voluntarily entered the reactor. Defs Br. at 28. An incident report included interviews with the two men contains their statements as to the events of that day. Each stated that the last thing they remember before passing out was working on the reactor deck. Pls Ex. 6 at VAL46338, VAL46355. The plaintiffs further rely on certain incidents that took place at DCR. The first occurred on October 12, 2005, and involved a crane accident. incident. No one received any injuries in this A recommendation in the incident report was to review permit procedures, with respect to mutual understanding, with Reformer operators. Defs Ex. J at VAL 46744. A second incident occurred earlier, on November 15, 2004, involving a contractor named Sean Delaney. Delaney had climbed a scaffold to the top of a reactor that was under nitrogen purge. No one had made Delaney aware of the fact that the reactor was under a nitrogen purge and the incident was recorded as a near-miss. Pls Ex. 12. The incident report created after the incident notes that the permit issued for scaffold support [i.e., the permit Delaney was working under] is general . . . so mutual understanding of the potential hazard involving scaffold inspection at 29-R-3 while the reactor was being purged was not achieved. Id. The plaintiffs also offer a list of documented safety deficiencies and prior incidents at DCR and other relevant Valero 24 documents. Pls Ex. 3. In addition to the incident involving Sean Delaney discussed above, this list references four prior incidents involving nitrogen at DCR. occurred on July 24, 1995. The first allegedly The document corresponding to this particular incident is a two page, hand-written list of notations which state that certain people assisted at 29-R-6 rescue. The Court can find no specific mention of the nature of the incident or of the rescue. Pls Ex. 6 at VAL48277-78.6 The second incident involved a contractor named Bob Bagonis. A DCR incident investigation report notes that Bagonis became lightheaded as a result of exposure to nitrogen while calibrating instruments in the hydrocracker CEMS shelter, not the reactor or the reactor deck. Defs Ex. 83; Pls Ex. 6 at VAL49961. The incident report states that Bagonis closed the wrong valve while performing his calibration, thereby releasing nitrogen into the environment. Id. The third incident involved a blown valve that exposed a worker to the risk of burning by liquid nitrogen. VAL45686. Pls Ex. 3 at The fourth incident also involved a blown valve on a 6 The plaintiffs cite to this document, as they do for much of their evidence, by Bates number and not as an individually numbered exhibit. The documents within a particular exhibit are not arranged in order of either their Bates numbers or by the order of the corresponding incident as listed in the plaintiffs' prepared chart of incidents. This document relating to the July 24, 1995, incident, for example, was found buried within an entirely different exhibit than the one cited by the plaintiffs. The Court has scoured both plaintiffs exhibits 3 and 6 for further information regarding this incident, but has found nothing to elaborate on the brief log entries. 25 nitrogen tank; the plaintiffs cite to an email concerning the event. Pls Ex. 3 at 45404, 45406. Finally, the plaintiffs cite to an issue of DCR s Turnaround Tabloid, a company publication concerning the process of the turnaround and discussing safety issues. On October 21, 2005, the Turnaround Tabloid noted an increase of injuries over the preceding ten days. injuries. The document includes a list of those None of the injuries states that it involved a worker who was unaware of exposure to a nitrogen atmosphere. One incident is noted as involving a worker who ran out of air during a fresh air job. The other incidents involve physical injuries such as eye irritation, twisted ankles, burns and cuts. Pls Ex. 3 at VAL06934. II. Analysis The defendants have moved for summary judgment on the plaintiffs claims for punitive damages. On a motion for summary judgment, a court must view the evidence and draw reasonable inferences from that evidence in the light most favorable to the party opposing summary judgment. See, e.g., Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255 (1986). Summary judgment is proper if the pleadings and other evidence on the record show that there is no genuine issue as to any material fact and that 26 the moving party is entitled to a judgment as a matter of law. Fed. R. Civ. P. 56(c). A. Delaware Law on Punitive Damages The parties do not dispute that Delaware law applies to this motion for summary judgment. Moreover, both parties, as well as the Court, agree that Jardel Company v. Hughes provides the applicable standard for awarding punitive damages on the basis of recklessness. 523 A.2d 518 (Del. 1987). Jardel states: outrageous conduct [calling for punitive damages] may be the result of an evil motive or reckless indifference. In rough approximation, these terms parallel the wilful and wanton standard of [automobile and premises] guest statutes. Each refers to a distinct state of mind, one a conscious awareness, the other a conscious indifference. But each requires that the defendant foresee that his unacceptable conduct threatens particular harm to the plaintiff either individually or as part of a class similarly situated. We prefer the term "reckless indifference" to the term "wanton," which has statutory roots now largely extinct. However, the sharp distinction, drawn by this Court in McHugh v. Brown . . . is still apt. Wantonness is no more a form or degree of negligence than is wilfulness. Wilfulness and wantonness involve an awareness, either actual or constructive, of one's conduct and a realization of its probable consequences, while negligence lacks any intent, actual or constructive. Jardel Co., 523 A.2d at 529-30. The plaintiffs attempt to cast their case as one demonstrating intentional conduct by the defendants sufficient to warrant punitive damages. Jardel, however, rejects the plaintiffs attempt to conflate intent to perform an action and 27 intent to manifest the probable harms flowing from those actions. See Opp'n at 47 ("Thus, to the extent that Jardel has any applicability to this case, it provides support for the submission of this case involving intentional, willful and wanton malfeasance to a jury. . . ."). To win punitive damages on a claim for recklessness, a defendant must be consciously indifferent to the harm they inflict, not simply conscious of the actions which result in that harm. Jardel Co., 523 A.2d at 530. Jardel reiterates this point in outlining the elements of the reckless indifference standard: Two significant elements must be present for recklessness to exist. The first is the act itself, e.g., in accident cases the negligent operation of a motor vehicle or aircraft, in a products liability claim the manufacture or distribution of a defective product or, as in this case, the decision to provide limited security in areas to which the public has been invited. The second, crucial element involves the actor's state of mind and the issue of foreseeability, or the perception the actor had or should have had of the risk of harm which his conduct would create. The actor's state of mind is thus vital. Id. (emphasis added). The "consciousness" element is tied with the foreseeability of harm, not merely conscious or intentional decisions to take a particular course of action. The plaintiffs offer no evidence that would reasonably support a finding that anyone working for the defendants intended to bring about the death of John Mr. Lattanzi or John Ferguson. The fact that the defendants intentionally adopted a particular safety guideline or even that they intentionally ignored such a 28 guideline is not the equivalent of intending that the plaintiffs decedents asphyxiate through exposure to nitrogen. The only plausible ground for an award of punitive damages in this case is recklessness on the part of the defendants. Therefore, the Court will continue with a discussion of the standard for proving recklessness sufficient for an award of punitive damages. The Jardel Court described the analysis for a claim of recklessness. The defendant in Jardel was a property owner who had implemented limited security over its parking lot. The plaintiff was brutally assaulted in the parking lot and sued on the theory that the defendant should have implemented more stringent security measures. Jardel in discussing the recklessness standard as applied to that case, stated: Where the claim of recklessness is based on an error of judgment, a form of passive negligence, the plaintiff's burden is substantial. It must be shown that the precise harm which eventuated must have been reasonably apparent but consciously ignored in the formulation of the judgment. In this case, Jardel might reasonably have been on notice concerning the incidents of general criminal conduct occurring in its parking lot. But no incident approaching the magnitude of the kidnapping and rape of the plaintiff had been reported in the thirteen months of the Globe contract. Id. at 531. The Court continued by stating that it "may have been an error in judgment, and thus negligence, for Jardel not to opt for a larger security force, but it can hardly be said that Jardel turned its back on a known risk." 29 Id. The plaintiffs must demonstrate an awareness and a conscious indifference towards the particular kind of harm at issue. The Delaware courts cast this element of precision narrowly. In Jardel, for example, the record reflected 394 incidents of crime reported to police emanating from the defendant's parking lot. "[O]ver ninety percent were property or nonpersonal crimes. The remaining incidents, however, involved a kidnaping at gunpoint, an armed robbery, a sexual molestation, indecent exposures, and purse snatchings, with approximately one-half of these incidents occurring in the mall parking lot." Id. at 526. The Jardel Court found these incidents sufficient to provide a basis for a claim of negligence on the part of the property owner. "We adopt the Restatement standard, which approves the concept that incidents of criminal activity provide a duty to foresee specific criminal conduct." Id. at 525-26. However, the same history of criminality did not provide a basis for a showing of awareness of a particular risk, abduction and rape, required for the award of punitive damages. Id. at 531. [N]o incident approaching the magnitude of the kidnaping and rape of the plaintiff had been reported in the thirteen months of the Globe contract. Even those incidents which might be deemed assaultive pale in comparison with the attack on the plaintiff. The previous kidnaping arose in a domestic altercation, and no serious physical injury resulted from any of the previous criminal incidents. It may have been an error in judgment, and thus negligence, for Jardel not to opt 30 for a larger security force, but it can hardly be said that Jardel turned its back on a known risk. Id. Similarly, in Dick v. Koutoufaris, the plaintiff failed to demonstrate that the defendant was aware of and ignored the risk of her particular harm. The plaintiff in that case was a waitress at a restaurant who was abducted from the restaurant's parking lot and taken to a remote field where she was raped, robbed and beaten. The plaintiff presented evidence of thirteen crimes committed in the same parking lot over the previous two years. These crimes consisted of car break-ins, tire slashing and purse snatchings. In addition to these crimes, the defendant's agents admitted to knowledge of several robberies, break-ins, tire slashings and purse snatchings. C.A. No. 88C-NO-114, 1990 Del. Super. LEXIS 283 (Del Super. Ct. July 11, 1990). These incidents served as a basis for the claim of negligence on the part of the property owner, but did not constitute a basis for punitive damages. "As in Jardel, the defendants might reasonably have been on notice of the general criminal conduct occurring in the parking lot, but no incident approaching the magnitude of the kidnaping and rape of the plaintiff was reported in the two years and nine months preceding the incident. Accordingly, it may have been an error in judgment for the defendants not to provide warnings or larger security 31 measures, but it cannot be said that they turned their backs on a known risk." Id. at *17. By contrast, the facts of Galindez v. Narragansett Housing Associates, L.P., demonstrate an example of the level of specificity required for the imposition of punitive damages. In that case, a broken "closer" on a door allowed a hallway door in an apartment complex to slam shut suddenly and with great force. A cable repairman's hand was caught in that door, leading to severe damage to the hand, including the amputation of part of his finger. The community manager of the apartment complex, an employee of the defendants, testified that "she did not hire anyone or order maintenance to fix the broken door closer . . . [and] admitted that she knew (before the plaintiff was injured) a door without a properly functioning closer is an unsafe condition that could cause an injury like the one suffered by plaintiff." C.A. No. 04C-05-073-JRJ, 2006 WL 3457628, *4 (Del. Super. Ct. Nov. 28, 2006) (unpublished opinion). Similarly, in a pre-Jardel case, Harris v. Capano Holdings, No. 80C-FE-120, 1981 Del. Super. LEXIS 673 (Del. Super. Ct. June 25, 1981), the plaintiff provided evidence sufficient to make out a case for punitive damages. In that case, a five year old boy drowned in a private club's swimming pool after climbing over a fence. The court stated that deposition testimony containing evidence that employees of a pool 32 were aware of "conditions at the pool which made it highly likely that someone would be severely injured or killed" sufficed as evidence of reckless indifference. Id., 1981 Del. Super. LEXIS 673, *8-*9. In Sterner v. McGhee, 747 F. Supp. 263 (D. Del. 1990), also cited by the plaintiffs, two students who ignited a smoke bomb in a dormitory, resulting in the death of another student as a result of smoke inhalation, were denied summary judgment and a claim for punitive damages was permitted to proceed against them. The court held that "it was reasonably foreseeable that a smoke bomb, targeted directly under the door of [the decedent's] enclosed dormitory room, involved the risk of causing a fire within that enclosed space." Id., 747 F. Supp. at 271. Other defendants in Sterner did succeed in their own motions for summary judgment on the punitive damages issue. Wesley College, the owner of the dormitory where the smoke bomb killed the plaintiff's decedent, had not implemented specific alcohol policies in its dorms beyond those imposed by Delaware law, nor had it repaired a broken fire alarm about which its agents had knowledge at the time of the incident. As to the alcohol policy, the court found no "evidence of record that officials of Wesley College had reason to believe that the College's regulations concerning the use of alcohol in the dormitories were deficient to the point of creating hazardous 33 circumstances on the College campus." Id. With regard to the fire alarm, the court found that the college had performed regular testing of its system and maintained that system in proper order. The failure to repair a fire alarm over the weekend when the incident occurred was evidence of negligence, but not of reckless indifference. Id., 747 F. Supp. at 272. Thus, punitive damages in Sterner survived on a recklessness theory only as to the defendants who actually launched a smoke bomb into another student's dorm room, not as to the defendants responsible for maintaining safety in the dorms. B. The Plaintiffs Fail to Provide Evidence of Conscious Indifference The plaintiffs' argument that Jardel s discussion of the standard for proving conscious indifference is inapplicable to this case is incorrect. Just as in Jardel, the plaintiffs theory of harm is that the defendant oversaw a situation in which they could and should have adopted certain safety precautions but chose not to do so. Choosing to forego certain precautions does not convert a case of recklessness into one of intentional infliction of harm. The record clearly reflects that the defendants undertook several steps to warn against the dangers of nitrogen and to ensure that their contractors had the training necessary to perform work in environments posing a risk of nitrogen 34 asphyxiation. DCR had implemented a safety plan in advance of the turnaround and issued bid books to its contractors outlining the safety issues concerning inert entry. Defs Exs. 32, 33. Matrix attended pre-turnaround meetings at DCR at which the scope of work for the reactors at Unit 36 was discussed. Defs Ex. 35. DCR held nightly meetings during the turnaround at which safety concerns were discussed. E.g., Pls Ex. 3 at 33. Contractors were required to attend, and John Ferguson actually did attend, a contractor safety orientation at which a warning was issued regarding nitrogen as a potential refinery hazard. Defs Ex. 54. DCR required contractors to draft their own safety action plans, which Matrix did. Id. Defs Ex. 55. The plaintiffs do not challenge these precautions. Instead, the plaintiffs rely mainly on four decisions and practices at DCR to support a claim of recklessness. is the lack of manway lockout devices. The first The second is the decision not to implement SHG-13 during the turnaround. The third is the decision to allow mutual understanding to proceed with two different operators writing the permit and performing job-site visitation. The fourth is the alleged failure to enforce standing guideline 2.5.8, which involved a series of fresh-air precautions. The plaintiffs could demonstrate recklessness in two ways. First, they could demonstrate that the defendants were aware that the particular danger presenting in 35 this case persisted in spite of the safety precautions that the defendants adopted. Second, they could demonstrate that the defendants were knowingly ignoring their stated safety policies in light of the risk of the particular harm. Either situation would demonstrate that the defendants turned [their] back on a known risk. Jardel Co., 523 A.2d at 531.7 The plaintiffs fail to provide facts sufficient to demonstrate that the defendants acted with knowledge of the particular risks in this case. Mr. Ferguson was at work on the deck of a reactor under a nitrogen purge, but was not authorized or expected to retrieve anything from inside the reactor. It is uncontroverted that Mr. Ferguson was engaged in an attempt to retrieve a roll of duct tape from inside the reactor when he either fell or climbed into the open manway of Unit 36-R-1. None of the past incidents occurring at DCR or other Valero facilities was of the same magnitude of harm as this accident, nor did they involve a factual situation similar enough to this case to warrant the imposition of punitive damages. 7 The plaintiffs have also pointed to facts that they characterize as indications of the defendants haste in performing the turnaround. These facts would assist the plaintiffs in demonstrating why the defendants acted recklessly only if the Court found that the defendants had, in fact, acted recklessly in light of a known risk. Because the Court does not find that the facts support a claim of recklessness, the Court will not discuss these aspects of the plaintiffs argument. 36 The 1998 incident on the Oklahoma pipeline, in which two contractors died of nitrogen asphyxiation, did not involve a reactor purge or a contractor performing a task beyond the expected scope of his permit. Defs Ex. 74. The Paulsboro incident involved a death by nitrogen asphyxiation, but again not in connection with work on a reactor and involving a contractor performing an unforeseen task. Defs Ex. 76. The 1997 incident at the Texas City refinery, in which two men were exposed to nitrogen, did involve work on the deck of a reactor. That incident, however, involved neither the death of a worker nor an unforeseen task being performed by anyone. Ans. St. Undisputed Fact, ¶¶ 204-13. Defs Ex. 74; Pls The incident at DCR involving Sean Delaney on November 15, 2004, involved a nearmiss, not a death, as well as a broad-ranging blanket permit of a kind different from the limited permit issued to Mr. Lattanzi and his crew. Pls Ex. 12. The incident at DCR on October 12, 2005, involved a crane accident completely unrelated to nitrogen exposure. Defs Ex. J. Nor does the plaintiffs list of documented safety deficiencies and prior incidents at DCR provide facts to support a claim that DCR turned its back on a known risk. includes five incidents involving nitrogen. incident involving Sean Delaney. an incident on July 24, 1995. The list One of these is the The next is an entry discussing The documents related to this 37 incident do not reveal the nature of the alleged safety deficiency. The incident involving Bob Bagonis concerned work being performed at the hydrocracker CEMS shelter, not the reactor deck. That incident involved Bagonis closing the wrong valve while performing an instrument calibration. The third and fourth incidents each involved a blown valve on a nitrogen tank; neither incident involved work on the reactor deck or the performance of an unforeseen task. Pls Ex. 3. Finally, the plaintiffs citation to the defendants Turnaround Tabloid of October 21, 2005, and that publication s list of injuries, does not disclose any facts that would support a finding that the defendants were aware of the risk of the particular harm that befell the plaintiffs decedent. Pls Ex. 3 at VAL06934. The facts, when viewed in the light most favorable to the plaintiffs, suggest that the defendants safety precautions were not applied consistently during the turnaround or on the night of the accident underlying this case. But even assuming that the facts indicate that the defendants were operating without strict compliance with their own safety procedures, the record does not support that such operation was in conscious disregard of the danger that ultimately resulted in this tragedy. The Court emphasizes that it has not reviewed the facts for, and makes no findings or decisions as to, the plaintiffs claims of negligence. Delaware law, however, requires that the Court 38 impose a stricter standard on a claim for punitive damages than on one for negligence, a standard the plaintiffs facts fail to satisfy in this case. III. Conclusion The facts on record fail to demonstrate that the defendants in this case acted in conscious disregard of a known risk sufficient to justify an award of punitive damages. The Court will grant the defendants motion for partial summary judgment on the plaintiffs claims for punitive damages. An appropriate order shall follow separately. 39

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.