PacifiCorp v. Gas Transmission Northwest Corporation, No. 3:2010cv00099 - Document 503 (D. Or. 2014)

Court Description: OPINION & ORDER: Defendant's Second Motion for Summary Judgment 478 and Plaintiff's Motion for Leave to File an Amended Complaint 489 are Denied. Signed on 1/14/14 by Magistrate Judge Paul Papak. (gm)

Download PDF
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF OREGON PACIFICORP, an Oregon corporation, Plaintiff, v. 3:1 0-cv-00099-PK OPINION AND ORDER GAS TRANSMISSION NORTHWEST CORPORATION, a California corporation, Defendant. PAPAK, Magistrate Judge: PlaintiffPacifiCorp brings this action against defendant Gas Transmission Nmthwest Corporation ("GTN") arising out of the alleged contamination of natural gas causing damage to PacifiCorp's Hermiston power plant. The matters before the court are: (1) GTN's second motion for summaty judgment (#478); and (2) PacifiCorp's motion for leave to file an amended Page 1 - OPINION AND ORDER complaint (#489). For the reasons set forth below, the motion for summaty judgment and the motion for leave to file an amended complaint are denied. BACKGROUND I previously outlined the relevant facts, viewed in the light most favorable to PacifiCorp, in the July 16, 2012 opinion and order, and I find it unnecessaty to repeat them here. See July 16, 2012 Opinion and Order, #361, at 2-13; see also December 23, 2013 Opinion and Order, #499, at 2-3 (outlining the relevant procedural histoty following the July 16,2012 opinion and order). At issue now is GTN's second motion for summaty judgment, which GTN filed on October 30, 2013. On November 25, 2013, PacifiCorp filed a resistance (#493). On December 9, 2013, GTN filed a reply (#497). PacifiCorp filed the motion for leave to file an amended complaint on November 14, 2013. On November 26,2013, GTN filed a resistance (#496). On December 13, 2013, PacifiCot-p filed a reply (#498). The matters are fully submitted and ready for decision. ANALYSIS I. GTN's Motion for Summary Judgment A. Standard Summaty judgment is appropriate if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, "show[] that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law." Fed. R. Civ. P. 56(a). Summaty judgment is not proper if material factual issues exist for trial. See, e.g., Celotex Corp. v. Catrett, 477 U.S. 317, 322 (1986); Anderson v. Liberty Lobby, Inc., 477 U.S. 242,247-48 (1986); Warren v. City of Carlsbad, 58 F.3d 439,441 (9th Cir. 1995). Page 2 - OPINION AND ORDER The substantive law governing a claim or defense determines whether a fact is material. See Moreland v. Las Vegas Metro. Police Dep't, 159 F.3d 365, 369 (9th Cir. 1998). In evaluating a motion for summmy judgment, the district courts of the United States must draw all reasonable inferences in favor of the nonmoving party and may neither make credibility determinations nor perform any weighing of the evidence. See, e.g., Reeves v. Sanderson Plumbing Prods., Inc., 530 U.S. 133, 150 (2000); Lytle v. Household J'v!fg., Inc., 494 U.S. 545, 554-55 (1990). B. Discussion In its motion for summmy judgment, GTN argues that the court should grant summary judgment in GTN's favor on three grounds. First, GTN argues that PacifiCorp has failed to generate a genuine issue of material fact regarding the presence of compressor oil in the Hermiston plant turbine. Second, GTN argues that it is entitled to summary judgment because the Hetmiston plant was not operating in the ordinary course of business, as evidenced by its lack of industty-standm·d equipment such as a coalescing filter and heater. Finally, GTN argues that it is entitled to summary judgment on those claims that the Hermiston Generating Company, L.P. ("HOC") "assigned" to PacifiCorp because the assignment is invalid. 1. Evidence of Compressor Oil First, GTN moves for summary judgment on the ground that "PacifiCorp simply has no direct physical evidence of liquid compressor oil being present at the contractual delivery point or in the turbines at the [Hermiston] plant." GTN's Memo. in Support of Motion for Summmy Judgment, #479, at 11. Specifically, GTN argues that PacifiCorp should not be allowed to rely on the "highly questionable" testimony of Frank Glasgow and Teny Journot because PacifiCorp failed to preserve the oil that Glasgow and Journot allegedly observed. Id. at 12. Moreover, Page 3 - OPINION AND ORDER GTN contends that there is no evidence of "coking" that would support PacifiCorp's theory that compressor oil was the cause of the damage. Finally, GTN requests that the court reconsider its prior spoliation sanction and dismiss PacifiCorp's claim in its entirety based on recent districtcourt decisions. a. Glasgow and Journot's Observations of Oil Although GTN styles its motion as a motion for summary judgment, a substantial portion of the motion is, in essence, a request for spoliation sanctions. That is, GTN argues that "PacifiCorp should not be allowed to rely on [Glasgow and Journot's] prejudicial and unconfirmed testimony when the physical evidence that could have been used to disprove the testimony was willfully destroyed." Id at 14. Specifically, GTN takes issue with Glasgow and Jom·not's testimony regarding six instances in which they observed oil either upstream or downstream of the fuel gas scrubbers. See id. at 12-14. Because PacifiCorp did not preserve samples of the oil, GTN contends that the cou1i should not pe1mit Glasgow and Journot to testifY regarding their alleged observations of the oil. In response, PacifiCorp argues that the disposal of the oil that Glasgow and Jom·not observed does not wanant a dismissal sanction. First, PacifiCorp argues that the comi already resolved this issue in the July 16,2012 opinion and order when it concluded that no sanction was appropriate for PacifiCorp's willful destruction of the gas samples McHale & Associates collected in August and October 2007. Second, PacifiCorp notes that GTN has its own oil samples from that period "that, for reasons known only to GTN, it destroyed or failed to produce." PacifiCorp's Resistance to GTN's Motion for Summary Judgment, #493, at 6. Third, PacifiCorp argues that, even if the court were to find that PacifiCorp willfully destroyed the oil Page 4 - OPINION AND ORDER that Glasgow and Joumot observed, dismissal is not the appropriate sanction because there is no evidence that PacifiCorp "deliberately engaged in deceptive practices." Id. at 7. In the July 16, 2012 opinion and order, I discussed at great length the standard applicable to motions for spoliation sanctions. See July 16,2012 Opinion and Order, #361, at 22-23. Such sanctions include dismissal of claims, exclusion of evidence, and adverse jury instructions permitting a juty to draw an inference that the destroyed evidence would have been adverse to the party responsible for its destruction. Unigard Sec. Ins. Co. v. Lakewood Eng'g & JY!.fg. Cmp., 982 F.2d 363,368-70 (9th Cir. 1992). Before a court imposes the "harsh sanction" of dismissal, "the conduct to be sanctioned must be due to willfulness, fault, or bad faith." Anheuser-Busch, Inc. v. Natural Beverage Distribs., 69 F.3d 337, 348 (9th Cir. 1995) (citation omitted) (internal quotation marks omitted). Even when a court imposes a lesser evidentiaty sanction than outright dismissal, it must find that the party willfully destroyed the evidence. Unigard, 982 F .2d at 368 & n.2; Glover v. BIC Cmp., 6 F.3d 1318, 1329 (9th Cir. 1993); see alsoAkiona v. United States, 938 F.2d 158, 161 (9th Cir. 1991). A party's destruction of evidence is considered "willful" if the party "has some notice that the [evidence was] potentially relevant to the litigation before [it was] destroyed." Leon v. IDX Sys. Corp., 464 F.3d 951, 959 (9th Cir. 2006) (citation omitted) (intemal quotation marks omitted). Circuit courts describe the duty to preserve evidence as attaching when a patty should know that evidence may be relevant to litigation that is "anticipated," or "reasonably foreseeable." Silvestri v. Gen. J'vfotors Corp., 271 F.3d 583, 590, 591 (4th Cir. 2001) (citing Kronisch v. United States, 150 F.3d 112, 126 (2d Cir. 1998), and West v. Goodyear Tire & Rubber Co., 167 F.3d 776, 779 (2d Cir. 1999)). Thus, the first step in the spoliation analysis is to determine whether PacifiCorp's Page 5 - OPINION AND ORDER destruction of the oil was willful-that is, whether PacifiCorp had a duty to preserve the oil that Glasgow and Journot observed. In the July 16, 2012 opinion and order, I concluded that litigation was reasonably foreseeable in this case as of August 2, 2007. See July 16, 2012 Opinion and Order, #361, at 26 ("Consequently, PacifiCorp was obligated to preserve any potentially relevant evidence relating to gas quality litigation as of August 2, 2007. "); id. ("Evidence that PacifiCorp destroyed before [August 2, 2007,] cannot form the basis for spoliation sanctions."). In the instant motion, GTN notes that Glasgow and Journot claim in their respective declarations that they observed oil either upstream or downstream ofthe scrubbers on six different occasions. One such incident occmTed sometime between Janumy and July 2007. See Declaration of Terry Journot ("Joumot Declaration"), #256, ~ 4 (noting that, sometime between Janumy and July 2007, he saw "roughly a gallon of oil pour out of the filter housing and onto the ground"). As I previously found, PacifiCorp was under no duty to preserve evidence prior to August 2, 2007. Thus, PacifiCorp's failure to preserve the oil that Journot observed sometime between January and July 2007 was not willful and cannot form the basis of a spoliation sanction. The second incident that GTN identifies occurred in September 2007. See Declat"ation of Francis Glasgow ("Glasgow Declaration"), #257, ~ 10 ("In September 2007, I ... saw oil pooled in the bottom of Cascade's filter housing at the [Hermiston plant]."). Although Glasgow took photographs of the oil, he apparently did not keep a sample of the oil he claims he saw. See id. (noting that he took photographs of the inside of the Cascade filter housing); see also Ex. 3, Glasgow Declaration, #257-3, at 1 (photographs). In its resistance, PacifiCorp does not contest that the oil Glasgow allegedly observed in September 2007 is highly relevant. Accordingly, I Page 6 - OPINION AND ORDER conclude that PacifiCorp's disposal of such oil was willful. It is unclear whether the remaining four incidents occun·ed before or after August 2, 2007. Joumot and Glasgow's declarations do not identity a specific month during which they allegedly observed the oil but, rather, only state that it was sometime in 2007. See Jom·not Declaration, #256, ~ 5 ("During an inspection and cleaning of the gas lines at the [Hermiston plant] in 2007, I saw oil in the plant piping and the turbine equipment for Unit 2, including the pigtails and headers. Oil poured out of the headers."); Glasgow Declaration, #257, ~ 5 ("[D]uring my investigation, I found oil in our 'witch's hat' filter .... "); Glasgow Declaration, #257, ~ 6 ("I ... saw oil dripping from the gas metering orifice, which is located between the scrubber and the witch's hat filter."); Glasgow Declaration, #257, ~ 7 ("[D]uring my investigation, I saw oil dripping out of 'pigtails' immediately upstream from the gas turbine fuel nozzles. The inside of the pigtails were also coated with oil."). Because it does not change my analysis, I will assume that these incidents occmTed after August 2, 2007. PacifiCorp does not contest that the oil Glasgow and Journot observed is highly relevant and, thus, I conclude that PacifiCorp's failure to preserve the oil was willful. Having found that PacifiCorp's disposal of the oil that Glasgow and Journot observed on five separate occasions was willful, I turn now to consider the prejudice to GTN. GTN strenuously argues that, without samples of the oil Glasgow and Journot observed, it has no means of defending against Glasgow and Journot's testimony that they observed oil near the turbines-testimony critical to PacifiCorp's case. I disagree. The prejudice to GTN is not sufficient to justifY dismissal for two reasons. First, as I noted in the July 16,2012 opinion and order, "GTN apparently has its own samples from the period in question." July 16, 2012 Opinion Page 7 - OPINION AND ORDER and Order, #361, at 36; see also PacifiCorp's Resistance to GTN's Motion for Summaty Judgment, #493, at 6 (citing evidence that GTN collected oil from, among other locations, the gas scrubber). Thus, while PacifiCorp may have disposed of the oil that Glasgow and Joumot observed on five specific occasions, GTN was not entirely without oil samples to test. Second, GTN is free to cross-examine Glasgow and Journot regarding what they observed, including the fact that they did not preserve or test the substance that they saw. 1 Accordingly, I find that dismissal is not wananted as a spoliation sanction under the circumstances. b. Evidence of "Coking" GTN also argues that PacifiCorp has failed to present any evidence of "coking" to support its the01y that compressor oil collected and ignited in the fuel nozzles. GTN contends that Dr. A bid Kemal's opinion that there was evidence of coking is "pure speculation and highly prejudicial to GTN" and Joumot's observation of carbon deposits is similarly "pure speculation." GTN's Memo. in Supp01t of Motion for Summaty Judgment, #479, at 15. GTN further notes that, as a result ofPacifiCorp's spoliation, GTN's experts cannot analyze the turbine components to refute PacifiCorp's claim that there was coking. I find GTN's arguments unavailing. At the summaty-judgment stage, the court may not make credibility determinations or weigh the evidence. See, e.g., Reeves, 530 U.S. at 150; Lytle, 1 At oral argument, GTN also argued that the court en·ed when it held in the July 16, 2012 opinion and order that Glasgow and Joumot are competent to offer lay testimony under Federal Rule of Evidence 701 that they observed a substance they identified as oil. See July 16, 2012 Opinion and Order, #361, at 43 n.l5. I find no basis, and GTN does not identify any basis, for reconsidering that conclusion. See Fed. R. Evid. 701; see also United States v. Durham, 464 F.3d 976, 982 (9th Cir. 2006) (finding that the district comt did not err in admitting a lay witness's opinion that a substance was marijuana based on the witness's personal experience with marijuana). Page 8 - OPINION AND ORDER 494 U.S. at 554-55; see also July 16,2012 Opinion and Order, #361, at 47 (finding GTN's argument that Dr. Kemal cannot establish causation did not wan·ant summary judgment because such "concem goes either to the reliability of [Dr.] Kemal's testimony under [Federal Rule of Evidence]702 or to the weight of his testimony, both trial issues"). To the extent GTN is requesting further spoliation sanctions based on PacifiCorp's destruction of the turbine components, I decline to do so, as discussed next. c. Request for Reconsideration GTN next asks the court to reconsider its prior spoliation sanctions based on recent district-comi rulings. Specifically, GTN argues that the decisions in Woodard v. Ford Motor Co., No. 1:11-cv-3092-CL, 2013 WL 3024828 (D. Or. June 13, 2013), Erlandson v. Ford klotor Co., No. 08-CV-1137-BR, 2009 WL 3672898 (D. Or. Oct. 30, 2009), andAzadv. Goodyear Tire & Rubber Co., No. 2:11-CV-00290-KJD-GWF, 2013 WL 593913 (D. Nev. Feb. 14, 2013), establish that, "when the destroyed evidence is so central to the case that the prejudice to the defendant is overwhelming," dismissal is the appropriate sanction. GTN's Memo. in Suppmi of Motion for Sununary Judgment, #479, at 17. GTN maintains that, in this case, the destruction of oil samples, the scrubbers, and "other critical turbine parts ... deprives GTN of the fundamental ability to have a fair trial." Jd at 15-16. PacifiCorp responds that Ninth Circuit precedent does not suppoti a dismissal sanction because there is no evidence that PacifiCorp "deliberately engaged in deceptive practices." PacifiCorp's Resistance to GTN's Motion for Sununary Judgment, #493, at 7. Moreover, PacifiCorp argues that the cases GTN relies on-Woodard, Erlandson, and Azad-are factually distinguishable. "'As long as a district court has jurisdiction over [a] case, then it possesses the inherent Page 9 - OPINION AND ORDER procedural power to reconsider, rescind, or modifY an interlocutory order for cause seen by it to be sufficient."' City ofL.A., Harbor Div. v. Santa }.;fonica Baykeeper, 254 F.3d 882, 885 (9th Cir. 2001) (emphasis omitted) (quoting Melancon v. Texaco, Inc., 659 F.2d 551, 553 (5th Cir. 1981)); see also Fed. R. Civ. P. 54(b) ("[A]ny order or other decision, however designated, that adjudicates fewer than all the claims or the rights and liabilities of fewer than all the patties does not end the action as to any of the claims or pmties and may be revised at any time before the entry of a judgment adjudicating all the claims and all the parties' rights and liabilities."). A court should reconsider its earlier decision if it "(I) is presented with newly discovered evidence, (2) committed clear error or the initial decision was manifestly unjust, or (3) ifthere is mt intervening change in controlling law." Sch. Dist. No. JJv. ACandS, Inc., 5 F.3d 1255, 1263 (9th Cir. 1993); accord Pyramid Lake Paiute Tribe ofIndians v. Hodel, 882 F.2d 364, 369 n.S (9th Cir. 1989); see also Am. Rivers v. NOAA Fisheries, No. CV-04-00061-RE, 2006 WL 1983178, at *2 (D. Or. July 14, 2006) (discussing motions to reconsider under Rule 54(b) and noting that district courts generally apply the same standards as those used in motions under Rule 59(e) and Rule 60(b)). The court's exercise of its inherent authority to amend its prior orders is "an extraordinmy remedy, to be used sparingly in the interests of finality and conservation of judicial resources." Kona Enters., Inc. v. Estate ofBishop, 229 F.3d 877, 890 (9th Cir. 2000) (citation omitted) (internal quotation marks omitted). In this case, GTN has not identified any valid basis for reconsidering my prior decision. While GTN discusses at great length the prejudice it has suffered as a result ofPacifiCorp's destruction of relevant evidence, I previously considered the prejudice to GTN when I fashioned appropriate sanctions. Indeed, I reconsidered the appropriateness of those sanctions just a few Page 10- OPINION AND ORDER months ago at PacifiCorp's request. The cases that GTN cites in support of the instant motion are not controlling and, in any case, I agree with PacifiCorp that they are factually distinguishable. In sh01t, GTN states nothing new in support of the motion that would wanant reconsideration of my earlier order. See id. at 890 (noting that a coutt's authority to reconsider and amend its prior orders should "be used sparingly in the interests of finality and conservation of judicial resources" (citation omitted) (intemal quotation mark omitted)). d. Genuine Issue of Material Fact In the July 16,2012 opinion and order, I concluded that there were questions of fact regarding whether GIN's gas contained compressor oil and whether that compressor oil reached the Unit 2 turbine prior to the outages. See July 16, 2012 Opinion and Order, #361, at 42-43. Specifically, I noted: Core Laborat01y and Texas Oil Tech testing indicated that liquid removed from the GTN pipeline, the Stanfield exchange, the Cascade line, the plant's Unit 2 scrubber and other locations in the plant were consistent with compressor oil, even if the liquid taken from Stanfield and the plant were dissimilar. PacifiCorp's expett Ben Asante opined that the liquid discovered in the plant was compressor oil rather than the product of condensation or glycol, the two other main sources of liquid contamination in gas pipeline systems. Glasgow rep01ted seeing oil while sampling gas at Stanfield and on the pigs that cleaned the Cascade line, while Journot observed oil at the end of the Cascade line where it fed into the plant. And Glasgow and Journot both observed what they described as oil in various turbine parts downstream of the Unit 2 scrubber. Finally, there is testimony that any liquid aniving at the plant necessarily came through the GTN pipeline. Even without considering the challenged testimony from Jomnot, Glasgow, and others that they observed 'coking' in damaged turbine nozzles indicative of oil contamination, a reasonable jmy could infer that compressor oil in the gas delivered by GTN found its way to the Unit 2 turbine throughout the period of the forced outages. Page 11 - OPINION AND ORDER Id at 43 (citations omitted) (footnote omitted). Nothing GTN states in the instant motion alters this prior conclusion. Accordingly, I deny GTN's motion for summaty judgment to the extent GTN argues that PacifiCorp fails to present any admissible evidence that compressor oil reached the Hermiston plant turbine. 2. Ordinary Course of Business Second, GTN moves for summary judgment on the ground that PacifiCorp cannot satisfy its burden to "prove that GTN delivered gas containing compressor oil in sufficient quantities to interfere with commercial use in the 'ordinaty course of business."' GTN's Memo. in Support of Motion for Summaty Judgment, #479, at 21. Specifically, GTN argues that the Hermiston plant lacked industly-standard equipment, including coalescing filters and heaters, in 2007. Because PacifiCorp was not operating in the "ordinary course of business," GTN contends that PacifiCorp catmot establish that GTN breached its contract and, thus, GTN is entitled to summary judgment. In response, PacifiCorp argues that there is "ample evidence to show that the Hermiston [p]lant was operating in the ordinaty course of business." PacifiCorp's Resistance to GTN's Motion for Summaty Judgment, #493, at 12. PacifiCorp argues that various individuals, including David Balevic, Dana Crafts, and Dr. Peter A. Sobieski, have testified or repotied that the gasconditioning equipment at the Hermiston plant was adequate. As an initial matter, I take issue with GTN's suggestion that, under the Federal Energy Regulat01y Commission's ("FERC") interpretation of the relevant tariff provision, PacifiCorp must prove that it was operating in the ordinary course of business. The only remaining claim in this case is a claim for breach of contract. To prevail, PacifiCorp must prove that GTN delivered gas to the Hermiston Meter Station that did not conform with the quality requirements under Page 12 - OPINION AND ORDER G1N's tariff. Under PERC's interpretation of the relevant tariff provision, such gas could include "substances, such as compressor oil, so long as these substances are in quantities that do not interfere with the commercial utilization of the natural gas in the ordinmy course of business." Ex. 1, Declaration of Worthy Walker, #480-1, at 6. Thus, the relevant inquiries are whether G1N delivered natural gas containing compressor oil and, if so, whether the compressor oil was in such quantities that it would have interfered with the commercial utilization of the gas in the ordinary course of business. While PacifiCorp's alleged failure to comply with industty standards may be relevant to, for example, G1N's Sixth Affitmative Defense, which alleges that PacifiCorp is precluded from relief under the in pari delicto doctrine, it does not relieve G1N of its contractual obligation to deliver gas of a cettain quality. In any case, PacifiCmp has presented sufficient evidence to generate a genuine issue of material fact as to whether the Hetmiston plant had adequate gas-conditioning equipment installed at the time of the outages. While G1N claims in its reply that the testimony of PacifiCorp's expett, Dr. Sobieski, "is simply not credible," G1N's Reply in Suppmt of Motion for Summmy Judgment, #497, at 12, I cannot make credibility determinations or weigh the evidence at the summmy-judgment stage. See, e.g., Reeves, 530 U.S. at 150; Lytle, 494 U.S. at 554-55. Accordingly, I deny G1N's motion for summmy judgment to the extent GTN argues it is entitled to summaty judgment on this basis. 3. HGC's Assignment of Claims Finally, G1N requests that the comt grant summmy judgment on those claims that HGC "assigned" to PacifiCmp because the assigmnent is invalid. G1N notes that PacifiCmp paid HGC for HGC's share of the repair costs no later than April 2009 and that these payments Page 13 - OPINION AND ORDER satisfied any claim HGC may have had. Thus, HGC's subsequent assignment of its claims to PacifiCorp in December 2009 was not valid because HGC had nothing to assign. In response, PacifiCorp argues that the assignment is valid. Specifically, PacifiCorp points to the Ownership and Operating Agreement between PacifiCorp and HGC, which is dated December 30, 1998. Under the Ownership and Operating Agreement, PacifiCorp is "obligated to cover losses or damages that were caused in connection with the agreements goveming the delive1y of natural gas to the He1miston [p]!ant." PacifiCorp's Resistance to GTN's Motion for Summmy Judgment, #493, at 13 (citing Ex. 2, Declaration of BrianT. Sniffen ("Sniffen Declaration"), #462-2, § 14.03). PacifiCorp fu1iher notes that, on September 19,2007, HGC wrote a letter to PacifiCorp, alerting PacifiCm-p of its duty to indemnity HGC for HGC's share of the repair costs pursuant to the Ownership and Operating Agreement: A ... consequence ofHGC's recent determination of the cause of the Forced Outages is the application of Section 14.03 of the [Ownership and Operating] Agreement, which section makes clear HGC is entitled to indemnity from PacifiCorp for any losses or costs arising under the Fuel Agreements following the Transition Date. The portion of repair costs initially allocated to and paid for by HGC (50%) (the other 50% having been allocated to PacifiCorp) for all four Incidents are subject to full reimbursement by PacifiCorp. In turn, PacifiCorp has the sole right to seek indemnity for all such expense from the Fuel Gas suppliers and/or the Fuel Gas transmission companies under either the Existing Fuel Agreements and/or the New Fuel Agreements. Ex. 3, Sniffen Declaration, #462-3, at 3. Thus, PacifiCorp argues that the Ownership and Operating Agreement and the September 19, 2007letter create a valid assignment and "[t]he later-executed assignment simply reaffirmed PacifiCm-p's right to asse1i HGC's claims against GTN." PacifiCorp's Resistance to GTN's Motion for Summmy Judgment, #493, at 14. Page 14- OPINION AND ORDER Alternatively, PacifiCorp argues that, even if the assignment is not valid, PacifiCorp may still sue GTN for HGC's share of the repair costs under the equitable doctrine of subrogation. Although PacifiCorp notes that it did not plead equitable subrogation in its complaint, it asserts that it should be allowed to amend its complaint to add such a claim under the circumstances of this case. I agree with PacifiCorp that HGC validly assigned its claims for repair costs to PacifiCorp no later than September 2007-prior to PacifiCorp making any payments to HGC. Oregon courts define an assignment as "[a] present and binding appropriation of an interest in a specific fund." Wittmayer v. Edwards, 781 P.2d 866, 868 (Or. Ct. App. 1989). An assignment "'may be oral or written and no special form is necessary provided that the transfer is clearly intended as a present assignment of the interest held by the assignor."' ld. (quoting Anderson v. Dep't of Justice, 588 P.2d 1295, 1297 (Or. Ct. App. 1979)). Here, HGC made clear in the September 19, 2007 letter that, under the Ownership and Operating Agreement, PacifiCorp had an obligation to pay for HGC's share of the repair costs and, "[i]n turn, PacifiCorp [had] the sole right to seek indemnity for all such expense from the Fuel Gas suppliers and/or the Fuel Gas transmission companies under either the Existing Fuel Agreements and/or the New Fuel Agreements." Ex. 3, Sniffen Declaration, #462-3, at 3. I find that this was sufficient to create a valid assignment. Even ifi were to find that the assignment is not valid, I would nevertheless allow PacifiCorp to seek the repair costs from GTN under the equitable doctrine of subrogation. See Koch v. Spann, 92 P .3d 146, 148 (Or. Ct. App. 2004) ("Subrogation is an equitable doctrine that is based on a themy of restitution and unjust emichment. It enables a secondarily liable pmiy who has been compelled to pay debt to be made whole by collecting that debt from the primarily Page 15 -OPINION AND ORDER liable party who, in good conscience, should be required to pay." (citation omitted)). PacifiCorp acquired the right to sue GTN for HGC's p01iion of the repair costs the moment that PacifiCorp paid HGC for those repair costs; the fact that HGC and PacifiCorp later fonnalized this a11'angement in the f01m of an assignment is without consequence. While GTN complains that PacifiCotp failed to plead a right to subrogation, I find that GTN would not be prejudiced ifl were to allow PacifiCotp to amend its complaint to add such an allegation now. OTN can hardly claim surprise, as it has been aware that PacifiCotp is seeking HOC's potiion of the repair costs since the beginning of the lawsuit. Indeed, in its prior motion for spoliation sanctions, OTN vigorously argued that "PacifiCotp stands in the shoes of HOC" by vhiue of HOC's assigrunent of its claims-a position that I adopted in the July 16, 2012 opinion and order. July 16, 2012 Opinion and Order, #361, at 24 n.6. Accordingly, even ifl were to find that the assigrunent is invalid, I would petmit PacifiCorp to amend its complaint to plead a right to subrogation. In light of the foregoing, I deny GTN's motion for summary judgment to the extent it seeks summary judgment on those claims HOC assigned to PacifiC01p? II. PacifiCorp's Motion for Leave to File Amended Complaint In its motion, PacifiCotp requests leave to file a second amended complaint adding a request for prejudgment interest. Specifically, PacifiCot]l seeks to add the following language: "Pursuant to ORS 82.010, PacifiCotp is entitled to prejudgment interest on all of its damages, which are readily ascertainable." PacifiCotp's Proposed Second Amended Complaint, #491-2, at 2 In addition, I find that OTN waived its invalid-assigrunent defense. "Federal Rule of Civil Procedure 8( c) requires defendants to plead affirmative defenses in answer to [a] plaintiffs complaint. Defenses not so raised are waived." Taylor v. United States, 821 F.2d 1428, 1432 (9th Cir. 1987). In this case, GTN failed to timely plead an invalid-assignment affitmative defense and, thus, such defense is waived. Page 16- OPINION AND ORDER 7; see also id. at 8. PacifiCorp argues that the amendment is wan-anted because GTN will suffer no prejudice as GTN has been aware since at least October 7, 2011, that PacifiCorp is seeking prejudgment interest. PacifiCorp notes that GTN previously moved for summary judgment on PacifiCorp's request for prejudgment interest and, although the comi ultimately found the request was not properly pled, both parties have already briefed PacifiCorp's substantive entitlement to prejudgment interest. Moreover, PacifiCorp argues that its request for leave to amend will not cause undue delay, its proposed amendment is made in good faith, and its proposed amendment is not futile. In response, GTN argues that the comi should deny PacifiCorp's motion on the basis of delay, pmiicularly in light of the court's recent denial of GTN's motion for leave to amend. GTN futiher contends that it will suffer prejudice if the court petmits PacifiCorp to add a request for prejudgment interest now, as "a prejudgment interest claim was never the subject of proper discovery in this case, because it was never properly [pled]." GIN's Resistance to PacifiCorp's Motion for Leave to File Amended Complaint, #496, at 5. Finally, GTN argues that PacifiCorp's proposed amendment is futile because it does not adequately plead an entitlement to prejudgment interest, as required under Oregon law, and, furthermore, prejudgment interest is not recoverable in this case because the damages are not easily ascertainable. A. Standards 1. Rule 16(b) Federal Rule of Civil Procedure 16(b) requires district courts to issue a scheduling order in each case, other than those excluded by local rule. The scheduling order must limit the time to "join other parties, amend the pleadings, complete discovety, and file motions." Fed. R. Civ. P. Page 17 - OPINION AND ORDER 16(b)(3)(A). Once issued, "[a] schedule may be modified only for good cause and with the judge's consent." Fed. R. Civ. P. 16(b)(4). The focus of the good-cause inquhy under Rule 16(b) is whether the patty requesting an extension demonstrates that, despite its diligence, the deadline set fmth in the scheduling order cannot reasonably be met. Fed. R. Civ. P. 16 advismy committee's note; see also In re W: States Wholesale Natural Gas Antitrust Lifig., 715 F.3d 716, 737 (9th Cir. 2013) ("Rule 16(b)'s 'good cause' standard primarily considers the diligence of the party seeking the amendment." (quoting Johnson v.kfammoth Recreations, Inc., 975 F.2d 604, 609 (9th Cir. 1992) (internal quotation mark omitted)). "Although the existence or degree of prejudice to the party opposing the modification might supply additional reasons to deny a motion, the focus of the inquhy is upon the moving party's reasons for seeking modification." Johnson, 975 F.2d at 609. If the party requesting the modification "was not diligent, the inquhy should end." Id In determining whether a patty acted diligently, district comis may consider the following three factors: (1) whether the party "was diligent in assisting the Comi in creating a workable Rule 16 order"; (2) whether the party's "noncompliance with a Rule 16 deadline occurred or will occur, notwithstanding [its] diligent effmts to comply, because of the development of matters which could not have been reasonably foreseen or anticipated at the time of the Rule 16 scheduling conference"; and (3) whether the patty "was diligent in seeking amendment of the Rule 16 order, once it became apparent that [the patty] could not comply with the order." Chao v. Westside Drywall, Inc., 709 F. Supp. 2d 1037, 1072-73 (D. Or. 2010) (quoting Jackson v. Laureate, Inc., 186 F.R.D. 605, 608 (E.D. Cal. 1999)) (intemal quotation marks omitted). Ill Page 18- OPINION AND ORDER 2. Rule 15(a) Under Federal Rule of Civil Procedure 15(a), "[t]he court should freely give leave [to amend] when justice so requires." Fed. R. Civ. P. 15(a); see also Sonoma Cnty. Ass'n ofRetired Emps. v. Sonoma Cnty., 708 F.3d 1109, 1117 (9th Cir. 2013) ("In general, a court should liberally allow a party to amend its pleading."). This policy in favor of amendment is "applied with extreme liberality." Sonoma Cnty. Ass'n ofRetired Emps., 708 F.3d at 1117 (quoting Owens v. Kaiser Found. Health Plan, Inc., 244 F.3d 708, 712 (9th Cir. 2001)) (internal quotation mark omitted). The Ninth Circuit has cautioned that a court may decline to grant leave to amend only if there is strong evidence of "undue delay, bad faith or dilatory motive on the pmt of the movant, repeated failure to cure deficiencies by amendments previously allowed, undue prejudice to the opposing pmty by virtue of allowance of the amendment, [or] futility of amendment, etc." Id. (alteration in original) (quoting Foman v. Davis, 371 U.S. 178, 182 (1962)); accord Zucco Partners, LLC v. Digimarc Corp., 552 F.3d 981, 1007 (9th Cir. 2009) (quoting Leadsinger, Inc. v. B}vJG Music Publ'g, 512 F.3d 522, 532 (9th Cir. 2008)). The five relevant considerations-undue delay, bad faith, failure to cure deficiencies by amendments previously allowed, undue prejudice, and futility-are not accorded equal weight. A pmty's delay in moving to amend, for instance, is relevant but not dispositive. Lockheed lvfartin Corp. v. Network Solutions, Inc., 194 F.3d 980,986 (9th Cir. 1999) ("Although delay is not a dispositive factor in the amendment analysis, it is relevant, especially when no reason is given for the delay." (citations omitted)); see also Sonoma Cnty. Ass'n ofRetired Emps., 708 F.3d at 1118 ("'[T]he mere fact that an amendment is offered late in the case ... is not enough to bar it."' (second alteration in original) (quoting United States v. Webb, 655 F.2d 977, 980 (9th Cir. Page 19- OPINION AND ORDER 1981))). The prejudice suffered by the opposing party, on the other hand, is entitled to the greatest weight. Sonoma Cnty. Ass'n ofRetired Emps., 708 F.3d at 1117 (quoting Eminence Capital, LLC v. Aspeon, Inc., 316 F.3d 1048, 1052 (9th Cir. 2003)). Likewise, a court may deny a motion for leave to amend based solely on the futility of the proposed amendments. US. ex rel. Lee v. SmithKline Beecham, Inc., 245 F.3d 1048, 1052 (9th Cir. 2001) (quoting Bonin v. Calderon, 59 F.3d 815, 845 (9th Cir. 1995)). B. Discussion I find that PacifiCorp is not entitled to amend its complaint. First, in the December 23, 2013 opinion and order addressing GIN's motion for leave to file an amended answer, I found that motions for leave to amend were due June 1, 2010. See December 23,2013 Opinion and Order, #499, at 14 (reviewing the applicable scheduling orders in the case and concluding that the comt never reset the deadline to file amended pleadings and, thus, the deadline set f01th in the comt's standard discovery and pretrial scheduling order applies). Because PacifiCorp filed the instant motion for leave to amend on November 14, 2013-nearly three-and-a-half years after the deadline-PacifiCorp must satisfY the more stringent standard under Rule 16(b) as well as the Rule 15(a) standard. See Johnson, 975 F.2d at 607-08 (holding that, when a party requests leave to amend outside the time limit established in a scheduling order, the comt must first determine whether Rule 16(b)'s good-cause standard is satisfied and then determine whether Rule 15(a)'s standard is satisfied (citing Forstmann v. Culp, 114 F.R.D. 83, 85 (M.D.N.C. 1987))); see also O'Connell v. Hyatt Hotels ofP.R., 357 F.3d 152, 154-55 (1st Cir. 2004) (noting that seven circuit courts of appeals, including the Ninth Circuit, "have held that Rule 16(b)'s 'good cause' standard, rather than Rule 15(a)'s 'freely given' standard, govems motions to amend filed after scheduling Page 20 - OPINION AND ORDER order deadlines"). PacifiCorp makes no attempt to establish good cause warranting exception to the scheduling order. Most troubling is PacifiCorp's failure to demonstrate that it diligently sought amendment of the scheduling order. PacifiCorp was aware as of July 16,2012, that it did not comply with Oregon law's requirement to plead a request for prejudgment interest. See July 16,2012 Opinion and Order, #361, at 50. Yet, PacifiCorp waited until November 14,2013, to request leave to file an amended complaint. Given this unexplained delay, I cannot find that PacifiCorp was diligent in seeking an extension of the deadline for filing amended pleadings. Even ifi were to apply the more lenient Rule 15(a) standard, I would still find that amendment is not warranted. First, although not dispositve, PacifiCorp's three-and-a-half-year delay in seeking leave to amend is certainly relevant. See AmerisourceBergen Corp. v. Dialysist W:, Inc., 465 F.3d 946, 953 (9th Cir. 2006) ("We have held that an eight month delay between the time of obtaining a relevant fact and seeking leave to amend is unreasonable."). While I note that this case was stayed pending PERC's decision regarding the proper interpretation of the tariff language, nothing prevented PacifiCorp from seeking leave to amend while awaiting PERC's decision. Indeed, I note that PacifiCorp continued to seek discovery while the case was stayed. See, e.g., PacifiCorp's Motion to Compel, #366 (requesting that the court compel G1N to produce documents that the court had concluded were subject to discovery in the July 16,2012 opinion and order). Moreover, PacifiCorp offers no reason why it did not seek leave to amend as soon as the court lifted the stay. Second, and most significant, PacifiCorp's proposed amendment is either futile or unnecessaty, depending on a conflict-of-law question I need not resolve for the purposes of this motion. Specifically, there is a question as to whether Oregon law or federal law govems the Page 21 -OPINION AND ORDER adequacy ofPacifiCorp's request for prejudgment interest. Although PacifiCorp maintains that it need not plead its entitlement to prejudgment interest because federal pleading requirements apply, neither party fully addressed this conflict-of-law issue and I find it unnecessmy to decide it now. 3 If federal law applies, as PacifiCorp urges, PacifiCorp need not plead a claim for prejudgment interest and, thus, any amendment of the complaint is unnecessary. See Fed. R. Civ. P. 54(c) ("A default judgment must not differ in kind from, or exceed in amount, what is demanded in the pleadings. Eve1y other final judgment should grant the relief to which each party is entitled, even if the party has not demanded that relief in its pleadings."); Consolidated Cigar Co. v. Tex. Commerce Bank, 749 F.2d 1169, 1175 (5th Cir. 1985)(finding that "there is no requirement for a specific pleading for prejudgment interest" under the Federal Rules of Civil Procedure); WR. HtiffAsset Mgmt. Co. v. William Soroka 1989 Trust, Civ. Action No. 04-3093 (KSH), 2009 WL 2436692, at *2 (D.N.J. Aug. 6, 2009) ("The Court is satisfied that a party's failure to assert a demand for prejudgment interest in a pleading is ultimately trumped by Rule 54(c) if such an award would provide the relief to which a party is otherwise entitled."). If, on the other hand, Oregon law applies, I find that PacifiCorp's proposed amendment is futile because it fails to sufficiently plead a claim for prejudgment interest. Under Oregon law, 3 Although I decline to resolve this issue now, I note that PacifiCorp's argument that federal pleading standards apply has some support. See, e.g., lv!eaux Swface Protection, Inc. v. Fogleman, 607 F.3d 161, 172 (5th Cir. 2010) (holding that, while state law governs a pmiy's substantive right to prejudgment interest, the pleadings do not need to contain a request for prejudgment interest under Federal Rule of Civil Procedure 54(c)); Soderhamn Mach. lY!fg. Co. v. 1vfartin Bros. Container & Timber Prods. Cm]J., 415 F.2d 1058, 1064 (9th Cir. 1969) ("The right to recover prejudgment interest was not affected by [the plaintiff's] failure to dema11d interest in its federal pleadings."); cf Robinson v. Managed Accounts Receivables Corp., 654 F. Supp. 2d 1051, 1066 (C.D. Cal. 2009) ("[T]he fact that California courts may impose a heightened pleading requirement on claims for punitive damages is inelevant, because such a requirement conflicts with federal procedural law.") Page 22 - OPINION AND ORDER "[a] party seeking prejudgment interest 'must specifically plead a foundation for prejudgment interest. To do so, that pmiy must (1) request prejudgment interest in the prayer and (2) plead facts sufficient to state a claim for prejudgment interest."' Davis v. F W. Fin. Servs., Inc., No. 110404916, _ P.3d _ , 2013 WL 6834954, at *11 (Or. Ct. App. Dec. 26, 2013) (quoting Emmert v. No Problem Hany, Inc., 192 P.3d 844, 849 (Or. Ct. App. 2008)). "A pmiy sufficiently states a claim for prejudgment interest where a pmiy alleges, in the body of its complaint, 'the exact amount claimed to be due and the dates during which [the] plaintiff claimed it was deprived of the use of its money."' Id. (alteration in original) (quoting Holman Transfer Co. v. Pac. Nw. Bell Tel. Co., 599 P.2d 1115, 1126 (Or. 1979)). In this case, PacifiCorp alleges in its proposed second amended complaint that, as a result of the outages, it "has been required to incur repair and remedial measures and related costs in excess of $3,300,000" and that it has suffered consequential damages "of approximately $4,000,000." PacifiCorp's Proposed Second Amended Complaint, #491-2, at 4. Absent from PacifiCorp's proposed amended complaint is any mention of "the dates during which ... it was deprived of the use of its money." Davis, 2013 WL 6834954, at *11 (citation omitted) (intemal quotation mark omitted). As this case has progressed through discovery and a prior round of dispositive motions, it has become clear that there were four separate forced outages occmTing in Janumy 2007, July 2007, August 2007, and September 2007.' PacifiCorp's proposed amended complaint, however, does not identifY the dates of the outages or attempt to give any estimate as to what damages are attributable to which outages. Thus, I cannot conclude that PacifiCorp has 4 I note that, as a result of the July 16,2012 opinion and order, only the Janumy 2007 and July 2007 outages are still at issue. Page 23 - OPINION AND ORDER sufficiently pleaded a claim for prejudgment interest under Oregon law and, thus, if Oregon law applies, PacifiCorp's proposed amendment is futile. In light of the foregoing, I deny PacifiCorp's motion for leave to amend its complaint to add a claim for prejudgment interest. I emphasize, however, that I make no finding at this time as to whether PacifiCorp must plead a claim for prejudgment interest and whether PacifiCorp is entitled to prejudgment interest. Should this case proceed to trial, I will address any arguments relating to these issues at the pretrial conference. CONCLUSION For the reasons discussed above, GTN's second motion for summary judgment (#478) and PacifiCorp's motion for leave to file an amended complaint (#489) are denied. Dated this 14th day of January, 2014. 7 Honorable Paul Papak United States Magistrate Judge Page 24 - OPINION AND ORDER

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.