Haisha Corp v. Sprint Solutions, Inc. et al, No. 3:2014cv02773 - Document 12 (S.D. Cal. 2015)

Court Description: REDACTED ORDER Granting 6 Defendant's Motion to Compel Arbitration and Dismissing the Complaint. The Court Grants Defendant's motion to compel arbitration and Dismisses the complaint. The Court also severs the forum selection clause in the AR Agreement and the parties are directed find a mutually agreeable location for arbitration. The Clerk of Court shall close the case. The hearing date setfor January 16, 2015 is vacated. Signed by Judge Gonzalo P. Curiel on 1/14/2015. (srm) (Main Document 12 replaced on 1/15/2015) (srm).

Download PDF
Haisha Corp v. Sprint Solutions, Inc. et al Doc. 12 1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 SOUTHERN DISTRICT OF CALIFORNIA 10 HAISHA CORP., 11 12 CASE NO. 14cv2773-GPC(MDD) Plaintiff, vs. 13 (Dkt. No. 6.) 14 15 16 ORDER GRANTING DEFENDANT’S MOTION TO COMPEL ARBITRATION AND DISMISSING THE COMPLAINT SPRINT SOLUTIONS, INC.; and DOES 1-100, inclusive, REDACTED-ORIGINAL FILED UNDER SEAL Defendant. 17 18 Before the Court is Defendant’s motion to compel arbitration and to dismiss the 19 complaint for lack of subject matter jurisdiction, or in the alternative, stay pending 20 arbitration, or in the alternative, dismiss for failure to state a claim. (Dkt. No. 6.) 21 Plaintiff filed an opposition. (Dkt. No. 8.) Defendant filed a reply. (Dkt. No. 9.) After 22 a review of the pleadings, briefs, supporting documents and the applicable law, the 23 Court GRANTS Defendant’s motion to compel arbitration and dismisses the complaint. Background 24 25 On October 21, 2014, Plaintiff Haisha Corporation (“Haisha” or “Plaintiff”) filed 26 a complaint against Defendant Sprint Solutions, Inc. (“Sprint” or “Defendant”) in San 27 Diego County Superior Court alleging four causes of action for intentional interference 28 with prospective economic relations; negligent interference with business relationships; -1- [14cv2773-GPC(MDD)] Dockets.Justia.com 1 unlawful, unfair and fraudulent business acts and practices; and interference with 2 contractual relations. (Dkt. No. 1-1 at 2.) On November 20, 2014, Defendant removed 3 the case to this Court. (Dkt. No. 1.) 4 According to the complaint, Plaintiff was a Sprint Preferred Dealer Partner doing 5 business as The Wireless Place since August 2007. (Dkt. No. 1-1, Compl. ¶ 8.) 6 Plaintiff ultimately owned six retail wireless phone stores in San Diego. (Id.) Plaintiff 7 was an exclusive dealer for Sprint and operated all locations as Sprint branded stores. 8 (Id.) In 2009, Haisha was selected to be a Preferred Dealer. (Id. ¶ 9.) 9 Haisha stores were consistently ranked amongst the very top independent Sprint 10 dealers in customer service, sales, and other key performance metrics, and received 11 high praises from the Vice President (“VP”) and Directors when they would visit. (Id. 12 ¶¶ 10, 11.) Sprint management often referred to Plaintiff as a valued partner in 13 business and encouraged expansion. (Id. ¶ 12.) 14 On August 26, 2013, Sprint’s VP of the West Region, Rob Bryant, sent an email 15 to Andrew Haisha, Haisha’s president, stating Haisha’s contract with Sprint had 16 expired and that Sprint would not be renewing it. (Id. ¶ 13.) The letter stated that 17 Plaintiff had thirty (30) days to either close all six stores or find a buyer to purchase 18 them. (Id.) This was a complete surprise to Haisha as the relationship was on track for 19 continued growth and expansion. (Id. ¶ 14.) 20 Mark Pena, a director at Sprint, explained that the termination was complicated 21 and had to do with SoftBank’s purchase of Sprint. (Id. ¶ 15.) SoftBank wanted larger 22 dealers and Haisha’s six stores was no longer a partnership that Sprint considered 23 profitable. (Id.) In that telephone conversation, Pena stated that he did not want 24 Haisha to close its doors because he did not want to lose distribution in the San Diego 25 market. (Id. ¶ 17.) Moreover, Pena did not want Haisha stores to convert to a 26 competitor so he provided a list of five dealers in Sprint’s West Region and stated that 27 the sale of the stores would not be approved to anyone other than those five existing 28 Sprint preferred dealers. (Id.) -2- [14cv2773-GPC(MDD)] 1 Haisha obtained offers from Sprint preferred dealers that were not on the list of 2 “five” provided by Pena. (Id. ¶ 18.) When Haisha contacted the five dealers, four 3 expressed significant interest but had concerns about receiving Pena’s approval of the 4 sale. (Id. ¶ 19.) Ultimately, the only dealer that Pena permitted to negotiate with 5 Haisha paid only $600,000, significantly less than fair market value for its stores. (Id. 6 ¶ 20.) Plaintiff had contractual relationships and obligations to landlords relating to 7 the operation of the Sprint stores owned by Haisha. (Id. ¶ 21.) The dealer that 8 purchased the stores intended to close certain locations, leaving Plaintiff liable for the 9 leasehold obligations. (Id.) 10 In its motion to compel arbitration, Defendant provides additional relevant facts. 11 On January 24, 2011, Haisha entered into an Authorized Representative Agreement 12 (“AR Agreement”) 13 14 . (Dkt. No. 11, Serra Decl., Ex. A, AR Agreement 15 ( U N D E R S E A L ) . ) T h e A R 16 Agreement 17 18 . 19 ( U N D E R S E A L (Id. ¶ 14.1 ) . ) 20 21 . (Id. ¶ 14.2 22 (UNDER SEAL).) On August 26, 2013, after the two year term had expired, Sprint 23 sent Haisha a 30 days’ written notice that the contract had expired and that it would not 24 renew the agreement. (Dkt. No. 1-1, Compl. ¶ 13.) 25 The AR Agreement provides a dispute resolution procedure outlined in Exhibit 26 E of the agreement. On November 19, 2014, Sprint sent Haisha a written demand that 27 the parties attend mediation as required in the agreement prior to invoking arbitration. 28 (Dkt. No. 6-2, Coombe Decl. ¶ 2; Ex. A.) As of the filing of its motion, Haisha has not -3- [14cv2773-GPC(MDD)] 1 responded to the mediation demand. While still premature since arbitration may be 2 initiated after the 45th calendar day following the request for mediation, Sprint moves 3 to compel arbitration under the Federal Arbitration Act (“FAA”). 4 A. Motion to Compel Arbitration 5 The Federal Arbitration Act (“FAA”), 9 U.S.C. § 1 et seq., espouses a general 6 policy favoring arbitration agreements and establishes that a written arbitration 7 agreement is “valid, irrevocable, and enforceable.” 9 U.S.C. § 2. The FAA permits “a 8 party aggrieved by the alleged failure, neglect, or refusal of another to arbitrate under 9 a written agreement for arbitration may petition any United States district court . . . for 10 an order directing that . . . arbitration proceed in the manner provided for in such 11 agreement.” 9 U.S.C. § 4. The United States Supreme Court has stated that there is a 12 federal policy favoring arbitration agreements. Moses H. Cone Mem’l Hosp. v. 13 Mercury Constr. Corp., 460 U.S. 1, 24 (1983). Federal policy is “simply to ensure the 14 enforceability, according to their terms, of private agreements to arbitrate.” Volt Info. 15 Sciences, Inc. v. Bd. of Trustees of Leland Stanford Jr. Univ., 489 U.S. 468, 476 16 (1989). Courts are also directed to resolve any “ambiguities as to the scope of the 17 arbitration clause itself . . . in favor of arbitration.” Id. 18 Under the FAA, arbitration agreements “shall be valid, irrevocable, and 19 enforceable, save upon such grounds as exist at law or in equity for the revocation of 20 any contract.” 9 U.S.C. § 2. In analyzing whether an arbitration agreement is valid and 21 enforceable, “generally applicable contract defenses, such as fraud, duress, or 22 unconscionability, may be applied to invalidate arbitration agreements without 23 contravening § 2.” Doctor's Assoc., Inc. v. Casarotto, 517 U.S. 681, 687 (1996). In 24 interpreting the validity and scope of an arbitration agreement, the courts apply state 25 law principles of contract formation and interpretation. See Wolsey, Ltd. v. 26 Foodmaker, Inc., 144 F.3d 1205, 1210 (9th Cir. 1998) (citing First Options of Chicago, 27 Inc. v. Kaplan, 514 U.S. 938, 944 (1995)). 28 When considering a party’s request to compel arbitration, the court is limited to -4- [14cv2773-GPC(MDD)] 1 determining (1) whether a valid arbitration agreement exists, and if so (2) whether the 2 arbitration agreement encompasses the dispute at issue. Cox v. Ocean View Hotel 3 Corp., 533 F.3d 1114, 1119 (9th Cir. 2008). If these conditions are satisfied, the court 4 is without discretion to deny the motion and must compel arbitration. 9 U.S.C. § 4; 5 Dean Witter Reynolds, Inc. v. Byrd, 470 U.S. 213, 218 (1985) (“By its terms, the 6 [FAA] leaves no place for the exercise of discretion by a district court, but instead 7 mandates that district courts shall direct the parties to proceed to arbitration.”). 8 Plaintiff argues that its claims do not fall under the scope of the arbitration 9 provision. Second, Plaintiff argues that the arbitration agreement is unenforceable 10 because it is procedurally and substantively unconscionable. 11 B. Scope of Arbitration Provision 12 Plaintiff first argues that its claims do not fall within the scope of the arbitration 13 provision because its harm is based on Defendant preventing third parties from bidding 14 on and making offers for Sprint stores owned and successfully managed by Plaintiff 15 and offering fair market value, and not a breach of the AR Agreement. Plaintiff argues 16 that while the arbitration provision starts off “broad”, the limiting words “in 17 construction of the agreement” limits the arbitration agreement to certain instances, 18 which excludes its claims. Defendant argues that the arbitration provision is broad and 19 covers the issues arising from the termination of the AR Agreement. 20 “[A]rbitration is a matter of contract and a party cannot be required to submit to 21 arbitration any dispute which he has not agreed so to submit.” AT & T Tech., Inc. v. 22 Commc’n Workers of Am., 475 U.S. 643, 648 (1986); Chiron Corp. v. Ortho 23 Diagnostic Sys., Inc., 207 F.3d 1126, 1130 (9th Cir. 2000) (“it is a way to resolve those 24 disputes-but only those disputes-that the parties have agreed to submit to arbitration.”) 25 However, any doubts as to arbitrability must be resolved in favor of coverage and “[a]n 26 order to arbitrate the particular grievance should not be denied unless it may be said 27 with positive assurance that the arbitration clause is not susceptible of an interpretation 28 that covers the asserted dispute.” AT&T Tech., Inc., 475 U.S. at 650. -5- [14cv2773-GPC(MDD)] 1 The AR Agreement 2 3 4 5 6 7 (Dkt. No. 5-1, Serra Decl., Ex. E at 43 (UNDER SEAL).) 8 Plaintiff’s argument that “in construction of the agreement” limits the arbitration 9 agreement is without merit because the phrase “in construction of the agreement “ is 10 not contained in the dispute resolution paragraph. 11 12 13 . While it is true that Plaintiff’s causes of action do not 14 allege breach of contract based on the AR Agreement, it is based on harm that allegedly 15 occurred when the AR Agreement was terminated. After the AR Agreement was 16 terminated, Defendant allegedly prevented third parties from bidding on and making 17 offers for Sprint stores owned and successfully managed by Plaintiffs. (Dkt. No. 8 at 18 5.) The allegations of interference with business and contractual relations, and unfair 19 business practices arise from the termination of the AR Agreement. Accordingly, the 20 scope of the arbitration provision covers the causes of action alleged by Plaintiff. 21 C. Validity of Arbitration Provision 22 Plaintiff argues that the arbitration provision is both procedurally and 23 substantively unconscionable. Defendant disagrees. 24 In California, a contract must be both procedurally and substantively 25 unconscionable to be rendered invalid. Chavarria v. Ralphs Grocery Co., 733 F.3d 26 916, 922 (9th Cir. 2013). The procedural component focuses on oppression, and 27 surprise due to unequal bargaining power. Armendariz v. Fdn. Health Psychcare 28 Servs., Inc., 24 Cal. 4th 83, 114 (2000). The substantive element focuses on “overly -6- [14cv2773-GPC(MDD)] 1 harsh” or “one-sided” results. Id. This element “has to do with the effects of the 2 contractual terms and whether they are unreasonable.” Marin Storage & Trucking, Inc. 3 v. Benco Contracting and Eng’g, Inc., 89 Cal. App. 4th 1042, 1053 (2001). Courts 4 apply a sliding scale where procedural and substantive unconscionability need not be 5 present in the same degree such that a showing of greater substantive unconscionability 6 will require less evidence of procedural unconscionability. Armendariz, 24 Cal. 4th 7 at 114. However, both procedural and substantive unconscionability must be present 8 “in order for the court to exercise its discretion to refuse to enforce a contract or clause 9 under the doctrine of unconscionability.” Stirlen v. Supercuts, 51 Cal. App. 4th 1519, 10 1533 (1997). The party opposing arbitration bears the burden to demonstrate 11 unconscionability. Sonic–Calabasas A, Inc. v. Moreno, 57 Cal. 4th 1109, 1148 (2013); 12 Pinnacle Museum Tower Ass’n v. Pinnacle Market Dev. (US), LLC, 55 Cal. 4th 223, 13 247 (2012). 14 1. 15 Procedural unconscionability “addresses the circumstances of contract Procedural Unconscionability 16 negotiation and formation, focusing on oppression or surprise due to unequal 17 bargaining power.” Pinnacle Museum Tower Ass’n, 55 Cal. 4th at 246 (citing 18 Armendariz, 24 Cal. 4th at 114). “Oppression arises from an inequality of bargaining 19 power which results in no real negotiation and an absence of meaningful choice,” while 20 “[s]urprise involves the extent to which the terms of the bargain are hidden in a ‘prolix 21 printed form’ drafted by a party in a superior bargaining position.” Serpa v. California 22 Surety Investigations, Inc., 215 Cal. App. 4th 695, 703 (2013) (citations and quotations 23 omitted); see also Mercuro v. Superior Court, 96 Cal. App. 4th 167, 174 (2002) 24 (“procedural unconscionability focuses on the oppressiveness of the stronger party’s 25 conduct”). 26 In analyzing procedural unconscionability, the court first focuses on whether the 27 contract was one of adhesion. Armendariz, 24 Cal. 4th at 114. A contract of adhesion 28 is “a standardized contract, which, imposed and drafted by the party of superior -7- [14cv2773-GPC(MDD)] 1 bargaining strength, relegates to the subscribing party only the opportunity to adhere 2 to the contract or reject it.” Id. at 113 (employment contract where arbitration 3 agreement was condition of employment and there was no opportunity to negotiate). 4 Under California law, a contract of adhesion has an element of procedural 5 unconscionability because it is “presented on a take-it-or-leave-it basis and [is] 6 oppressive due to ‘an inequality of bargaining power that result[ed] in no real 7 negotiation and an absence of meaningful choice.’” Nagrampa v. MailCoups Inc., 469 8 F.3d 1257, 1281 (9th Cir. 2006). 9 Plaintiff argues that AR Agreement was written by Defendant and it had no 10 bargaining power. Andrew Haisha states that during the contract negotiation stage, he 11 never met Defendant face-to-fact to negotiate any terms but it was merely emailed to 12 Defendant to e-sign. (Dkt. No. 8-1, Haisha Decl. at 2.) He also states that “[i]f there 13 was anything I didn’t like in the contract, Defendant wasn’t going to negotiate with me 14 and I felt I had one of two choices –either I take the deal as is or leave it.” (Id.) In 15 reply, Defendant argues that Haisha is a sophisticated corporation that alleged it 16 operated six highly successful retail wireless phone stores; that it was selected by 17 Sprint to be a Preferred Dealer in 2009; that Preferred Dealers are held to the same 18 standard of quality, image and customer service as Sprint corporate stores; that its 19 stores were consistently ranked amongst the very top independent Sprint dealers in 20 customer service, sales and other key performance metrics; and that at the time of 21 termination, it had net profits of over $400,000 per year. (Dkt. No. 9 at 5.) As such, 22 it contends that there was no oppression or surprise in the contracting process and the 23 arbitration provision should be enforced. 24 Without specific factual support, Plaintiff conclusorily alleges that Defendant 25 was not going to negotiate any terms of the contract and he “felt” like he had to either 26 take it or leave it. There is no indication whether Andrew Haisha attempted to 27 negotiate any portion of the contract and/or whether he objected to the terms of the 28 arbitration provision, and no evidence that Plaintiff could not have negotiated with -8- [14cv2773-GPC(MDD)] 1 Defendant regarding this term if he had asked. See e.g. Ulbrich v. Overstock.Com, 2 Inc., 887 F. Supp. 2d 924, 932 (N.D. Cal. 2012) (no procedural unconscionability 3 where while the plaintiff did not negotiate the terms of the arbitration provision and 4 was not aware of such agreement before his first day of work, there was no evidence 5 that the plaintiff could not have negotiated regarding this term if he had so requested 6 as he did with other terms in the employment agreement and while plaintiff felt 7 “compelled” to sign the agreement, the plaintiff offered no facts to support that bald 8 assertion.) 9 Moreover, the cases cited by Plaintiff concern employees or individual 10 subscribers or consumers where courts have held there is unequal bargaining power. 11 In this case, Plaintiff and Defendant are two sophisticated corporate entities. While 12 Sprint has stronger bargaining power due to its national presence, Haisha Corporation 13 did not have weak bargaining power. Haisha was successful and alleged it was a top 14 performing independent dealer and every year, it added an additional retail store. 15 In addition, the Court notes, and Plaintiff do not allege that there was no 16 surprise. The dispute resolution provision is not embedded in the contract and hidden 17 in a “prolix printed form”, see Serpa, 215 Cal. App. 4th at 703, but the dispute 18 resolution process is attached as a separate exhibit which is attached to the AR 19 agreement. See Molina v. Scandinavian Designs, Inc., No. 13cv4256 NC, 2014 WL 20 1615177, at *7 (N.D. Cal. Apr. 21, 2014) (amount of procedural unconscionabilty is 21 limited by the fact that the arbitration agreement was not buried in a lengthy contract 22 but was rather presented as a separate two page document); Roman v. Superior Court, 23 172 Cal. App. 4th 1462, 1470–71 (2009) (despite adhesive contract, finding that 24 procedural unconscionability of arbitration provision was limited because “it was [not] 25 buried in a lengthy employment agreement[,]” but was instead “contained on the last 26 page of a seven-page employment application . . . [and] was set forth in a separate, 27 succinct (four-sentence) paragraph that [plaintiff] initialed, affirming she had seen it. 28 . . . ”); but see Higgins v. Superior Court, 140 Cal. App. 4th 1238, 1252–1253 (2006) -9- [14cv2773-GPC(MDD)] 1 (procedural unconscionability was high when arbitration provision was buried in 2 24–page, single-spaced document and, “[a]lthough petitioners were required to place 3 their initials in boxes adjacent to six other paragraphs, no box [for initials] appeared 4 next to the arbitration provision”.) In conclusion, the Court finds that there is a small 5 amount of procedural unconscionability due to the slight unequal bargaining power 6 between Sprint and Haisha. 7 Plaintiff also argues that the arbitration provision is procedurally unconscionable 8 because Defendants failed to attach a copy of the arbitration rules to the contract. 9 Defendant does not address this argument. 10 The courts of appeals have reached different conclusions as to whether an 11 arbitration provision is procedurally unconscionable when a copy of the arbitration 12 rules is not attached to the contract. Tiri v. Lucky Chances, Inc., 226 Cal. App. 4th 13 231, 246 n. 9 (2014). Some courts have held that the failure to provide arbitration rules 14 can be deemed procedurally unconscionable, Sparks v. Vista Del Mar Child and Family 15 Servs., 207 Cal. App. 4th 1511, 1523 (2012), Trivedi v. Curexco Technology Corp., 16 189 Cal. App. 4th 387, 393 n.4 (2010), and Harper v. Ultimo, 113 Cal. App. 4th 1402, 17 1406–07 (2003); while other cases have held that procedural unconscionability can be 18 avoided if the arbitration rules are incorporated into the contract by reference, such 19 incorporation is clear, and the rules are readily available or easily accessible on the 20 Internet and the plaintiff did not lack the means or capacity to retrieve them. Lane v. 21 Francis Capital Mgmt., 224 Cal. App. 4th 676, 690 (2014) (failure to attach AAA rules 22 to arbitration agreement did not render the agreement procedurally unconscionable, 23 because rules were easily accessible on the Internet and plaintiff did not lack means or 24 capacity to retrieve them). 25 In Lane, the court held that “[a] failure to attach the arbitration rules could be a 26 factor supporting a finding of procedural unconscionability where the failure would 27 result in surprise to the party opposing arbitration.” Lane, 224 Cal. App. 4th at 690; 28 see also Peng v. First Republic Bank, 219 Cal. App. 4th 1462, 1466 (2013) (failure to - 10 - [14cv2773-GPC(MDD)] 1 attach AAA rules, standing alone, insufficient grounds to find procedural 2 unconscionability in employment case where employee had 25 days to consider 3 employment offer that included arbitration agreement); Medlin Ins. Agency v. QBE 4 Ins. Corp., No. 12cv2773 AWI DLB, 2012 WL 2499952, at *5 (E.D. Cal. June 27, 5 2012) (failure to provide arbitration rules is not, itself, enough to establish procedural 6 unconscionability). The court held that a failure to attach the arbitration rules, by itself, 7 is not sufficient to support a finding of procedural unconscionability. Id. In Lane, the 8 court concluded, in a former employee/employer action, that the arbitration rules 9 referenced in the agreement were easily accessible to the parties on the Internet. Id. at 10 691. Moreover, the plaintiff was a formerly well-paid professional analyst and did not 11 appear to lack the means or capacity to locate and retrieve a copy of the referenced 12 rules. Id. at 691-92. In the absence of oppression or surprise, the court concluded that 13 the failure to attach a copy of the AAA rules did not make the agreement procedurally 14 unconscionable. Id. at 692. 15 Some district courts have declined to follow California cases that hold that a 16 failure to attach arbitration rules renders an arbitration provision unenforceable, and 17 instead have have held that failure to provide arbitration rules to the agreement does 18 not render the agreement procedurally unconscionable. See Fardig v. Hobboy Lobby 19 Stores, Inc., No. SACV 14-561 JVS(ANx), 2014 WL 2810025, at * 5 (C.D. Cal. June 20 13, 2014); Ulbrich v. Overstock.Com, Inc., 887 F. Supp. 2d 924, 932 (N.D. Cal. 2012) 21 (employer’s failure to provide employee copy of AAA rules did not render agreement 22 procedurally unconscionable because incorporation of rules was clear and rules were 23 readily available.); Howard v. Octagon, Inc., No. 13–cv–01111 PJH, 2013 WL 24 5122191, at *16 (N.D. Cal. Sept. 13, 2013) (supporting cases that find the arbitration 25 agreement’s clear incorporation of the AAA Rules and the availability of the AAA 26 Rules to weigh against finding procedural unconscionability). In Fardig, the district 27 court noted that despite California cases holding that failure to attach arbitration rules 28 renders an arbitration clause unconscionable, the court held that failure to attach the - 11 - [14cv2773-GPC(MDD)] 1 arbitration rules to the agreements did not render them procedurally unconscionable. 2 Fardig, 2014 WL 2810025 at *5. The district court cited to the United States Supreme 3 Court decision in AT&T Mobility LLC v. Conception, 131 S. Ct 1740, 1761 (2011) 4 where the Court stated that “we have repeatedly referred to the [FAA’s] basic objective 5 as assuring that courts treat arbitration agreements ‘like all other contracts.’” Id. The 6 district court explained that a general rule that arbitration rules must be attached to an 7 employment agreement in order to avoid a finding of procedural unconscionability 8 would place arbitration contracts on a different footing than other contracts when it 9 comes to the doctrine of incorporation by reference. Id. The court concluded that 10 treating arbitration contracts differently is explicitly prohibited by the Supreme Court’s 11 decision. Id. 12 Furthermore, in Ulbrich, the district court referred to general California rules of 13 contract interpretation which allows incorporation by reference as long as it is clear and 14 the incorporated rules are readily available. Ulbrich, 887 F. Supp. 2d at 932-33 (citing 15 Williams Const. Co. v. Standard-Pacific Corp., 254 Cal. App. 2d 442, 454 (1967) (“A 16 contract may validly include the provision of a document not physically a part of the 17 basic contract.”)). Therefore, the Court agrees with the reasoning in these cases that 18 based on federal caselaw and state law rules of contract interpretation, incorporation 19 by reference of the arbitration rules is sufficient to excuse attachment of the arbitration 20 rules as long as the rules are easily accessible and the plaintiff has the means and 21 capacity to retrieve them.1 22 23 24 25 26 27 28 1 In Pokorny v. Quixtar, Inc., 601 F.3d 987, 996–97 (9th Cir. 2010), the Ninth Circuit held that the alternative dispute resolution agreement was procedurally unconscionable because the agreement was offered on a take-it-or-leave it basis and the arbitration rules, which were incorporated by reference, were not attached to the agreement. The Court finds this case distinguishable to Pokorny since the Rules of Conduct were not readily available. In Pokorny, there was a high degree of both procedural and substantive unconscionability. Id. at 996. As to procedural unconscionability, it was undisputed that the Defendants occupied a superior bargaining position; that the plaintiffs did not individually participate in the negotiation of the terms of the ADR agreements and that the agreements were presented on a takeit-or-leave-it basis. Id. at 996. In addition to those facts, defendant failed to attach a copy of the Rules of Conduct to the Agreement to Arbitrate. Id. at 997. To make it - 12 - [14cv2773-GPC(MDD)] 1 2 3 (Dkt. No. 11-1, AR 4 Agreement, Ex. E ¶ 3 (UNDER SEAL).) Moreover, these rules are easily accessible 5 on the Internet and Plaintiff had the capacity and means to retrieve the rules. 6 Therefore the Court concludes that failure to attach the Rules did not make the 7 provision procedurally unconscionable. 8 Due to the slight unequal bargaining power between Plaintiff and Defendant, the 9 Court concludes there is some procedural unconscionability. Because of a showing of 10 a little procedural unconscionability, Plaintiff must demonstrate a substantial amount 11 of substantive unconscionability. Marin Storge & Trucking, Inc. v. Benco Contracting 12 and Eng’g, 89 Cal. App. 4th 1042, 1056 (2001) (“[i]n light of the low level of 13 procedural unfairness . . . a greater degree of substantive unfairness than has been 14 shown here was required before the contract could be found substantively 15 unconscionable.”); Woodside Homes of Cal., Inc. v. Superior Court, 107 Cal. App. 4th 16 723, 730 (2003) (because plaintiff home buyers were not unsophisticated or lacking in 17 choice, they established only a “low level” of procedural unconscionability and were 18 obligated to establish “a high level of substantive unconscionability.”) 19 2. 20 Substantive unconscionability focuses on the actual terms of the agreement and Substantive Unconscionability 21 evaluates whether they create an “overly harsh” or “one-sided” result. Armendariz, 24 22 Cal. 4th at 114; see also Little v. Auto Stiegler, Inc., 29 Cal. 4th 1064, 1071 (2003). 23 The question is “whether contractual provisions reallocate risks in an objectively 24 unreasonable or unexpected manner.” Serpa, 215 Cal. App. 4th at 703. “A contract is 25 not substantively unconscionable when it merely gives one side a greater benefit; 26 even more procedurally unconscionable, those rules were subject to unilateral 27 amendment by defendant at any time.” Id. The Court notes that the “Dispute Resolution Procedures” found in the “Quixtar IBO Rules of Conduct” were rules 28 specific to the defendant and not easily accessible on the Internet. - 13 - [14cv2773-GPC(MDD)] 1 rather, the term must be “so one-sided as to ‘shock the conscience.’” Pinnacle, 55 Cal. 2 4th at 246. 3 “[T]he paramount consideration in assessing conscionability is mutuality.” 4 Abramson v. Juniper Networks, Inc., 115 Cal. App. 4th 638, 657 (2004). California 5 law requires an arbitration agreement to have a “modicum of bilaterality,” see 6 Armendariz, 24 Cal.4th at 117, and arbitration provisions that are “unfairly one-sided” 7 without justification, are substantively unconscionable, see Little, 29 Cal. 4th at 10718 72; Stirlen, 51 Cal. App. 4th at 1537-42 (employee was subject to inherent 9 shortcomings of arbitration-limited discovery, limited judicial review, limited 10 procedural protections and significant damage limitations while employer was not 11 subject to these disadvantageous limitations and had written in the agreement special 12 advantages); Kinney v. United HealthCare Servs., Inc., 70 Cal. App. 4th 1322, 1332 13 (1999) (arbitration to compel the employee but not the employer to submit claims to 14 arbitration was unconscionable). 15 16 a. Forum Selection Clause Plaintiff argues that the forum selection clause2 17 18 19 20 . In opposition, Defendant states it does business in all 50 state but also 21 2 Plaintiff also contends that the choice of law provision makes the arbitration 22 provision substantively unconscionable. However, the choice of law provision is contained in the AR agreement and not in the separate arbitration provision. Parties 23 may agree to state law rules for arbitration, but the parties must clearly evidence their intent to be bound by such rules. Sovak v. Chugai Pharm. Co., 280 F.3d 1266, 1270 24 (9th Cir. 2002). Choice-of-law clauses will be interpreted as simply supplying state substantive law, and not rules for arbitration. Id. Here, the AR Agreement’s 25 choice-of-law clause provides that Virginia substantive law will apply when determining the merits of the dispute arising under the AR Agreement; it does not 26 provide that Virginia arbitration rules will apply. See Chiron Corp. v. Ortho Diagnostic Sys., Inc., 207 F.3d 1126, 1130 (9th Cir. 2000) (“the best way to harmonize 27 the choice-of-law provision with the arbitration provision is to read the former to encompass substantive principles that state courts would apply, but not to include 28 special rules limiting the authority of arbitrators”). Therefore, Plaintiff’s argument as to the choice of law provision is not applicable in challenging the arbitration provision. - 14 - [14cv2773-GPC(MDD)] 1 asserts that it will consider negotiating a mutually agreeable venue. 2 3 (Dkt. No. 11-1, AR Agreement, Ex. E ¶ 3(a) (UNDER SEAL).) “[F]orum 4 selection clauses are valid and should be given effect unless enforcement of the clause 5 would be unreasonable.” Intershop Commc’ns, AG v. Superior Court, 104 Cal. App. 6 4th 191, 196 (2002) (citing Smith, Valentino & Smith, Inc. v. Superior Court, 17 Cal.3d 7 491, 495–96 (1976)). However, if the “place and manner” restrictions of a forum 8 selection provision are “unduly oppressive,” see Bolter v. Superior Court, 87 Cal. App. 9 4th 900, 909–10 (2001), or have the effect of shielding the stronger party from liability, 10 see Comb v. PayPal, Inc., 218 F. Supp. 2d 1165, 1177 (N.D. Cal. 2002), then the forum 11 selection provision is unconscionable. 12 “California favors contractual forum selection clauses so long as they are entered 13 into freely and voluntarily, and their enforcement would not be unreasonable.” Am. 14 Online, Inc. v. Superior Court, 90 Cal. App. 4th 1, 11 (2001). “Our law favors forum 15 selection agreements as long as they are procured freely and voluntarily, with the place 16 chosen having some logical nexus to one of the parties or the dispute, and so long as 17 California consumers will not find their substantial legal rights significantly impaired 18 by their enforcement. Therefore, to be enforceable, the selected jurisdiction must be 19 ‘suitable,’ ‘available,’ and able to ‘accomplish substantial justice.’ ” Id. at 12. The 20 court also noted that “[f]orum selection clauses are important in facilitating national 21 and international commerce, and as a general rule should be welcomed” and will 22 become more ubiquitous as electronic commerce increases. Id. at 12 (quoting Wimsatt 23 v. Beverly Hills Weight Loss Clinics Int’l, Inc., 32 Cal. App. 4th 1511, 1523 (1995)). 24 Plaintiff argues that its business is in California, and that the AR Agreement was 25 executed in California (through e-signatures) and the harms afflicted upon Plaintiff by 26 Defendant occurred in California and Defendant is a Delaware Corporation with its 27 headquarters in Overland Park, Kansas. 28 Moreover, Plaintiff would have to travel at great personal - 15 - [14cv2773-GPC(MDD)] 1 financial expense across country. Moreover, the fact that neither party can transfer 2 venue or forum is overly harsh. Defendant states that Sprint products are sold 3 throughout the United States and Sprint does business in all 50 states. (Dkt. No. 9-1, 4 Drugatz Decl. ¶ 2.) However, as to the forum selection clause, Sprint states it will 5 consider negotiating a mutually agreeable venue with Haisha. (Dkt. No. 9 at 6.) Since 6 Sprint is amenable to changing the forum selection clause to a mutually agreeable 7 venue, the Court severs the forum selection clause. 8 A court has discretion to either sever an unconscionable provision from an 9 agreement or refuse to enforce the agreement in its entirety. Pokorny, 601 F.3d at 10 1005 (citing Ingle v. Circuit City Stores, Inc., 328 F.3d 1165, 1180 (9th Cir. 2003)); 11 Bolter v. Superior Court, 87 Cal. App. 4th 900, 911 (2001) (finding “place and manner” 12 in which the arbitration was to occur was unconscionable and were clearly severable 13 from the remainder of the arbitration agreement); Armendariz, 24 Cal. 4th at 124. 14 California law allows the court to sever any unconscionable provisions so long as they 15 are “merely collateral to the main purpose of the arbitration agreement.” See 16 Grabowski v. Robinson, 817 F. Supp. 2d 1159, 1179 (S.D. Cal. 2011) (citing 17 Armendariz, 24 Cal. 4th at 124); see also Pokorny, 601 F.3d at 1005. “In exercising 18 this discretion, courts look to whether the ‘central purpose of the contract is tainted 19 with illegality’ or ‘the illegality is collateral to [its] main purpose.’” Ingle, 328 F.3d 20 at 1180. 21 The Court concludes that the forum selection clause is “merely collateral” to the 22 main purpose of the agreement and that it can easily be severed from the Agreement. 23 See Grabowski, 817 F. Supp. 2d at 1179. Therefore, because Defendant is amenable 24 to changing the forum selection clause to a mutually agreeable location, the Court 25 severs the forum selection clause. 26 27 b. Lack of Mutuality Plaintiff summarily argues there is lack of mutuality 28 - 16 - [14cv2773-GPC(MDD)] 1 2 3 4 5 . 6 (Dkt. No. 11-1, Ex. A at 45 (UNDER SEAL).) 7 The California Supreme Court held that lack of mutuality in a contract of 8 adhesion does not necessarily render the contract invalid. Armendariz, 24 Cal. 4th at 9 117. In Stirlen, the court recognized that a contract can provide the party with superior 10 bargaining strength with a “margin of safety” for which it has a legitimate commercial 11 need without being unconscionable. Stirlen v. Supercuts, Inc., 51 Cal. App. 4th 1529, 12 1536 (1997). “However, unless the ‘business realities’ that create the special need for 13 such an advantage are explained in the contract itself . . . it must be factually 14 established.” Id. 15 Here, the parties do not provide facts supporting the “business realities.” 16 However, in Moody, the district court concluded that a similar injunctive relief 17 provision, as in this case, was not substantively unconscionable because there was a 18 legitimate commercial reason despite the fact that the section did not provide the same 19 rights to both parties. Moody v. Metal Supermarket Franchising America, Inc., No. C 20 13-5098 PJH, 2014 WL 988811, at *5 (N.D. Cal. Mar. 10, 2014). In Moody, the court 21 noted that the provision allowing the defendant to seek injunctive relief from a court 22 of competent jurisdiction, and not the Plaintiff is limited to instances where there is no 23 adequate remedy at law or which may cause defendant irreparable harm. Id. The 24 provision stated that irreparable harm may be presumed if there is a violation of certain 25 sections concerning the use of defendant’s trademarks and confidential information and 26 a non-competition covenant in case plaintiff were to transfer his franchise to someone 27 else. Id. The court explained that the defendant “has a commercial need that is not 28 shared by plaintiff” since the defendant is making its trademarks and confidential - 17 - [14cv2773-GPC(MDD)] 1 information available to the other and it is the defendant who faces the possibility that 2 plaintiff will transfer his franchise agreement and start his own independent business. 3 Id. 4 S i m i l a r l y , i n t h i s c a s e , t h e 5 provision 6 . 7 8 . (Dkt. No. 11-1, AR Agreement ¶ 8.9 (UNDER SEAL).) 9 . (Id. ¶ 10 10 (UNDER SEAL).) Here, Defendant has a legitimate commercial interest and need for 11 seeking injunctive relief that Plaintiff does not. See Moody, 2014 WL 988811 at 5; but 12 see Martinez v. Master Protection Corp., 118 Cal. App. 4th 107, 115 (2004) 13 (employment agreement exempting from arbitration claims most likely brought by 14 employers such as “injunctive and/or other equitable relief for unfair competition 15 and/or the use and/or unauthorized disclosure of trade secrets or confidential 16 information” which are claims typically asserted by employers but requires employees 17 to arbitrate claims they are most likely to assert); Mercuro v. Superior Court, 96 Cal. 18 App. 4th 167, 176 (2002) (employment arbitration agreement unfairly one sided as the 19 agreement compels arbitration of the claims employee are most likely to bring against 20 employer but agreement excluded claims most likely to be brought against employee 21 such as “injunctive relief and/or other equitable relief for intellectual property 22 violations, unfair competition and/or the use and/or unauthorized disclosure of trade 23 secrets or confidential information”). Accordingly, the Court concludes that Plaintiff 24 has not demonstrated lack of mutuality. 25 Based on the little procedural unconscionability and no substantive 26 unconscionability shown by Plaintiff, especially in light of the fact that the forum 27 selection clause will be severed from the Agreement, the Court concludes that the 28 arbitration provision is not unconscionable and the arbitration provision is - 18 - [14cv2773-GPC(MDD)] 1 enforceable.3 Accordingly, the Court GRANTS Defendant’s motion to compel 2 arbitration and DISMISSES4 the complaint. 3 4 Conclusion Based on the above, the Court GRANTS Defendant’s motion to compel 5 arbitration and DISMISSES the complaint. The Court also severs the forum selection 6 clause in the AR Agreement and the parties are directed find a mutually agreeable 7 location for arbitration. The Clerk of Court shall close the case. The hearing date set 8 for January 16, 2015 shall be vacated. 9 IT IS SO ORDERED. 10 11 DATED: January 14, 2015 12 HON. GONZALO P. CURIEL United States District Judge 13 14 15 16 17 18 19 20 21 22 23 24 3 Since the Court finds that the arbitration provision is enforceable, and grants 25 Defendant’s motion to compel arbitration, the Court need not address Defendant’s alternative argument that the complaint should be dismissed for failure to state a claim. 26 4 Defendant also argued, alternatively, that the Court grant the motion to compel 27 arbitration and stay the case. Plaintiff opposes a stay because the case should not even go to arbitration. Plaintiff presents no argument for a stay if the Court granted 28 Plaintiff’s motion to compel arbitration. Accordingly, the Court declines to address Defendant’s alternative argument. - 19 - [14cv2773-GPC(MDD)]

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.