Nevada Deanza Family Limited Partnership v. Tesoro Refining & Marketing Company LLC et al, No. 5:2019cv03773 - Document 66 (N.D. Cal. 2020)

Court Description: ORDER GRANTING DEFENDANTS' MOTION TO DISMISS THE COMPLAINT-IN-INTERVENTION; GRANTING LEAVE TO AMEND. Re: Dkt. No. 60 . FirstElement may file an amended complaint by 8/10/2020. The defendants must answer or file a responsive pleading within fourteen days of being served the amended complaint. Signed by Judge Nathanael Cousins. (lmh, COURT STAFF) (Filed on 7/27/2020)

Download PDF
Nevada Deanza Family Limited Partnership v. Tesoro Refining & Marketing Company LLC et al Doc. 66 1 2 3 4 5 UNITED STATES DISTRICT COURT 6 NORTHERN DISTRICT OF CALIFORNIA 7 8 9 NEVADA DEANZA FAMILY LIMITED PARTNERSHIP, Plaintiff, and 10 FIRST ELEMENT FUEL, INC., 11 United States District Court Northern District of California Plaintiff-in-Intervention, 12 v. 13 14 15 16 TESORO REFINING & MARKETING LLC, MARATHON PETROLEUM CORPORATION and MARATHON PETROLEUM COMPANY LP., Case No. 5:19-cv-03773-NC ORDER GRANTING DEFENDANTS’ MOTION TO DISMISS THE COMPLAINT-ININTERVENTION; GRANTING LEAVE TO AMEND Re: Dkt. No. 60. Defendants. 17 18 Plaintiff Nevada DeAnza Family Limited Partnership brings this case against 19 Defendants Tesoro Refining & Marketing Company and Marathon Petroleum Corporation 20 for rescission of contract and fraud arising out of a gas station franchising agreement. 21 Intervening Plaintiff FirstElement Fuel, who leased portions of the gas station from NDF, 22 intervened in the lawsuit. Before the Court is Defendants’ motion to dismiss 23 FirstElement’s complaint-in-intervention for lack of jurisdiction due to the presence of a 24 political question under Rule 12(b)(1) and for failure to state a claim under Rule 12(b)(6). 25 The Court concludes that no political question is present, but that FirstElement fails to 26 state a claim under Rule 12(b)(6) as to all of its causes of action. Accordingly, the Court 27 GRANTS Defendants’ motion to dismiss and GRANTS FirstElement leave to amend the 28 complaint-in-intervention. Dockets.Justia.com 1 Background 2 A. Factual Allegations 3 The following facts are alleged in the complaint-in-intervention. Dkt. No. 54. The 4 Court takes these allegations as true for the purposes of deciding this Order. Cahill v. 5 Liberty Mut. Ins. Co., 80 F.3d 336, 337–38 (9th Cir. 1996). 6 United States District Court Northern District of California I. Plaintiff Nevada DeAnza Family Limited Partnership (“NDF”) owns a fueling 7 station in Sunnyvale, California. See Dkt. No. 54 ¶ 3. In July 2016, NDF agreed to lease 8 part of the Sunnyvale Station to Plaintiff-Intervenor FirstElement to install hydrogen fuel 9 dispensers; their agreement is known as the Site Lease. Id. ¶¶ 3, 7. The site plan for the 10 Sunnyvale Station showed that the hydrogen dispensers were to be located under its 11 canopy because that was the only possible location for hydrogen dispensers at the station. 12 Id. ¶¶ 6, 7, 31, 36. Since 2016, FirstElement and NDF have expended tremendous time 13 and money to install hydrogen dispensers at the Sunnyvale Station. Id. ¶ 7, 42–51. 14 Also in 2016, NDF began negotiating an exclusive petroleum supply and branding 15 contract with Defendant Tesoro Refining & Marketing Company. Id. ¶ 5, 32. Before 16 agreeing to brand the Sunnyvale Station, NDF informed Tesoro that it intended to install a 17 hydrogen dispenser under the canopy. Id. ¶ 6, 35–41. Tesoro did not object or otherwise 18 indicate that the location of the hydrogen dispenser was an issue. Id. In December, Tesoro 19 and NDF signed the Retail Service Agreement (RSA) for rebranding the Sunnyvale Station 20 as a “Mobil” station. Id. ¶ 8, 32, 53. Following the rebranding, NDF informed Tesoro and 21 Tesoro’s successor, Defendant Marathon Petroleum Corporation, about its hydrogen 22 dispenser plans and received no objection. Id. 23 In 2019, Marathon notified NDF for the first time that NDF would not be allowed to 24 install hydrogen dispensers under the canopy. Id. ¶ 9, 68. The following year, Tesoro 25 terminated the RSA and stated that the reason for the termination was the construction of 26 the hydrogen dispensers. Id. ¶ 11, 73. Dkt. No. 54, Ex. 3. As a result, the NDF lost its 27 supply of petroleum and lost its branding contract. See Dkt. No. 54 ¶ 11. FirstElement 28 lost $130,019 from missing the California Energy Commission Grant’s opening deadline 2 1 for the hydrogen dispensers and $607,500 in missed credit generation. Id. ¶¶ 84, 85. 2 B. Procedural Background 3 NDF filed its complaint against Defendants for rescission of contract, fraud, and 4 violation of California’s Unfair Competition Law. See Dkt. No. 1. FirstElement 5 subsequently moved to intervene in the case. See Dkt. No. 44. After the court granted the 6 motion, FirstElement filed a complaint in intervention against Defendants for: (1) 7 interference of contractual relationship, (2) violation of California’s Unfair Competition 8 Law, and (3) declaratory judgment. See Dkt. No. 54. All parties consented to the jurisdiction of a magistrate judge under 28 U.S.C.A. § 9 10 United States District Court Northern District of California 11 636(c). See Dkt. Nos. 5, 12, 46. II. Legal Standard 12 A. Federal Rule of Civil Procedure 12(b)(1) 13 Dismissal under Federal Rule of Civil Procedure 12(b)(1) is appropriate when the 14 complaint fails to establish the court’s subject matter jurisdiction over the action. Roberts 15 v. Corrothers, 812 F.2d 1173, 1177 (9th Cir. 1987). The court has a “responsibility to 16 decide[] cases properly before it, even those it would gladly avoid.” Zivotofsky ex rel. 17 Zivotofsky v. Clinton, 566 U.S. 189, 195 (2012). However, the “presence of a political 18 question deprives a court of subject matter jurisdiction.” Corrie v. Caterpillar, Inc., 503 19 F.3d 974, 980 (9th Cir. 2007). This “narrow” exception, known as the political question 20 doctrine, “excludes from judicial review those controversies which revolve around policy 21 choices and value determinations constitutionally committed for resolution to the halls of 22 Congress or the confines of the Executive Branch.” Zivotofsky, 566 U.S. at 195; Japan 23 Whaling Ass’n v. Am. Cetacean Soc., 478 U.S. 221, 230 (1986). 24 B. Federal Rule of Civil Procedure 12(b)(6) 25 A motion to dismiss for failure to state a claim under Rule 12(b)(6) tests the legal 26 sufficiency of a complaint. Navarro v. Block, 250 F.3d 729, 732 (9th Cir. 2001). On a 27 motion to dismiss, all allegations of material fact are taken as true and construed in the 28 light most favorable to the non-movant. Cahill, 80 F.3d at 337–38. The Court, however, 3 1 need not accept as true “allegations that are merely conclusory, unwarranted deductions of 2 fact, or unreasonable inferences.” In re Gilead Scis. Secs. Litig., 536 F.3d 1049, 1055 (9th 3 Cir. 2008). A complaint need not give detailed factual allegations but must contain 4 sufficient factual matter, accepted as true, to “state a claim to relief that is plausible on its 5 face.” Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007). A claim is facially plausible 6 when it “allows the court to draw the reasonable inference that the defendant is liable for 7 the misconduct alleged.” Ashcroft v. Iqbal, 556 U.S. 662, 678 (2009). If a court grants a 8 motion to dismiss, the plaintiff should be given leave to amend unless the pleading could 9 not possibly be cured by the allegation of other facts. Lopez v. Smith, 203 F.3d 1122, 1127 10 United States District Court Northern District of California 11 (9th Cir. 2000). III. Discussion 12 A. Statutory Interpretation of PMPA § 2807 13 Whether hydrogen fuel is considered a renewable fuel under the Petroleum 14 Marketing Practices Act (PMPA), 15 U.S.C.A. § 2807, is a central question to the motion 15 before the Court. Plaintiff-in-intervention FirstElement contends that hydrogen should be 16 protected by the PMPA, which would mean that its installation of hydrogen dispensers at 17 NDF’s gas station does not violate any agreement with the defendants. Defendants, on the 18 other hand, argue that their contract rescission was legitimate because hydrogen is not a 19 renewable fuel under the PMPA. The Court addresses this issue before turning to the 20 parties’ arguments on the motion to dismiss. 21 Courts generally interpret a statute by the “ordinary public meaning of its terms at 22 the time of its enactment,” because “only the words on the page constitute the law adopted 23 by Congress and approved by the President.” Bostock v. Clayton Cty., 140 S. Ct. 1731, 24 1738 (2020). In interpreting a statute, courts may look to the statute’s design, object, and 25 policy—but if the statute’s language is “clear and unambiguous,” then that is the end of the 26 matter. Crandon v. United States, 494 U.S. 152, 158 (1990); United States v. Chhun, 744 27 F.3d 1110, 1116 (9th Cir. 2014) (quoting United States v. Bahe, 201 F.3d 1124, 1128 (9th 28 Cir. 2000)). Indeed, statutory interpretation should not deviate from or add to the ordinary 4 United States District Court Northern District of California 1 meaning of statutory terms “inspired only by extratextual sources and . . . imaginations” 2 because doing so risks “amending statutes outside the legislative process.” Bostock, 140 S. 3 Ct. at 1738. 4 The PMPA prohibits franchise agreements from restricting the installation of 5 renewable fuel pumps. It states that “[n]o franchise-related document . . . shall contain any 6 provision allowing a franchisor to restrict the franchisee or any affiliate from installing on 7 the marketing premises of the franchisee a renewable fuel pump or tank.” See Dkt. No. 60 8 at 12; 15 U.S.C.A. § 2807(b)(1)(A). The PMPA also prohibits the restriction of 9 converting, advertising, and selling renewable fuel. Id. The PMPA includes a definition 10 for what constitutes a “renewable fuel.” 15 U.S.C.A. § 2807(a)(1). To constitute a 11 renewable fuel for the purposes of § 2807, a fuel needs to be either: “(A) at least 85 12 percent of the volume of which consists of ethanol; or (B) any mixture of biodiesel and 13 diesel or renewable diesel determined without regard to any use of kerosene and 14 containing at least 20 percent biodiesel or renewable diesel.” Id. The parties agree that 15 hydrogen fuel does not satisfy either statutory definition. See Dkt. No. 54 ¶¶ 102–05. 16 Here, the meaning of “renewable fuel” under the PMPA is unambiguous: the statute 17 provides two clear definitions for what it protects. No language in the statute suggests that 18 it is intended to include fuel types other than those covered by its two definitions. 19 Hydrogen is neither 85% ethanol, nor is it a mixture of biodiesel and diesel or renewable 20 diesel containing at least 20% biodiesel or renewable diesel. The statute’s language leaves 21 no room for expansion of those definitions. 22 FirstElement argues that the Court should interpret § 2807 to include hydrogen as a 23 renewable fuel. They point out that the PMPA was passed in 2007, but that hydrogen fuel 24 was not used in commercially-produced automobiles until 2013. Compl. ¶ 102. They 25 suggest that because hydrogen fuel has since been endorsed and encouraged at both the 26 state and federal levels, it should be included within § 2807’s scope. Id. ¶ 106. In 2005, 27 for example, a subchapter on hydrogen was enacted under the National Energy Policy and 28 Programs codified in Chapter 149 of the United States Code. Id. ¶ 103. 5 1 The Court is not persuaded by FirstElement that principles of statutory 2 interpretation direct a finding that hydrogen fuel is included in § 2807. FirstElement 3 admits that the language of the statute does not describe hydrogen fuel as a protected 4 renewable fuel. Outside its language, FirstElement fails to point to any history, policy, or 5 design of the PMPA to show that it should include hydrogen fuel. Instead, FirstElement 6 describes contemporary policies of both the California state and federal governments that 7 generally encourage hydrogen fuel usage. This is not enough to establish that the PMPA 8 in particular should be interpreted to include it. United States District Court Northern District of California 9 Instead, the language of the statute controls. Because the meaning of renewable 10 fuel under § 2807 is plainly defined and no ambiguity is present, the Court’s job is done. 11 Bostock, 140 S. Ct. at 1749. Accordingly, the Court finds that hydrogen fuel is not 12 considered a renewable fuel by PMPA § 2807. 13 B. FirstElement’s Claims Do Not Present A Non-Justiciable Political Question. 14 In Baker v. Carr, the Supreme Court established six factors that implicate a political 15 16 17 18 19 20 21 question: (1) a textually demonstrable constitutional commitment of the issue to a coordinate political department; (2) a lack of judicially discoverable and manageable standards for resolving it; (3) the impossibility of deciding without an initial policy determination of a kind clearly for nonjudicial discretion; (4) the impossibility of a court’s undertaking independent resolution without expressing lack of the respect due coordinate branches of government; (5) an unusual need for unquestioning adherence to a political decision already made; or (6) the potentiality of embarrassment from multifarious pronouncements by various departments on one question. 22 369 U.S. 186, 217 (1962). “The Supreme Court recently has placed more weight on the 23 first two factors,” but “dismissal is appropriate if ‘one of these six formulations is 24 inextricable from the case at bar.’” Ctr. for Biological Diversity v. Mattis, 868 F.3d 803, 25 822 (9th Cir. 2017) (citing Baker, 369 U.S. at 217). 26 Here, the political question issue centers on the interpretation of “renewable fuel” in 27 PMPA § 2807. Defendants contend that FirstElement’s claims—for intentional 28 interference with contractual relations, violation of California’s Unfair Competition Law, 6 1 and declaratory relief—present a political question because they argue that these claims 2 ask the Court to go beyond the PMPA to include hydrogen as a renewable fuel. Dkt. No. 3 60 at 12. Therefore, Defendants argue, the Court lacks jurisdiction over the complaint-in- 4 intervention. “[T]he political question doctrine requires analysis on a claim-by-claim 5 basis.” Mattis, 868 F.3d at 815. Accordingly, the court discusses each claim in turn. 1. FirstElement’s Request for Declaratory Relief is not Barred by the Baker Factors 6 7 8 Defendants contend that FirstElement’s declaratory relief claim presents a political question under the first Baker factor because the claim essentially requests that the Court 9 amend an existing law, which is a power assigned only to the legislative branch. Dkt. No. 10 United States District Court Northern District of California 11 12 13 60 at 9. However, the Court finds that FirstElement’s claim does not require that the Court supplant Congress’s judgment by adding to the PMPA’s definition of renewable fuel. Instead, the Court need only determine whether the PMPA’s intent was to include hydrogen once the fuel became commercially available for vehicles. As such, the Court is 14 15 16 simply “engag[ing] in the ‘familiar judicial exercise’ of reading and applying a statute, conscious of the purpose expressed by Congress.” Mattis, 868 F.3d at 812 (citing Zivotofsky, 566 U.S. at 196). For the second and third Baker factors, the Court need not 17 18 19 20 21 evaluate the country’s broad energy and environmental policy, as Defendants suggest, in order to decide Congress’s intention. The determination can be made based on the plain language of the PMPA, which gives the statute’s intent. Factor four does not apply here either because the Court need not supplant Congress’s definition of “renewable fuel.” Rather, the Court must merely apply Congress’s definition to hydrogen. Defendants 22 concede that the fifth factor is not applicable to this situation. Finally, because the Court is 23 24 not adding to Congress’s definition, there exists no risk of inconsistent pronouncements between the legislative and judicial branch, making the sixth Baker factor also 25 inapplicable. 26 Because the Court finds that the complaint-in-intervention does not present a 27 political question, the motion to dismiss on this basis is hereby DENIED. 28 7 1 2 In its intervening complaint, FirstElement alleges that Tesoro’s agents intentionally 3 misled NDF into believing that Tesoro approved the installation of the hydrogen station 4 under the canopy. This false representation allegedly amounted to interference when 5 Tesoro elected to prohibit installation of hydrogen fuel stations and hindered the Site Lease 6 agreement between NDF and FirstElement. Because FirstElement claims that Tesoro 7 intentionally interfered, the correct interpretation of the PMPA matters little to this cause 8 of action. Regardless of whether the Court finds that the PMPA encompasses hydrogen as 9 a “renewable fuel,” Tesoro’s conduct remains the same. 10 11 United States District Court Northern District of California 2. The Intentional Interference with Contractual Relationship Claim Does Not Depend on the Court’s Interpretation of the PMPA 12 13 14 3. The Unfair Competition Law Claim is not Barred by the Baker Factors Similar to the intentional interference claim, FirstElement’s UCL claim is mainly premised on Tesoro’s misrepresentation to NDF that was allegedly designed to induce NDF to agree to the RSA. FirstElement alleges that Tesoro’s refusal to allow a hydrogen fuel station violates § 2907 of the PMPA. However, as explained above, this argument 15 16 17 requires the court to merely “engage in the familiar judicial exercise of reading and applying a statute, conscious of the purpose expressed by Congress.” Mattis, 868 F.3d at 812. Thus, none of the Baker factors apply to FirstElement’s UCL claim. 18 19 20 21 C. Failure to State Claims 1. The Complaint Fails to State Sufficient Factual Matter to Show that Defendants Intentionally Interfered with Contractual Relationships The tort of intentional interference with contract requires allegations of the 22 following elements: “(1) a valid contract between plaintiff and a third party; (2) 23 defendant’s knowledge of this contract; (3) defendant’s intentional acts designed to induce 24 a breach or disruption of the contractual relationship; (4) actual breach or disruption of the 25 contractual relationship; and (5) resulting damage.” CRST Van Expedited, Inc. v. Werner 26 Enter., Inc., 479 F.3d 1099, 1105 (9th Cir. 2007). Here, the complaint satisfies the first 27 two elements of the claim by alleging that the Site Lease is a valid contract between NDF 28 and FirstElement and that NDF informed Mr. Wilson, a Tesoro franchise recruiter, about 8 1 the Site Lease. It also satisfies the fourth and fifth elements: FirstElement alleges that the 2 defendants terminated their contract, costing them over $730,000 in damages. However, 3 FirstElement fails to allege facts that establish Tesoro’s intent to disrupt the contract 4 pursuant to element three. To satisfy the intent requirement, FirstElement can either allege 5 facts that show: (1) Tesoro’s specific purpose was to disrupt the Site Lease or (2) Tesoro 6 knew that interference of the Site Lease was a necessary consequence of their action or 7 substantially certain to occur. See Korea Supply Co. v. Lockheed Martin Corp., 29 Cal. 8 4th 1134, 1153 (2003); Quelimane Co. v. Stewart Title Guar. Co., 19 Cal. 4th 26, 56 9 (1998). United States District Court Northern District of California 10 The complaint-in-intervention fails to satisfy the first method of showing intent. 11 Allegedly, Tesoro conducted three acts that interfered with the Site Lease: falsely 12 representing its position on the dispensers, asking for further details on the dispenser which 13 resulted in months of unnecessary discussion, and terminating the RSA. See Dkt. No. 54 14 ¶¶ 78-86. These acts on their face are not indicative of an intent or desire to interfere with 15 another party’s contract. FirstElement argues that Tesoro’s false representation proves 16 Tesoro’s intent to disrupt the Site Lease, because Tesoro’s representative Mr. Wilson 17 “knew that Tesoro would not have approved a Hydrogen Dispenser under the canopy,” and 18 “in the interest of expanding the Mobil brand into Northern California, he failed to disclose 19 this material fact to NDF.” Dkt. No. 54 ¶ 38. However, this at best suggests that Tesoro 20 intended to mislead NDF in order to close a deal. Moreover, the obstruction of the 21 dispenser and termination of the RSA do not plausibly show that Tesoro specifically 22 wanted to interfere with FirstElement’s contractual relationship because there are 23 alternative business explanations for terminating the RSA. See Iqbal, 556 U.S. at 682. In 24 fact, it is fairly unreasonable to assume that Tesoro would ruin a business relationship with 25 NDF primarily to interfere with the Site Lease, when there is no apparent benefit to Tesoro 26 for doing so. 27 28 FirstElement’s allegations are better furnished to prove intent through the second method. But even then, the intervening complaint does not allege sufficient facts to show 9 United States District Court Northern District of California 1 that Tesoro knew with substantial certainty that its actions would interfere with the Site 2 Lease. First, Tesoro’s false representation about the hydrogen dispenser would not have 3 interfered with the Site Lease with substantial certainty. NDF is reasonably expected to 4 read the RSA and learn of its restrictions before signing the contract. See Upton v. 5 Tribilcock, 91 U.S. 45, 50 (1875) (“[i]t will not do for a man to enter into a contract, and, 6 when called upon to respond to its obligations, to say that he did not read it when he signed 7 it, or did not know what it contained”). In reading the RSA, NDF would have discovered 8 that the agreement expressly prohibited the NDF from operating any “[a]ncillary 9 Businesses . . . unless agreed in writing,” and NDF could have then refused to sign the 10 agreement. Dkt. No. 54 Ex. 2 §§ 5(a), 6(c). See also Dkt. No. 54 Ex. 3. Additionally, the 11 complaint never alleges that Tesoro knew the specific terms and conditions of the Site 12 Lease, such as the requirement that the station remain branded and operational. Therefore, 13 Tesoro would not have known with certainty that asking for further details on the dispenser 14 or terminating the RSA would cause undue delay to the performance of the Site Lease. 15 While FirstElement alleges how Tesoro interfered with the Site Lease, it fails to 16 allege that the interference was intentional. Thus, FirstElement fails to adequately allege 17 element three of the tortious interference with contract claim. The motion to dismiss this 18 claim is hereby GRANTED. Because FirstElement could cure these deficiencies by 19 alleging additional facts, the Courts grants LEAVE TO AMEND the claim. 20 21 2. The Complaint Fails to State a Claim for Appropriate Relief under California’s Unfair Competition Law To state a claim to relief, a pleading must include a demand for relief sought. Fed. 22 R. Civ. P. 8(a)(3). Thus, to survive a 12(b)(6) motion to dismiss, a complaint must 23 plausibly request relief that the Court could grant for each claim. See Iqbal, 556 U.S. at 24 678. Because the UCL is equitable in nature, a plaintiff alleging a violation of the UCL 25 may obtain only restitution and/or injunctive relief. Stearns v. Select Comfort Retail 26 Corp., Case No. 08-cv-02746 JF, 2009 WL 1635931, at *17 (N.D. Cal. June 5, 2009). 27 Here, the complaint seeks only one form of equitable relief for its UCL claim: an 28 10 United States District Court Northern District of California 1 injunction requiring Tesoro and Marathon to accept that hydrogen fuel is within the 2 PMPA’s definition of renewable fuel. See Dkt. No. 54 at 22. As previously discussed, the 3 Court finds that PMPA’s definition of renewable fuel does not encompass hydrogen fuel 4 and thus the PMPA’s “prohibition on restriction of installation of renewable fuel pumps” 5 does not apply to hydrogen dispensers. 15 U.S.C.A. § 2807. Accordingly, the Court may 6 not grant the injunction sought because Tesoro would not violate FirstElement or NDF’s 7 statutory rights by refusing to allow NDF install hydrogen fuel dispensers. See U.S. v. W. 8 T. Grant Co., 345 U.S. 629, 633, (1953) (“The purpose of an injunction is to prevent future 9 violations”). As a result, the complaint fails to state a claim for violation of the UCL 10 because it fails to plausibly allege relief sought. The motion to dismiss this claim is hereby 11 GRANTED. Because First Element could seek alternative equitable remedies under the 12 UCL, the Court grants LEAVE TO AMEND the claim. 3. The Complaint Fails to State a Valid Declaratory Relief Claim 13 14 The Declaratory Judgment Act allows courts to “declare the rights and other legal 15 relations of any interested party seeking such declaration.” 28 U.S.C.A. § 2201. Courts 16 have discretion over whether to grant declaratory judgment and should deny relief “when it 17 will neither serve a useful purpose in clarifying and settling the legal relations in issue nor 18 terminate the proceedings and afford relief from the uncertainty and controversy faced by 19 the parties.” U.S. v. State of Wash., 759 F.2d 1353, 1357 (9th Cir. 1985). 20 FirstElement requests that the Court declare that hydrogen fuel constitutes a 21 renewable fuel under PMPA § 2807 and that Tesoro’s refusal to allow hydrogen dispensers 22 to be installed at NDF’s Sunnyvale Station runs afoul of PMPA § 2807. However, as 23 discussed above, PMPA § 2807’s definition of renewable fuel does not encompass 24 hydrogen fuel. As such, FirstElement has not established that it is entitled to this relief, 25 because PMPA § 2807 does not protect FirstElement’s hydrogen dispensers from Tesoro’s 26 restrictions. The motion to dismiss this claim is GRANTED. No further allegation of 27 facts could cure this claim, so the Court does not grant leave to amend it. Lopez, 203 F.3d 28 at 1127. 11 1 2 Conclusion The complaint-in-intervention fails to allege sufficient facts to plausibly plead its 3 claims for intentional interference with contractual relations and violation of California’s 4 Unfair Competition Law. The motion to dismiss those claims is therefore GRANTED. 5 Because FirstElement could theoretically cure the deficiencies identified in this Order, the 6 Court GRANTS LEAVE TO AMEND those claims. 7 The motion to dismiss the claim for declaratory relief is also GRANTED. Because 8 the Court has determined in this Order that it may not provide the relief sought—that is, by 9 making a finding that “hydrogen fuel” falls under the PMPA’s list of protected renewable 10 11 United States District Court Northern District of California IV. fuels—the Court does not grant leave to amend this claim. FirstElement may file an amended complaint by August 10, 2020. FirstElement 12 may not add any new claims or parties without leave of Court. The defendants must 13 answer or file a responsive pleading within fourteen days of being served the amended 14 complaint. 15 16 IT IS SO ORDERED. 17 18 19 Dated: July 27, 2020 _____________________________________ NATHANAEL M. COUSINS United States Magistrate Judge 20 21 22 23 24 25 26 27 28 12

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.