Omni Financial, LLC v. Global Petroleum, LLC et al, No. 5:2019cv00031 - Document 44 (N.D. Cal. 2019)

Court Description: ORDER GRANTING 35 MOTION FOR DEFAULT JUDGMENT AGAINST DEFENDANTS EDWARD FORTE AND PRECISE CONSTRUCTION & DISMANTLEMENT SYSTEMS, INC.; VACATING HEARING ON MOTION; VACATING INITIAL CASE MANAGEMENT CONFERENCE; AND TERMINATING AS MOOT 42 , 43 PLAINTIFF'S MOTIONS FOR TELEPHONIC APPEARANCE. Signed by Judge Beth Labson Freeman on 10/31/2019. (blflc1S, COURT STAFF) (Filed on 10/31/2019)

Download PDF
1 2 UNITED STATES DISTRICT COURT 3 NORTHERN DISTRICT OF CALIFORNIA 4 SAN JOSE DIVISION 5 6 OMNI FINANCIAL, LLC, Plaintiff, 7 8 9 10 United States District Court Northern District of California 11 12 13 14 Case No. 19-cv-00031-BLF v. GLOBAL PETROLEUM, LLC, a Minnesota limited liability company; SUZETTE JEREZ, aka SUZETTE JEREZNEAL; EDWARD FORTE, Individually and as Trustee of the Forte Family Trust; and PRECISE CONSTRUCTION & DISMANTLEMENT SYSTEMS, INC., an Illinois corporation doing business as PRECISE CONSTRUCTION, Defendants. ORDER GRANTING MOTION FOR DEFAULT JUDGMENT AGAINST DEFENDANTS EDWARD FORTE AND PRECISE CONSTRUCTION & DISMANTLEMENT SYSTEMS, INC.; VACATING HEARING ON MOTION; VACATING INITIAL CASE MANAEMENT CONFERENCE; AND TERMINATING AS MOOT PLAINTIFF’S MOTIONS FOR TELEPHONIC APPEARANCE [Re: ECF 35, 42, 43] 15 16 17 Plaintiff Omni Financial, LLC moves for default judgment against the only defendants 18 remaining in this action, Edward Forte, Individually and as Trustee of the Forte Family Trust and 19 Precise Construction & Dismantlement Systems, Inc., dba Precise Construction. The Court 20 hereby SUBMITS the motion for decision without oral argument and VACATES the hearing 21 scheduled for November 7, 2019. See Civ. L.R. 7-1(b). The motion is GRANTED for the reasons 22 discussed below. However, because the amount of reasonable attorneys’ fees and costs 23 recoverable in connection with this default judgment are not adequately documented, Plaintiff is 24 directed to submit a supplemental brief addressing reasonable attorneys’ fees and costs. 25 In light of the Court’s ruling on the motion for default judgment, the Court VACATES the 26 Initial Case Management Conference scheduled for November 7, 2019 and TERMINATES AS 27 MOOT Omni’s motions for telephonic appearance at the motion hearing and the Initial Case 28 Management Conference. 1 United States District Court Northern District of California 2 I. BACKGROUND Plaintiff Omni Financial, LLC (“Omni”) is an investment pool made up of approximately 3 500 members located in and around Santa Cruz, California. Boone Decl. ¶ 1, ECF 35-2. Omni 4 filed this action against Defendants Global Petroleum, LLC (“Global”), Suzette Jerez (“Jerez), 5 Edward Forte (“Forte”), and Precise Construction & Dismantlement Systems, Inc. (“Precise 6 Construction”). Compl., ECF 1. Omni alleges that Defendants entered into a scheme “to 7 fraudulently induce the plaintiff to enter into a joint venture and to invest money in the purported 8 purchase and sale of gold ore.” Compl. ¶ 1. Defendants “represented that the plaintiff’s 9 investment would be used to purchase gold from a third-party seller, that the defendants would 10 contribute an amount equal to plaintiff’s investment toward the purchase transaction, that the gold 11 would be sold at a profit to a buyer procured by defendants, and that OMNI’s investment would be 12 returned along with a share of profits from the sale transaction.” Id. Omni invested funds, but 13 Defendants did not use Omni’s funds to buy gold, did not contribute equal funds, and did not have 14 a third-party buyer available to purchase gold. Compl. ¶ 2. Despite Omni’s demands, Defendants 15 did not return Omni’s investment money or a share of profits. Id. Omni alleges that as a result of 16 Defendants’ fraudulent representations and promises, Omni was damaged in the amount of 17 $2,412,474.66. Compl. ¶ 4. 18 The complaint alleges the specifics of the joint venture agreement entered into by Omni 19 and Defendant Global in May 2018, and attaches a copy of the joint venture agreement and an 20 addendum to the agreement as Exhibits D and E to the complaint. Compl. ¶¶ 17-23 & Exhs. D, E. 21 Omni agreed to provide Global with the sum of $1,375,000 in return for a priority return on its 22 investment plus and additional 25% of the net profit from the gold venture. Compl. ¶ 18. As 23 security for the transaction, Global executed a Straight Note in the principal sum of $1,375,000.00, 24 plus profit sharing as provided in the joint venture agreement. Compl. ¶ 22. Global had six 25 months from the date of the agreement to provide a return on Omni’s investment. Id. Omni wired 26 Global the $1,375,000 but Global did not use the funds to purchase gold. Compl. ¶ 22. Global did 27 not have an arrangement with a third-party buyer to repurchase gold acquired with Omni’s funds, 28 and had no intention of returning Omni’s investment or sharing profits with Omni. Compl. ¶ 23. 2 1 2 Guaranty”), promising to pay the indebtedness owned by Global to Omni up to the sum of 3 $1,375,000. Compl. ¶ 24. Forte is the president of Defendant Precise Construction. Compl. ¶ 9. 4 Defendant Precise Construction also executed a payment guaranty in May 2018 (“the Precise 5 Construction Guaranty”), promising to pay the indebtedness owned by Global to Omni up to the 6 sum of $1,375,000. Compl. ¶ 25. 7 United States District Court Northern District of California In May 2018, Defendant Forte executed a loan guarantee agreement (“the Forte In November 2018, after payment had become due to Omni, Defendant Jerez (Global’s 8 president) requested a thirty-day extension on behalf of Global. Compl. ¶¶ 26-28. Global agreed 9 to pay Omni the sum of $2,295,287.50 due under the agreements, plus an additional amount of 10 $117, 187.16, for a total sum payment of $2,412,474.66, by December 10, 2018. Compl. ¶¶ 28- 11 30. On December 11, 2018, after the extended deadline for payment had expired, Defendant Jerez 12 proposed a second modification to Global’s payment terms. Compl. ¶ 31. Omni agreed to the 13 proposed second modification, under which Global was to send a wire transfer to Omni in the sum 14 of $1,512,474.66 by close of business on December 11, 2018, a second payment of $100,000 by 15 March 11, 2019, and a final payment of $800,000 by May 11, 2019. Compl. ¶ 31. Global did not 16 wire any funds on December 11, 2019. Compl. ¶ 33. On December 13, 2018, Defendant Jerez 17 sent Omni an email advising that Global had decided not to wire the funds due as agreed, but that 18 Global would wire $1,500,000 to Omni by December 14, 2018. Id. Global did not wire funds by 19 December 14, 2018. Compl. ¶ 34. On December 17, 2018, Omni’s counsel sent a written letter to 20 Defendants giving notice of default under the agreements and demanding that Defendants pay the 21 outstanding balance of $2,412,474.66 due and owing to Omni. Compl. ¶ 35. 22 Omni filed this suit on January 2, 2019, asserting claims against Global and its president 23 Jerez (collectively, “GP Defendants”), Forte, and Precise Construction for: (1) fraud – intentional 24 misrepresentation (against GP Defendants); (2) negligent misrepresentation (against GP 25 Defendants); (3) conversion (against GP Defendants); (4) breach of written contract (against GP 26 Defendants); (5) breach of fiduciary duty (against Global); (6) unjust enrichment (against GP 27 Defendants); (7) declaratory relief (against GP Defendants); (8) breach of written guaranty 28 (against Forte); and (9) breach of written guaranty (against Precise Construction). 3 United States District Court Northern District of California 1 Omni thereafter entered into a Stipulation for Entry of Judgment upon Default 2 (“Stipulation”) with Defendants Global and Jerez only, providing for settlement of the action 3 conditioned on certain payments being made by Defendants Global and Jerez to Omni. See 4 Stipulation p. 5 ¶ 4, ECF 20. In the event Defendants Global and Jerez defaulted on any of their 5 settlement obligations , Omni was entitled to enter judgment against Defendants Global and Jerez 6 on an ex parte basis in the amount of the outstanding payments due plus reasonable attorneys’ fees 7 and costs incurred in prosecuting the action or enforcing the Stipulation. See Stipulation p. 6 ¶ 6, 8 ECF 20. Defendants Global and Jerez ultimately defaulted on their settlement obligations, after 9 which the Court granted Omni’s ex parte application for entry of judgment against Global and 10 Jerez. See Order Granting Plaintiff’s Ex Parte Application, ECF 29. On February 27, 2019, the 11 Court entered judgment in favor of Omni and against Defendants Global and Jerez jointly and 12 severally in the sum of $2,500,000.00, plus attorneys’ fees and costs in the sum of $34,383.74, for 13 a total judgment of $2,534,383.74 against Defendants Global and Jerez. See Judgment Pursuant to 14 Stipulation and Order, ECF 30. On April 11, 2019, the Clerk entered default against Defendants Forte and Precise 15 16 Construction. See Entry of Default, ECF 34. Omni now seeks default judgment against 17 Defendants Forte and Precise Construction for breach of the written guaranty agreements as set 18 forth in Claims 8 and 9. See Motion for Default Judgment, ECF 35. Omni seeks judgment in the 19 sum of $1,375,000 (the guaranty amount set forth in the Forte Guaranty and the Precise 20 Construction Guaranty), as well as attorneys’ fees and costs in the amount of $62,405.65. See id. 21 Omni served the motion for default judgment and supporting documents on Forte and Precise 22 Construction by mail on May 15, 2019. See Proof of Service, ECF 36. Forte and Precise 23 Construction have not responded. 24 II. DISCUSSION 25 A. Jurisdiction and Service 26 Pursuant to Federal Rule of Civil Procedure 55, a court may grant default judgment against 27 a defendant who has failed to plead or otherwise defend an action. Fed. R. Civ. P. 55(b)(2). 28 “When entry of judgment is sought against a party who has failed to plead or otherwise defend, a 4 1 district court has an affirmative duty to look into its jurisdiction over both the subject matter and 2 the parties.” In re Tuli, 172 F.3d 707, 712 (9th Cir. 1999). The district court also must “assess the 3 adequacy of the service of process on the party against whom default is requested.” DFSB 4 Kollective Co., Ltd. v. Bourne, 897 F. Supp. 2d 871, 877 (N.D. Cal. 2012) (internal quotation 5 marks and citation omitted). 6 United States District Court Northern District of California 7 1. Subject Matter Jurisdiction The Court has subject matter jurisdiction, as there is complete diversity of citizenship 8 between Plaintiff Omni and Defendants, and the amount in controversy exceeds $75,000. Omni is 9 a California citizen because it is a limited liability company and all of its individual members are 10 California citizens. See FAC ¶ 5; Johnson v. Columbia Properties Anchorage, LP, 437 F.3d 894, 11 899 (9th Cir. 2006) (“[A]n LLC is a citizen of every state of which its owners/members are 12 citizens.”). Defendants Global and Jerez are citizens of Minnesota, while Forte and Precise 13 Construction are citizens of Illinois. See Compl. ¶¶ 6-9. 14 15 2. Personal Jurisdiction The Court also is satisfied that it has specific personal jurisdiction over Forte and Precise 16 Construction. The Ninth Circuit has established a three-prong test for whether a court can exercise 17 specific personal jurisdiction: (1) the defendant must have “either purposefully availed itself of 18 the privilege of conducting activities in California, or purposefully directed its activities toward 19 California,” thereby “invoking the benefits and protections of its laws”; (2) the claim must arise 20 out of or relate to the defendant’s forum-related activities; and (3) the exercise of jurisdiction must 21 be reasonable, i.e. it must comport with fair play and substantial justice. Schwarzenegger v. Fred 22 Martin Motor Co., 374 F.3d 797, 802 (9th Cir. 2004). The plaintiff bears the burden on the first 23 two prongs. Id. “If the plaintiff succeeds in satisfying both of the first two prongs, the burden 24 then shifts to the defendant to present a compelling case that the exercise of jurisdiction would not 25 be reasonable.” Id. (internal quotation marks and citation omitted). 26 Here, Forte and Precise Construction purposefully availed themselves of conducting 27 activities in California by entering into the guaranty agreements with Omni, a California citizen, 28 where those guaranty agreements specified that they are governed by and construed under the laws 5 1 of the State of California. See Compl. Exhs. G, H. Omni’s claims for breach of the guaranty 2 agreements arise directly out of those forum-related activities. Thus, the first two prongs of the 3 Schwarzenegger test are satisfied, and the burden shifts to Forte and Precise Construction to 4 demonstrate that exercise of jurisdiction would not be reasonable. Forte and Precise Construction 5 have not responded to Omni’s motion for default judgment, and therefore have failed to meet their 6 burden. The Court concludes that it may exercise specific personal jurisdiction over Forte and 7 Precise Construction. 3. 8 United States District Court Northern District of California 9 Service Finally, service was adequate because both Forte and Precise Construction executed 10 waivers of service of process, which were filed with the Court by Omni. See Waivers of Service, 11 ECF 24, 25. 12 B. Eitel Factors 13 Even when the jurisdiction and service requirements are satisfied, the plaintiff is not 14 automatically entitled to a default judgment, and “[t]he district court’s decision whether to enter a 15 default judgment is a discretionary one.” Aldabe v. Aldabe, 616 F.2d 1089, 1092 (9th Cir. 1980). 16 In exercising that discretion, this Court must consider the following seven factors articulated by 17 the Ninth Circuit in Eitel v. McCool (“Eitel factors”): “(1) the possibility of prejudice to the 18 plaintiff, (2) the merits of plaintiff's substantive claim, (3) the sufficiency of the complaint, (4) the 19 sum of money at stake in the action; (5) the possibility of a dispute concerning material facts; (6) 20 whether the default was due to excusable neglect, and (7) the strong policy underlying the Federal 21 Rules of Civil Procedure favoring decisions on the merits.” Eitel v. McCool, 782 F.2d 1470, 22 1471-72 (9th Cir. 1986). In evaluating the Eitel factors, well-pled allegations in the complaint are 23 taken as true, except those regarding damages. Televideo Sys., Inc. v. Heidenthal, 826 F.2d 915, 24 917-18 (9th Cir. 1987). The Court may, in its discretion, consider evidence submitted with a 25 motion for default judgment to determine damages. Id. 26 The Court finds that the Eitel factors weigh in favor of granting Omni’s motion. With 27 respect to the first factor, prejudice to the plaintiff, Omni would have no recourse against 28 Defendants Forte and Precise Construction absent entry of default judgment, because those 6 1 2 The second and third factors, addressing the merits of the plaintiff’s claims and the 3 sufficiency of the complaint, are satisfied if the plaintiff asserts claims upon which it may recover. 4 See IO Group, Inc. v. Jordon, 708 F. Supp. 2d 989, 997 (N.D. Cal. 2010). Omni seeks to recover 5 on Claims 8 and 9, alleging for breach of the guaranty agreements executed by Forte and Precise 6 Construction. Under California law, the elements of breach of contract are: “(1) the contract, (2) 7 plaintiff’s performance or excuse for nonperformance, (3) defendant’s breach, and (4) the resulting 8 damages to plaintiff.” Reichert v. Gen. Ins. Co. of Am., 68 Cal. 2d 822, 830 (1968). Omni has 9 attached the guaranty agreements and alleged facts demonstrating its performance, Defendants’ 10 United States District Court Northern District of California Defendants have elected not to respond to the complaint. breaches, and resulting damages. See Compl. ¶¶ 77-88 & Exhs. G, H. 11 With respect to the fourth factor, the sum of money at stake, Omni seeks the contractual 12 guaranty amount of $1,375,000, plus attorneys’ fees and costs that it is entitled to recover under 13 the terms of the guaranty agreements. See Compl. ¶¶ 77-88 & Exhs. G, H. In general, “[d]efault 14 judgment is disfavored when a large amount of money is involved or unreasonable in light of the 15 potential loss caused by the defendant's actions.” Li v. A Perfect Day Franchise, Inc., No. CV 16 10-01189 LHK, 2012 WL 2236752, at *11 (N.D. Cal. June 15, 2012) (citation omitted). 17 However, even where the amount of money at issue is substantial, “this factor does not 18 significantly weigh against granting default judgment” if the amount sought “is consistent with 19 that to which [the p]laintiff is entitled by law.” TVB Holdings (USA), Inc. v. eNom, Inc., No. CV 20 13-00624 JLS, 2014 WL 3717889, at *3 (C.D. Cal. July 23, 2014). As discussed above, Omni has 21 established that it is entitled to the guaranty amount of $1,375,000, and reasonable attorneys’ fees 22 and costs, under the express terms of the guaranty agreements. Thus, although Omni is seeking a 23 significant award, this factor does not weigh against default judgment. 24 The fifth factor, the possibility of a dispute regarding material facts, and the sixth factor, 25 whether the default was due to excusable neglect, also weigh in favor of default judgment. 26 Defendants Forte and Precise Construction have made no effort to dispute the facts alleged in the 27 complaint despite executing waivers of service of process. Omni also mailed a copy of the present 28 motion to Defendants Forte and Precise Construction despite the fact that no notice of the motion 7 1 was required. See Proof of Service, ECF 36; Fed. R. Civ. P. 55(b)(2) (requiring notice of motion 2 for default judgment only when the party against whom default judgment is sought has appeared 3 in the case). 4 The seventh and final factor, the strong public policy favoring decisions on the merits, 5 does not preclude default judgment when the other Eitel factors favor it. See PepsiCo, Inc. v. 6 California Sec. Cans, 238 F. Supp. 2d 1172, 1177 (C.D. Cal. 2002). Here, the failure of 7 Defendants Forte and Precise Construction to failure to answer the complaint “makes a decision 8 on the merits impractical, if not impossible.” Id. 9 United States District Court Northern District of California 10 C. Damages, Attorneys’ Fees, and Costs Omni’s claim for contractual damages in the amount of $1,375,000 is supported by the 11 guaranty agreements executed by Forte and Precise Construction and attached to the complaint. 12 See Compl. Exhs. G, H. The guaranty agreements also provide for an award of reasonable 13 attorneys’ fees and costs incurred in litigating an action arising out of the agreements. See id. 14 California Civil Code § 1717 provides that: “In any action on a contract, where the contract 15 specifically provides that attorney’s fees and costs, which are incurred to enforce that contract, 16 shall be awarded either to one of the parties or to the prevailing party, then the party who is 17 determined to be the party prevailing on the contract, whether he or she is the party specified in 18 the contract or not, shall be entitled to reasonable attorney’s fees in addition to other costs.” 19 Omni has submitted documentation that it has incurred attorneys’ fees in the amount of 20 $61,116.75 and costs in the amount of $1,288.90 in litigating this case from December 2018 21 through the present. See Backowski Decl. ¶¶ 7-14 & Exh. A. However, the guaranty agreements 22 provide for recovery of attorneys’ fees and costs arising or relating to proceedings related to the 23 agreements. See Compl. Exhs. G, H. Omni has not provided the Court with any authority for the 24 proposition that it may recover from Forte and Precise Construction those fees and costs incurred 25 in litigating claims unrelated to the guaranty agreements – for example, fraud claims against 26 Global and Jerez. Accordingly, while the Court finds it appropriate to award reasonable attorneys’ 27 fees and costs to Omni under the guaranty agreements, the Court has not been provided with the 28 documentation necessary to determine the amount of such reasonable attorneys’ fees and costs. 8 The Court therefore will grant Omni’s motion and enter default judgment against Forte and 1 2 Precise Construction, jointly and severally, in the amount of “$1,375,000 plus reasonable 3 attorneys’ fees and costs subject to proof.” Omni is directed to submit a supplemental brief, not to 4 exceed two pages, specifying the amount of reasonable attorneys’ fees and costs recoverable in 5 connection with Claims 8 and 9. Omni’s supplemental brief shall be accompanied by a chart, as 6 required by this Court’s Standing Order Re Civil Cases (available on the Court’s website), 7 breaking down the requested attorneys’ fees by task and biller. Omni also shall submit a proposed 8 amended judgment incorporating the recoverable amount of attorneys’ fees and costs attributable 9 to Claims 8 and 9. United States District Court Northern District of California 10 IV. ORDER 11 (1) Plaintiff Omni’s motion for default judgment is GRANTED; 12 (2) Consistent with this order, Plaintiff Omni shall submit a supplemental brief, 13 attorneys’ fees chart, and proposed amended judgment, on or before November 15, 14 2019; 15 (3) VACATED; 16 17 (4) 20 The Initial Case Management Conference scheduled for November 7, 2019 is VACATED; and 18 19 The hearing on the motion for default judgment scheduled for November 7, 2019 is (5) Plaintiff Omni’s motions for telephonic appearance at the motion hearing and the Initial Case Management Conference are TERMINATED AS MOOT. 21 22 23 24 Dated: October 31, 2019 ______________________________________ BETH LABSON FREEMAN United States District Judge 25 26 27 28 9

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.