Mata et al v. Manpower Inc. / California Peninsula et al, No. 5:2014cv03787 - Document 154 (N.D. Cal. 2016)

Court Description: Amended Order Granting in Part and Denying in Part 48 Defendants' Motion for Partial Summary Judgment. Signed by Judge Lucy Koh on 03/14/2016. (lhklc2S, COURT STAFF) (Filed on 3/14/2016)

Download PDF
1 2 3 4 5 6 7 8 UNITED STATES DISTRICT COURT 9 NORTHERN DISTRICT OF CALIFORNIA 10 SAN JOSE DIVISION United States District Court Northern District of California 11 12 JUVENTINA MATA, et al., Plaintiffs, 13 v. 14 15 MANPOWER INC. / CALIFORNIA PENINSULA, et al., 16 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT Re: Dkt. No. 48 Defendants. 17 18 19 20 21 Plaintiffs Claudia Padilla and Lesli Guido (“Plaintiffs”) bring this wage and hour class action against Defendants Manpower, Inc./California Peninsula (“Manpower CP”); Manpower US Inc. (“Manpower US”); Manpower Inc., now known as ManpowerGroup Inc.; and ManpowerGroup US Inc. (collectively, “Defendants”).1 Before the Court is Defendants’ motion 22 for partial summary judgment which contends: (1) that the court-approved settlement and release 23 24 25 26 27 28 1 The Court erroneously indicated that certain responses to requests for admission came from Plaintiffs, when the responses actually came from Defendants. The cited responses had no impact on the outcome of the Court’s order. Pursuant to Federal Rule of Civil Procedure 60(a), the Court issues this amended order that omits reference to any requests for admission but is otherwise unchanged. 1 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 in Willner v. Manpower Inc. prohibits the putative class members in the instant case from pursuing 2 the seventh, eighth, and ninth claims against Manpower Inc. in the instant case; and (2) that 3 Manpower US was not an employer or joint employer of Plaintiffs, and thus Plaintiffs lack 4 standing to sue Manpower US. ECF No. 48. The Court held a hearing on Defendants’ motion on 5 January 21, 2016. Having considered the parties’ submissions, the record in this case, and the 6 relevant law, the Court hereby GRANTS in part and DENIES in part Defendants’ motion. 7 I. 8 9 BACKGROUND A. The Manpower Defendants Manpower CP is a California corporation that hires individuals (known as “associates”) to provide temporary staffing services to clients in California. ECF No. 48-1 (Horne Decl.) ¶¶ 4-5. 11 United States District Court Northern District of California 10 The named Plaintiffs Padilla and Guido were employees of Manpower CP. Id. ¶ 10. 12 Manpower US, a Delaware corporation, similarly provides temporary staffing services. 13 ECF No. 48-1 ¶¶ 6-7. Manpower US began operating under the Manpower US name in December 14 2012 and began operating in California in July 2013. Id. 15 16 17 Manpower CP and Manpower US are wholly-owned subsidiaries of ManpowerGroup Inc. (which was formerly known as Manpower Inc.). Id. ¶ 2. A separate entity, Manpower Group US Inc., provides high-level oversight for both 18 Manpower CP and Manpower US, ECF No, 48-6 ¶ 4, but it is unclear from the record whether 19 ManpowerGroup US Inc. has a parent-subsidiary relationship with any of the other Defendants. 20 While ManpowerGroup US Inc.’s director of payroll services asserts that ManpowerGroup 21 Inc. has never employed associates, id. ¶ 9, it appears that Manpower Inc. did employ associates in 22 California when the company was still known by that name. See ECF No. 47-3 (Order Granting 23 Final Approval of Class Action Settlement in Willner). 24 Among other things, ManpowerGroup US Inc. provides back-office services, including 25 payroll processing services, for Manpower CP and Manpower US. ECF No. 48-1 ¶ 8. Sunny 26 Ackerman, the Vice President and General Manager of the West Division of ManpowerGroup US 27 28 2 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 Inc., asserts that she oversees operations at both Manpower US and Manpower CP. ECF No. 48-6 2 (Ackerman Decl.) ¶ 3. According to Defendants, ManpowerGroup US Inc. has provided “day-to- 3 day supervisors for the Manpower US associates, including staffing specialists, on-site managers, 4 and branch managers.” Horne Decl. ¶ 7. For Manpower CP, on the other hand, Defendants assert 5 that ManpowerGroup US Inc. provides only “upper-level operational oversight.” Id. ¶ 8. It is not 6 clear from the present record whether ManpowerGroup US Inc. has a parent-subsidiary 7 relationship with any of the other Defendants. 8 9 B. Plaintiffs’ Allegations The named Plaintiffs Padilla and Guido allege that Defendants employed them and the class members they seek to represent “as Temporary Service Employees performing services for 11 United States District Court Northern District of California 10 Defendants’ clients in numerous different industries.” ECF No. 81 (Second Amended Complaint 12 (“SAC”)) ¶ 19. Among other things, Plaintiffs allege that Defendants required Plaintiffs to attend 13 an internal orientation referred to as the “Manpower Orientation” as well as trainings related to 14 Defendants’ timekeeping and other internal processes. Id. ¶ 23. Plaintiffs allege that Defendants 15 required Plaintiffs to “consult with Defendants regarding the status of assignments, provide 16 information to Defendants regarding their availability, [and] update Defendants’ databases 17 regarding changes in their qualifications.” Id. Plaintiffs further allege that Defendants required 18 Plaintiffs to attend client-specific orientations and meetings, including post-termination meetings. 19 Id. Plaintiffs assert that Defendants did not pay Plaintiffs wages for engaging in these activities, 20 nor did Defendants reimburse them for expenses incurred related to these activities. Id. 21 Plaintiffs filed this lawsuit, asserting several claims under California law, in California 22 state court on May 29, 2014. ECF No. 1-1. Plaintiffs allege that Defendants: (1) failed to 23 adequately pay Plaintiffs for reporting to work, SAC ¶¶ 84-88; (2) failed to pay wages for 24 attending trainings and meetings, id. ¶¶ 89-98; (3) failed to pay wages following Plaintiffs’ 25 demands, id. ¶¶ 99-104; (4) failed to pay minimum wage, id. ¶¶ 105-114; (5) failed to provide 26 legally compliant wage statements, id. ¶¶ 115-127; (6) failed to pay wages within a legally 27 28 3 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 mandated timeframe, id. ¶¶ 128-134; and (7) failed to pay all wages upon termination, id. ¶¶ 135- 2 140. Plaintiffs also assert claims under (8) California’s Private Attorneys General Act (“PAGA”), 3 id. ¶¶ 141-49, and (9) California’s Unfair Competition Law (“UCL”), id. ¶¶ 150-57. 4 C. Other Cases Against Manpower Entities 1. Willner 6 This is not the first wage and hour class action filed against one or more Manpower 7 entities. Significant to the instant motion, the case Willner v. Manpower, Inc., No. 11-CV-02846- 8 JST (N.D. Cal.), was filed on March 17, 2011. ECF No. 84-3 at 2. Vera Willner, an hourly 9 employee of Manpower, Inc. filed a complaint alleging: (1) violations of California Labor Code 10 sections 201.3(b)(1) and 203 for failure to pay timely weekly wages; (2) violations of California 11 United States District Court Northern District of California 5 Labor Code section 226 for failure to furnish accurate wage statements; (3) violations of the 12 California UCL for failure to provide accurate wage statements and to pay timely wages; (4) 13 penalties under PAGA for failure to provide accurate wage statements and to pay timely wages; 14 and (5) violations of California Labor Code sections 201 and 203 for failure to pay timely wages 15 due at separation. ECF No. 49-1 (Willner Dkt. No. 118, Fifth Amended Complaint). Manpower 16 Inc. was the only named defendant in Willner. Id. ¶ 10. 17 2. Ramirez and Mata 18 On February 13, 2013, Patricia Ramirez filed a putative class action complaint in Monterey 19 County Superior Court against Manpower Inc., ManpowerGroup Public Sector Inc., and 20 Manpower Group US Inc. ECF No. 84-5 at 1. On June 21, 2013, the Ramirez Defendants 21 removed the case to the U.S. District Court for the Northern District of California, No. 22 13-CV-02880-BLF. Id. (Notice of Removal). Similar to the complaint in the instant case, the 23 Ramirez action alleged that employees of the Ramirez Defendants were required to perform work 24 for which they were not paid, including attending orientations, interviews, and trainings. See 25 generally ECF No. 85-2 (Ramirez Second Amended Complaint). In May 2014, after discovering 26 that Ramirez had filed for bankruptcy and neglected to list the class action as an asset, the Ramirez 27 28 4 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 Defendants filed a summary judgment motion against Ramirez. ECF No. 85-4 (Motion). Just 2 after the Ramirez Defendants filed their motion, on May 29, 2014, Plaintiffs Padilla and Guido 3 filed the Mata action in Monterey County Superior Court. U.S. District Judge Beth Labson 4 Freeman granted the Ramirez Defendants’ motion for summary judgment on July 10, 2014. ECF 5 No. 86-1 (Order). 6 3. The Willner Settlement 7 The Willner parties negotiated a settlement that would result in payment to the class and 8 release certain claims. Concerned with how the settlement might affect their claims, the Mata 9 plaintiffs Guido and Padilla filed objections to the draft settlement agreement in Willner. See, e.g., ECF No. 87-4 (Willner Dkt. No. 154). Manpower Inc. responded by trying to distinguish the 11 United States District Court Northern District of California 10 cases. Among other things, Manpower Inc. argued that Padilla and Guido “lack[ed] standing to 12 object” because they were employed by Manpower CP, not Manpower Inc. (the only named 13 defendant in Willner). See ECF No. 88-4 (Willner Dkt. No. 162) at 1-2. Moreover, Manpower 14 Inc. attempted to distinguish the claims at issue by arguing that Willner’s request for Section 203 15 penalties was “predicated upon the late mailing of paychecks,” whereas the underlying claim 16 asserted in Mata alleged “failure to pay any wages whatsoever for certain hours worked.” Id. at 4. 17 Accordingly, Manpower Inc. argued, “the claims in Mata are unrelated to the claims in the 18 [Willner] Fifth Amended Complaint.” Id. Guido and Padilla renewed their objections, ECF No. 19 49-3 (Willner Dkt. No. 170), and filed a motion to relate the Willner and Mata cases, ECF No. 88- 20 7 (Willner Dkt. No. 171). Manpower Inc. responded by again explaining its position that “the 21 request for §203 waiting time penalties in [Willner] ‘is founded upon a claim that paychecks . . . 22 were timely mailed but untimely received’ . . . while the request for §203 waiting time penalties in 23 Mata is founded on a completely different legal theory and a completely different set of alleged 24 facts.” ECF No. 89-1 (Willner Dkt. No. 181) at 2. 25 26 27 28 On June 22, 2015, U.S. District Judge Jon Tigar granted final approval of the Willner class action settlement. ECF No. 47-3 (Order Granting Final Approval of Class Action Settlement, 5 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 Willner Dkt. No. 208). The Willner settlement agreement contained a release. See ECF No. 49-10 2 (Joint Stipulation of Settlement and Release, Willner Dkt. No. 196-1) ¶ 18. It defined “Released 3 Parties” as follows: 18. “Released Parties” mean (i) ManpowerGroup Inc. (formerly known as Manpower Inc.); (ii) any of their present and former parents, subsidiaries and affiliated companies or entities; and (iii) the officers, directors, employees, partners, shareholders, agents, successors, assigns and legal representatives of the entities included in (i) and (ii). Released parties do not include franchisees of Manpower Group Inc. fka Manpower. 4 5 6 7 8 Id.2 In relevant part, the agreement defined the “Released Claims” as follows: 55. Settlement Class Members’ Release of Claims: Unless he or she has properly elected not to participate in the Settlement pursuant to its terms, each Settlement Class Member releases and discharges the Released Parties from Released Claims for the Release Period, March 17, 2010 through January 20, 2012, as follows: 9 10 United States District Court Northern District of California 11 12 a. Released Claims. Released Claims are any and all claims . . . that arise out of the allegations in the Lawsuit that (1) the Released Parties did not provide accurate, itemized wage statements containing the format or content required by California Labor Code section 226, (2) the Released Parties did not timely pay all wages owed, or (3) otherwise arise from the allegations in the Lawsuit, . . . including but not limited to, claims for penalties under California Labor Code section 226 and/or the California Private Attorneys General Act of 2004 (California Labor Code sections 2699 et seq.), claims for unfair business practices in violation of California Business and Professions Code sections 17200, et seq., and related claims for damages, punitive damages, liquidated damages, restitution, equitable relief, attorneys' fees, interest and costs. 13 14 15 16 17 18 19 Settlement Class Members do not release the Released Parties from any claims . . . for unpaid wages which is defined in the California Labor Code as “all amounts for labor performed” (hereafter, “Unreleased Claims”). 20 21 22 Id. ¶ 55 (emphasis added). The agreement defined the “Settlement Class” as follows: 21. “Settlement Class” and “Settlement Class Member(s)” mean all persons who were or are employed by Manpower Inc. in California as temporary employees at any time from March 17, 2010 through January 20, 2012 and who received their wage statements (i.e., 23 24 25 26 27 28 2 Manpower CP operated as an independently owned Manpower franchise until 2008, when Manpower Inc. purchased Manpower CP. ECF No. 48-1 (Horne Decl.) ¶ 5. 6 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT paystub) by U.S. mail, payment card or electronic transmission, except individuals who were or are at the same time jointly employed by a franchisee of Manpower, including, but not limited to, franchisee CLMP LTD., dba Manpower of Temecula. 1 2 3 Id. ¶ 21. 4 D. Procedural History of the Instant Lawsuit Plaintiffs Juventina Mata and Lesli Guido filed their original class action complaint against 5 6 Defendants in this case on May 29, 2014 in Monterey County Superior Court. ECF No. 1-1. The 7 original complaint sought compensation and penalties for alleged violations during a “Class 8 Period” defined as “the period of time beginning four years before the commencement of this 9 action through the date on which each class or subclass herein is confirmed.” Id. ¶ 2. On July 21, 2014, Plaintiffs filed a First Amended Complaint (“FAC”) in state court. ECF No. 1-2, Ex. C. 11 United States District Court Northern District of California 10 Among other changes, the FAC added Claudia Padilla as a Plaintiff and expanded the proposed 12 Class Period to “the period of time beginning February 13, 2009 through the date of entry of 13 Judgment herein.” Id. ¶ 2. Defendants filed an answer to the FAC on August 20, 2014. ECF No. 14 1-2, Ex. F. That same day, Defendants removed this action to the U.S. District Court for the 15 Northern District of California. ECF No. 1. On September 3, 2014, Padilla and Guido, Plaintiffs in the instant case, filed a motion in 16 17 the Willner case to consider whether the Mata case should be related to Willner.3 Mata ECF No. 18 88-7 (Willner Dkt. No. 171). Judge Tigar denied that motion on September 19, 2014. Mata ECF 19 No. 10 (Willner Dkt. No. 183). Judge Tigar’s order explained its reasoning: 20 The claim in Mata is founded on a different legal theory than the one presented [in Willner], and on a different set of alleged facts. ECF No. 171, at 3; ECF No. 181, at 3–4. The two cases therefore do not “concern substantially the same parties, property, transaction or event” and it is unlikely “that there will be an unduly burdensome duplication of labor and expense or conflicting results if the cases are conducted before different Judges.” 21 22 23 24 25 26 27 28 3 Padilla and Guido did not initially file their motion to relate in the docket of the instant case. Rather, in connection with their opposition to Defendants’ summary judgment motion, Plaintiffs filed a copy of the motion previously submitted to Judge Tigar. Mata ECF No. 88-7 (filed Nov. 5, 2015). 7 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 Id. at 2. On July 22, 2015, the Mata parties filed a joint case management statement in the instant 2 3 case. ECF No. 38. The statement indicated that there was no record that Plaintiff Juventina Mata 4 had worked for any of the Defendants. Id. at 5. The statement also indicated that Defendant 5 ManpowerGroup Public Sector, Inc. did not employ temporary non-exempt workers during the 6 Class Period in California. Id. Accordingly, on August 11, 2015, the Mata parties filed a 7 stipulation that dismissed with prejudice all claims against all Defendants by Plaintiff Juventina 8 Mata and dismissed the remaining Plaintiffs’ claims against ManpowerGroup Public Sector, Inc. 9 ECF No. 42. Thus, Padilla and Guido are the only remaining named Plaintiffs in the instant case. After obtaining leave from the undersigned judge, ECF No. 78, Plaintiffs filed a Second 10 United States District Court Northern District of California 11 Amended Complaint in the instant case on November 2, 2015, ECF No. 81. The Second 12 Amended Complaint (1) added ManpowerGroup Inc. as a Defendant and (2) revised the FAC’s 13 proposed class definitions. 14 On August 27, 2015, while Plaintiffs’ motion for leave to file the SAC was still pending, 15 Defendants filed the instant motion for summary judgment. ECF No. 48. After Plaintiffs’ initial 16 opposition to the motion was stricken, ECF No. 79, Plaintiffs filed a renewed opposition on 17 November 5, 2015. ECF No. 106. Defendants filed a reply on November 12, 2015. ECF No. 18 120. 19 II. 20 21 EVIDENTIARY CONSIDERATIONS A. Judicial Notice In connection with the pending motion, both sides request that the Court take judicial 22 notice of various documents previously filed in (1) this case; (2) in other cases in this district; and 23 (3) in the Monterey County Superior Court. ECF Nos. 49, 84, 121. These unopposed requests are 24 GRANTED. See Duckett v. Godinez, 67 F.3d 734, 741 (9th Cir. 1995) (holding that judicial 25 notice is appropriate with respect to federal court and state court proceedings). 26 27 28 B. Objections 8 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 In their opposition brief, Plaintiffs assert a blanket objection to several paragraphs of the 2 declarations of Sunny Ackerman and Mark Horne (including exhibits referenced therein) on the 3 basis that the proffered evidence is irrelevant, lacks foundation, is based on hearsay, and/or calls 4 for an improper expert opinion. ECF No. 106 at 1 n.1. Plaintiffs do not explain the basis for their 5 objections to any specific paragraph or document. Other than Plaintiffs’ foundation objection, 6 which is discussed below, to the extent that the Court can deduce the basis for Plaintiffs’ 7 objections, the objections lack merit and are overruled. Ackerman and Horne describe the 8 business structures of the Manpower entities and thus provide facts that are clearly relevant to 9 Plaintiffs’ joint employer theory, among other issues. The documents about which these witnesses testify appear to be government or business records, providing at least a plausible basis to 11 United States District Court Northern District of California 10 overcome Plaintiffs’ hearsay objection. Moreover, the Court cannot discern any improper expert 12 opinions in these witnesses’ declarations. To the extent that Plaintiffs are objecting that Defendants have not provided a sufficient 13 14 foundation for Ackerman and Horne to testify about the detailed operations of Manpower CP, the 15 issue is a closer call. This is because both witnesses are employees of ManpowerGroup US, Inc.,4 16 as opposed to Manpower CP, and Defendants maintain that Manpower CP employs its own “day- 17 to-day supervisors for the associates, including staffing specialists and branch managers.” ECF 18 No. 48 at 7. On the other hand, Plaintiffs’ argument that all of the Manpower entities are joint 19 employers is based in part on the premise that the companies share management. See, e.g., ECF 20 No. 106 at 15 (citing testimony from Horne to argue that Ackerman “has responsibility for 21 employees of both Manpower California Peninsula and Manpower US”). Accordingly, the Court 22 finds that Defendants have laid a sufficient foundation for these witnesses’ testimony, and 23 Plaintiffs’ objection is overruled. 24 III. LEGAL STANDARD Summary judgment is proper where the pleadings, discovery and affidavits demonstrate 25 26 27 28 4 ECF No. 48-1 (Horne Decl.) ¶ 2; ECF No. 48-6 (Ackerman Decl.) ¶ 2. 9 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 that there is “no genuine dispute as to any material fact and the movant is entitled to judgment as a 2 matter of law.” Fed. R. Civ. P. 56(a). Material facts are those that may affect the outcome of the 3 case. Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248 (1986). A dispute as to a material fact is 4 genuine if there is sufficient evidence for a reasonable jury to return a verdict for the nonmoving 5 party. Id. 6 The party moving for summary judgment bears the initial burden of identifying those portions of the pleadings, discovery and affidavits which demonstrate the absence of a genuine 8 issue of material fact. Celotex Corp. v. Cattrett, 477 U.S. 317, 323 (1986). Where the moving 9 party will have the burden of proof on an issue at trial, it must affirmatively demonstrate that no 10 reasonable trier of fact could find other than for the moving party. But on an issue for which the 11 United States District Court Northern District of California 7 opposing party will have the burden of proof at trial, the moving party need only point out “that 12 there is an absence of evidence to support the nonmoving party’s case.” Id. at 325. 13 Once the moving party meets its initial burden, the nonmoving party must go beyond the 14 pleadings and, by its own affidavits or discovery, set forth specific facts showing that there is a 15 genuine issue for trial. See Fed. R. Civ. P. 56(c)(1)(A). The court is only concerned with disputes 16 over material facts, and “[f]actual disputes that are irrelevant or unnecessary will not be counted.” 17 Anderson, 477 U.S. at 248. It is not the task of the court to scour the record in search of a genuine 18 issue of triable fact. Keenan v. Allen, 91 F.3d 1275, 1279 (9th Cir. 1996). The nonmoving party 19 has the burden of identifying, with reasonable particularity, the evidence that precludes summary 20 judgment. Id. If the nonmoving party fails to make this showing, “the moving party is entitled to 21 judgment as a matter of law.” Celotex Corp., 477 U.S. at 323. 22 The court’s function on a summary judgment motion is not to make credibility 23 determinations or weigh conflicting evidence with respect to a disputed material fact. See T.W. 24 Elec. Serv. v. Pacific Elec. Contractors Ass’n, 809 F.2d 626, 630 (9th Cir. 1987). The evidence 25 must be viewed in the light most favorable to the nonmoving party, and the inferences to be drawn 26 from the facts must be viewed in a light most favorable to the nonmoving party. See id. at 631. 27 28 10 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 IV. Defendants move for summary judgment on two grounds. First, Manpower Inc. (now 2 3 4 5 6 7 known as ManpowerGroup Inc.) contends that the settlement and release in Willner prohibits the putative class members from pursuing in the instant case the seventh claim under California Labor Code § 203, as well as the eighth and ninth claims under PAGA and the UCL, respectively. Second, Manpower US contends that the named Plaintiffs were employed only by Manpower CP and not Manpower US, and thus Plaintiffs lack standing to sue Manpower US. A. Effect of the Willner Settlement 8 The parties initially dispute what legal standard applies to determine the preclusive effect 9 10 United States District Court Northern District of California 11 12 13 14 of the Willner settlement. Defendants argue that the Court should apply state law to determine whether res judicata precludes Plaintiffs’ claims, and Plaintiffs argue that federal law should apply. The Court need not reach this issue because, as explained below, the Court finds that res judicata would not bar Plaintiffs’ claims either under state law5 or under the doctrine of judicial estoppel. Under California law, “[r]es judicata, or claim preclusion, prevents relitigation of the same 15 16 17 18 19 20 21 22 23 24 25 26 27 28 DISCUSSION cause of action in a second suit between the same parties or parties in privity with them.” Mycogen Corp. v. Monsanto Co., 28 Cal. 4th 888, 896 (2002). Claim preclusion applies when three requirements are satisfied: (1) the prior proceeding resulted in a final judgment on the merits; (2) the present action is on the same cause of action as the prior proceeding; and (3) the party to be precluded was a party or in privity with a party to the prior proceeding. Boeken v. Philip Morris USA, Inc., 48 Cal. 4th 788, 797 (2010) (citations omitted). “Even if these threshold requirements are established, res judicata will not be applied ‘if injustice would result or if the public interest requires that relitigation not be foreclosed.’” Consumer Advocacy Group, Inc. v. ExxonMobil Corp., 168 Cal. App. 4th 675, 686 (2008) (quoting Citizens for Open Access to Sand and Tide, Inc. v. Seadrift Ass’n, 60 Cal. App. 4th 1053, 1065 (1998)). 5 Plaintiffs also concede that a federal court sitting in diversity can incorporate state law to the extent that it is compatible with federal interests. ECF No. 106 at 17-18. 11 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 The parties seem to dispute not only the preclusive effect of the Willner settlement, but, 2 more fundamentally, which claims Defendants are attempting to preclude. In their reply brief, 3 Defendants clarify that “Manpower Inc. is not claiming the Willner release bars the named 4 Plaintiffs from pursuing any of their individual claims.” ECF No. 120 at 8. Defendants explain 5 that this is because “[t]he named Plaintiffs were not on the Willner class list. They did not receive 6 notice of the settlement and are not bound by it.” Id. Rather, Defendants argue, “Manpower Inc. 7 is simply asking this Court to rule any employee bound by the court-approved Willner settlement 8 is barred from pursuing the claims resolved in that case.” Id. The parties’ dispute, then, relates to 9 which claims were resolved in Willner and which individuals are bound by the Willner settlement. Under the first res judicata factor, the parties do not appear to dispute that the Willner 10 United States District Court Northern District of California 11 settlement constitutes a final judgment on the merits. See ECF No. 106 at 9 (noting that Judge 12 Tigar granted final approval of the settlement); ECF No. 120 at 9 (“The finality of the judgment in 13 Willner is beyond dispute.”). Under the second factor, in determining whether the causes of action in Willner and this 14 15 case are the same, the Court initially notes that the Willner settlement only encompasses claims for 16 violations that occurred from March 17, 2010 through January 20, 2012. ECF No. 49-10 (Willner 17 Dkt. No. 196-1) ¶ 55. The operative complaint in this case, on the other hand, defines a broader 18 class period: “the period of time beginning February 13, 2009, through the date of entry of 19 Judgment herein” SAC ¶ 2. It is undisputed that the Willner settlement does not preclude 20 Plaintiffs’ claims for violations that occurred outside the March 17, 2010 through January 20, 21 2012 period, even for individuals who were class members in Willner. The more difficult question is whether the causes of action are substantively the same. 22 23 While it is true that both the Willner and the Mata complaints recite claims under Cal. Labor Code 24 § 203, the PAGA, and the UCL,6 Manpower Inc.’s representations in Willner suggest that the 25 26 27 28 6 Compare SAC, claims 7-9, with ECF No. 49-1 (Willner Dkt. No. 118, Fifth Amended Complaint), claims 1, 3, and 4. 12 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 causes of action are not the same. For example, to overcome the Mata Plaintiffs’ objections and 2 obtain approval of the settlement, Manpower Inc. distinguished the claims at issue by arguing that 3 Willner’s request for Section 203 penalties was “predicated upon the late mailing of paychecks,” 4 whereas the underlying claim asserted in Mata alleged “failure to pay any wages whatsoever for 5 certain hours worked.” ECF No. 88-4 (Willner Dkt. No. 162) at 4. In light of the Mata Plaintiffs’ 6 objections, the Willner Court ruled that the parties needed to narrow the scope of the release in that 7 case. ECF No. 88-6 (Willner Dkt. No. 177) at 12-13. The Willner Court recommended that the 8 parties change the phrase “related in any way” in paragraph 55 of the release to the phrase “arise 9 out of the allegations in the operative complaint.” Id. (noting that “a settlement agreement may preclude a party from bringing a related claim in the future even though the claim was not 11 United States District Court Northern District of California 10 presented and might not have been presentable in the class action, but only where the released 12 claim is based on the identical factual predicate as that underlying the claims in the settled class 13 action.”); see ECF No. 49-10 ¶ 55.a (Settlement Agreement and Release, showing revision). Even 14 after the parties amended the draft agreement as the Willner Court recommended, Guido and 15 Padilla again objected. ECF No. 89-5 (Willner Dkt. No. 187). Manpower Inc. responded by again 16 explaining its position that “the release only pertains to the claims alleged in the ‘Lawsuit,’ which 17 is specifically defined as the [Willner] Fifth Amended Complaint.” ECF No. 89-6 (Willner Dkt. 18 No. 189) at 3. 19 Based on Manpower Inc.’s representations regarding the scope of the Willner settlement, 20 the Court finds that the release was only intended to encompass claims based on untimely receipt 21 of paychecks, not claims such as those here based on a complete failure to pay. Moreover, even if 22 Manpower Inc. intended for the release to have a broader preclusive effect, such a release would 23 have been invalid under Ninth Circuit law. In Hesse v. Sprint, for example, the Ninth Circuit held 24 that “[a] settlement agreement may preclude a party from bringing a related claim in the future 25 even though the claim was not presented and might not have been presentable in the class action, 26 but only where the released claim is based on the identical factual predicate as that underlying the 27 28 13 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 claims in the settled class action.” Hesse v. Sprint Corp., 598 F.3d 581, 590 (9th Cir. 2010) 2 (internal quotation marks omitted) (emphasis added). The Willner and Mata cases were based on 3 different factual predicates, so it would have been impermissible for the Willner parties to obtain a 4 release broad enough to cover the claims in the instant case. 5 With regard to the third res judicata factor, the Court finds that there is at least a potential 6 dispute of fact as to whether the parties whose claims Defendants seek to preclude were members 7 of the settlement class in Willner. The Court acknowledges that the putative class definitions in 8 this case appear quite similar to the settlement class defined in Willner. Compare SAC ¶¶ 19, 74 9 with ECF No. 49-10 (Willner Dkt. No. 196-1) ¶ 21. Moreover, the parties dispute whether all of the Manpower entities jointly employed the putative class members in the instant case. Thus, it is 11 United States District Court Northern District of California 10 unclear which putative class members, if any, in the present case would overlap with the class 12 member list created in Willner, a case in which Manpower Inc. was the only named defendant. 13 Moreover, the Court notes that the Willner class list was filed under seal. ECF No. 92-4 (Willner 14 Dkt. No. 206). Thus, even if Defendants wished to show that a high percentage of the class 15 members in the present case released their claims in Willner, on the present record, the Court and 16 Plaintiffs’ counsel would not be able to verify Defendants’ assertions. 17 Based on the finality of the prior judgment, differences in the causes of action, and 18 differences in the parties in the proceedings, the Court concludes that res judicata does not bar the 19 putative class members’ seventh, eighth, and ninth claims in the instant case. 20 Aside from the res judicata framework, the Court would reach the same result under the 21 doctrine of judicial estoppel. “[J]udicial estoppel, generally prevents a party from prevailing in 22 one phase of a case on an argument and then relying on a contradictory argument to prevail in 23 another phase.” Milton H. Greene Archives, Inc. v. Marilyn Monroe LLC, 692 F.3d 983, 993 (9th 24 Cir. 2012) (quoting New Hampshire v. Maine, 532 U.S. 742, 749 (2001)). Courts consider three 25 factors in determining whether judicial estoppel applies: 26 27 28 First, a party’s later position must be clearly inconsistent with its earlier position. Second, courts regularly inquire whether the party 14 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT has succeeded in persuading a court to accept that party’s earlier position, so that judicial acceptance of an inconsistent position in a later proceeding would create the perception that either the first or the second court was misled. . . . A third consideration is whether the party seeking to assert an inconsistent position would derive an unfair advantage or impose an unfair detriment on the opposing party if not estopped. 1 2 3 4 Id. at 993-94 (quoting New Hampshire, 532 U.S. at 750-51). 5 6 7 Here, Defendants’ prior position that “the claims in Mata are unrelated to the claims in the [Willner] Fifth Amended Complaint,” ECF No. 88-4 (Willner Dkt. No. 162) at 4, is clearly inconsistent with Defendants’ present attempt at preclusion. Moreover, the Willner Court 8 accepted the proposed settlement only after ordering the parties to narrow the scope of the release 9 to avoid capturing claims that go beyond the scope of the allegations in the Willner complaint. 10 ECF No. 88-6 (Willner Dkt. No. 177) at 12-13; ECF No. 49-10 (Willner Dkt. No. 196) at 5. 11 United States District Court Northern District of California Defendants would certainly impose an unfair detriment on Plaintiffs if this Court were to 12 conclude—contrary to Defendants’ prior position—that the Willner settlement agreement released 13 claims based on allegations that were not present in Willner. 14 Accordingly, the Court finds that the Willner settlement and release does not preclude the 15 putative class members’ seventh, eighth, and ninth claims under California Labor Code § 203, the 16 PAGA, or the UCL. Of course, any attempts by members of the Willner settlement class to 17 relitigate their claims from that case are precluded.7 18 B. Plaintiffs’ Standing to Sue Manpower US 19 Defendants contend that summary judgment on all claims against Manpower US Inc. 20 (“Manpower US”) is appropriate because Plaintiffs have not shown that either named Plaintiff in 21 this case, Padilla or Guido, worked for Manpower US. Rather, Defendants contend, the named 22 Plaintiffs worked only for Manpower, Inc./California Peninsula (“Manpower CP”) and thus do not 23 have standing to sue Manpower US. 24 25 26 27 28 7 Because the Court finds that Defendants are not entitled to summary judgment on res judicata grounds, the Court need not address Plaintiffs’ other arguments regarding notice, the alleged violation of Civil Local Rule 3-13, or Ms. Willner’s adequacy as a class representative. 15 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 As a formal, structural matter, Manpower CP and Manpower US are sibling corporations 2 with a common parent, ManpowerGroup Inc. (formerly known as Manpower Inc.). ECF No. 48-1 3 ¶ 2. A separate entity, ManpowerGroup US Inc., provides high-level oversight for both 4 Manpower CP and Manpower US, ECF No. 48-6 ¶ 4, but it is unclear from the record whether 5 ManpowerGroup US Inc. has a parent-subsidiary relationship with any of the other Defendants. 6 These relationships are illustrated graphically below: 7 8 9 ManpowerGroup US Inc. Oversight (formerly Manpower Inc.) 10 United States District Court Northern District of California 11 ManpowerGroup Inc. (formerly Manpower Inc.) Parent 12 13 14 15 Subsidiaries Manpower Inc. / California Peninsula (Manpower CP) Manpower US Inc. (Manpower US) 16 Plaintiffs respond to Defendants by arguing that, notwithstanding structural formalities, this Court 17 should find as a matter of law that Manpower CP, Manpower US, and ManpowerGroup Inc. 18 (formerly Manpower Inc.) all jointly employed Plaintiffs. Defendants concede that Manpower 19 CP, for whom Plaintiffs worked, and ManpowerGroup Inc., the corporate parent of Manpower CP, 20 are proper defendants in this case. Defendants seek summary judgment on the claims against 21 solely Manpower US, the corporate sibling of Manpower CP. Defendants contend that Manpower 22 US did not jointly employ Plaintiffs. 23 Under California law, an entity must meet one of three tests to be liable as a “joint 24 employer.” An employer must either (1) exercise control over the employee’s wages, hours or 25 working conditions; or (2) allow him to suffer work or permit him to work; or (3) engage him, 26 creating a common law employment relationship. See Futrell v. Payday California, Inc., 190 Cal. 27 28 16 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 App. 4th 1419, 1429 (2011) (citing Martinez v. Combs, 49 Cal. 4th 35, 64 (2010)). The parties 2 agree that the Martinez analysis applies in determining a joint employment relationship. See ECF 3 No. 106 at 10; ECF No. 120 at 6. 4 Plaintiffs’ opposition asserts that Defendants have not offered any evidence to refute the 5 complaints’ allegations that Defendants jointly employed plaintiffs. ECF No. 106 at 11. To the 6 extent that plaintiffs are suggesting that Defendants have the burden of disproving the allegations 7 in Plaintiffs’ complaint, this suggestion is incorrect. Here, Plaintiffs have the burden to prove 8 wrongdoing by each named Defendant, and Defendants need only point to the absence of evidence 9 that supports Plaintiffs’ allegations. See Celotex, 477 U.S. at 325. 10 While Defendants do not have the burden to disprove the existence of a joint employment United States District Court Northern District of California 11 relationship, Defendants provided sworn declarations and supporting documents from two 12 witnesses in support of Defendants’ position. Sunny Ackerman, Vice President and General 13 Manager of the West Division of ManpowerGroup US, the entity that provides oversight for both 14 Manpower CP and its corporate sibling Manpower US, explained that she oversees both 15 Manpower CP and Manpower US at a high level, but her role with CP is limited: 16 17 18 19 20 21 22 Although I provide upper-level oversight of California operations, I do not exercise immediate, day-to-day control or conduct immediate daily supervision of CP associates. In this regard, my daily control of hourly associates who provide staffing services for clients is limited. For example, I am not involved in the candidate application process, the onboarding of associates, or associates’ application for specific assignments. I do not communicate with associates or clients about specific assignment start dates, work restrictions, daily work scheduling, or the rate of pay of particular associates. I do not assist associates’ with the completion of forms or documents for particular clients, or communicate directly with associates about time entry. ECF No. 48-6 ¶ 4. Moreover, Mark Horne, the Director of Payroll Services at ManpowerGroup 23 US, the entity that provides oversight for both Manpower CP and its corporate sibling Manpower 24 25 US, declared that “Manpower US provides no services and no operational support for CP.” ECF No. 48-1 ¶ 8. Horne went on to explain that “Manpower US does not set the rate of pay, date of 26 the assignment, or particular work restrictions for CP associates.” Id. ¶ 32. Moreover, he states, 27 28 17 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 “Manpower US employees are not involved in the day-to-day supervision of CP associates.” Id. 2 ¶ 34. Nor are Manpower US personnel involved in termination decisions of Manpower CP 3 associates. Id. ¶ 38. In short, Defendants presented evidence suggesting that Manpower US and 4 its employees did not jointly employ the named Plaintiffs, who nominally worked for Manpower 5 CP, under the framework of Martinez. 6 In response to Defendants’ evidence, Plaintiffs argue that some of Defendants’ own 7 evidence supports the existence of a joint employment relationship. For example, Plaintiffs argue, 8 Horne concedes that both Manpower CP and Manpower US are wholly-owned subsidiaries of the 9 same corporate parent. ECF No. 106 at 12. Having a common corporate parent, however, does not necessarily render two corporations joint employers. Other district courts in the Ninth Circuit 11 United States District Court Northern District of California 10 have found that a plaintiff lacks standing to represent employees of corporate affiliates with which 12 the plaintiff was not actually employed. For example, in Henry v. Circus Circus, the plaintiffs 13 worked for Mandalay Corp., a subsidiary of Mandalay Resort Group. Henry v. Circus Circus 14 Casinos, Inc., 223 F.R.D. 541, 542 (D. Nev. 2004). Although the plaintiffs did not work for 15 Mandalay Resort Group’s other subsidiaries and joint ventures, the plaintiffs named all of these 16 parties as defendants in a class action. Id. The court dismissed all affiliate defendants other than 17 the corporation for which the plaintiffs actually worked and found that plaintiffs lacked standing to 18 sue the others. Id. at 543-44. Similarly, in Solis v. Regis Corp., the district court ruled that the 19 plaintiff, an employee of Supercuts, did not have standing to serve as a class representative against 20 non-Supercuts subsidiaries of Supercuts’ corporate parent Regis. Solis v. Regis Corp., No. 21 C 05-03039 CRB, 2006 WL 2925682, at *7 (N.D. Cal. Oct. 12, 2006). See also Miller v. Swiss Re 22 Underwriters Agency, Inc., No. CV 09-09551 DDP (JEMx), 2010 WL 935697, at *3 (C.D. Cal. 23 Mar. 15, 2010) (“That a third entity, not named as a defendant, exercises control over both entities 24 is not sufficient” to render two companies a de facto joint enterprise.). 25 26 27 28 Plaintiffs also cite Castaneda v. The Ensign Group, Inc., 229 Cal. App. 4th 1015, 1019 (2014), for the proposition that a trier of fact could infer control from evidence that a parent 18 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 corporation owns a subsidiary. ECF No. 106 at 12 n.11. Plaintiffs’ reliance on Castaneda is 2 misplaced. That case concerned allegations that a parent company was a joint employer of its 3 subsidiary. There, the court held that the parent corporation could be the plaintiff’s employer 4 because it exercised control over the subsidiary’s business. Id. at 1023-24. Here, in contrast, 5 Defendants concede that Manpower CP’s parent, ManpowerGroup Inc., is a proper defendant in 6 this case. Defendants seek summary judgment solely as to Manpower CP’s corporate sibling, 7 Manpower US. Beyond the existence of a common parent, Plaintiffs submit other evidence in an attempt to 8 9 raise a triable issue of fact that Manpower CP and Manpower US are joint employers. For example, Plaintiffs note that according to various documents filed with the Horne declaration, 11 United States District Court Northern District of California 10 Manpower CP and Manpower US have the same corporate address in Milwaukee. E.g. ECF No. 12 48-2 Ex. 3 at 2 (Manpower US Certificate of Qualification to conduct business in California); Ex. 13 4 (Cal. Sec. of State Business Entity Detail for Manpower CP); ECF No. 48-4 Ex. 10 (exemplar 14 W-2 and earnings statements of Plaintiffs from Manpower CP); Ex. 11 (exemplar W-2 and 15 earnings statement for unnamed Manpower US associate). Plaintiffs cite no authority and provide 16 no analysis, however, to support their argument that a corporation jointly employs the personnel of 17 a sibling corporation simply because the two corporations share real estate. Under the Martinez 18 framework, which Plaintiffs agree this Court should apply,8 a common address does not suggest 19 that a sibling corporation controls the employee’s wages, hours, or working conditions; allows the 20 employee to suffer work or permits him to work; or engages the employee, thereby creating a 21 common law employment relationship. Plaintiffs also submit evidence that Manpower CP and Manpower US share the same 22 23 officers. Plaintiffs note that Jonas O. Prising signed the Amendment to the Certification of 24 Incorporation of Manpower International Inc., which changed its name to Manpower US Inc. ECF 25 No. 48-2 Ex. 2. Mr. Prising is also listed as the contact for the mailing address of Manpower CP 26 27 28 8 See ECF No. 106 at 10. 19 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 in that company’s business license for the City of Watsonville, California. ECF No. 48-2 Ex. 5 at 2 5. Moreover, as noted, Ms. Ackerman concedes that she exercises at least some level of oversight 3 for both Manpower CP and its corporate sibling, Manpower US. See ECF No. 48-6 ¶¶ 3-4. Once 4 again, however, Plaintiffs cite no authority and provide no analysis in support of their argument 5 that shared management renders one sibling corporation the joint employer of another sibling 6 corporation’s employees under any of the tests for joint employment set forth in Martinez. 7 Finally, Plaintiffs cite deposition testimony indicating that the checks used to pay the employees of both Manpower CP and its corporate sibling, Manpower US, were drawn on the 9 same bank. ECF No. 99-3 (Horne Dep. Tr.) at 278:24-279:4. Similarly, the funds that were used 10 to pay employees of the corporate parent Manpower, Inc., which is now called ManpowerGroup 11 United States District Court Northern District of California 8 Inc., were drawn from the same account as funds used to pay employees of Manpower CP. Id. at 12 279:5-11. Use of shared accounts does not create a joint employment relationship, however. The 13 Solis Court, for example, found that “[a]ll paychecks for California employees of Regis 14 subsidiaries were drawn on the same bank,” 2006 WL 2925682, *2, but the court nevertheless 15 found that the named plaintiff did not have standing to sue subsidiaries for which she did not 16 actually work. 17 All of the evidence Plaintiffs have proffered suggests that a common entity exerts control 18 over both Manpower CP and its corporate sibling, Manpower US. Plaintiffs’ evidence misses the 19 mark, however, because Defendants do not dispute that Manpower CP and its corporate sibling, 20 Manpower US, share a common parent. Rather, Defendants argue that Plaintiffs have offered no 21 evidence to create a triable issue of fact on the issue of whether Manpower US, the corporate 22 sibling of Manpower CP, is a joint employer of persons employed by Manpower CP. The Court 23 agrees that Plaintiffs have not presented sufficient evidence to create a triable issue of fact on this 24 issue. Accordingly, because Manpower US was not an employer or joint employer of Guido and 25 Padilla, the named Plaintiffs do not have standing to sue Manpower US for violations under the 26 California Labor Code and related provisions. 27 28 20 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT 1 2 3 4 5 6 7 8 9 10 V. CONCLUSION For the foregoing reasons, Defendants’ motion for summary judgment is GRANTED in part and DENIED in part. Defendants’ motion for summary judgment that the settlement and release in Willner preclude the putative class members’ seventh, eighth, and ninth claims against Manpower Inc. is DENIED. Defendants’ motion for summary judgment that Plaintiffs Padilla and Guido lack standing to pursue claims against Manpower US is GRANTED. IT IS SO ORDERED. Dated: March 14, 2016 ______________________________________ LUCY H. KOH United States District Judge United States District Court Northern District of California 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 21 Case No. 14-CV-03787-LHK AMENDED ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS’ MOTION FOR PARTIAL SUMMARY JUDGMENT

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.